Difference between revisions of "DAURE Logistics"

From Jimenez Group Wiki
Jump to: navigation, search
(Instrumentation)
(Instrumentation)
Line 38: Line 38:
 
* J-group is borrowing: HR-TOF-AMS from Eiko Nemitz (CEH, UK)
 
* J-group is borrowing: HR-TOF-AMS from Eiko Nemitz (CEH, UK)
  
* Sally Ng and John Jayne are bringing a Mini-AMS (ACSM)
+
* Sally Ng and John Jayne of Aerodyne are bringing a Mini-AMS (ACSM)
  
 
== To-do List ==
 
== To-do List ==

Revision as of 03:16, 3 February 2009

This Wiki page is a repository for information for the Organization of the Jimenez Group and Related People for the DAURE Campaign. Anyone involved in the campaign can add information directly, but due to problems with Spam you do need to login (and create an account if you don't have one already). You can also email Jose with any information and he can add it quickly to the site.

Logistical Info

  • We will be at the rural site in the Montseny National park, this map has a general relation of the site with Barcelona
  • The best mobile phone and mobile internet coverage is with "Movistar". Those of you with a GSM phone can buy a SIM card to get in their network.
  • There is a landline at the site, it may be possible to dial-up to the internet from there (free dialup in Spain: Gonuts4free)
  • People's contact info
    • Jose's Cell phone: 606-781-823
  • Lodging
    • For the Montseny site we will stay at a house in a nearby village. It has Wifi internet.
  • The last stretch of road to the Montseny site is still in bad shape (it would be dangerous for a regular car). Andres says (3-Feb) that they have been promised that it will be repaired, but they are not sure how complete those will be. Andres has reserved a 4x4 vehicle for the whole period, and they are trying to get two more. With those it would probably be enough, with a car staying at Montseny and another one going back and forth to Barcelona, plus a third for flexibility.

People and Dates

  • Dates: Feb 23 to Mar 27
  • People going: Mike Cubison, Amber Ortega, Carly Robinson, Jose-Luis Jimenez
    • Jose: Jan 31 to Mar 23
    • Mike: 17-Feb (pending Eiko's confirmation) till 28-Mar (off for 1 week sometime between 8-Mar and 22-Mar)
    • Amber: Depart 20-Feb, arrive 21-Feb --> 8-Mar (could be extended as appropriate)
    • Carly: Depart 6-Mar, arrive 7-Mar --> 21-Mar ( " " ")
  • People coming to help us: Eiko Nemitz (?), Chiara (Eiko's group, ?), Manuel Dall'Osto (???), Sanna Saarikoski (???)
  • John Jayne and Sally Ng: will arrive together in Barcelona on Tuesday March 3rd at 9:25 AM. Delta Airlines flight number 9348 coming in from Paris. CSIC (Andres) will arrange to pick them up and bring them to Montseny).

Instrumentation

  • Jimenez group is bringing: PAM + 1 laptop, switching valve system (for PAM) + 2 laptops, SMPS + CPC (no charger), multicomponent box of boxes, DustTrak
  • J-group is borrowing: HR-TOF-AMS from Eiko Nemitz (CEH, UK)
  • Sally Ng and John Jayne of Aerodyne are bringing a Mini-AMS (ACSM)

To-do List

  • Mike will check with Eiko about instrument arrival date, also whether our instruments can run on 220V & 50 Hz
  • Amber will deal from PAM and scrubber for O3, also can PAM run on 220V & 50 Hz
  • Jose will find out about:
    • Where to get transformers for 220 --> 110
    • Home depot, office depot, radio shack, supermarket...
    • Will try to get 4-wheel drive and/or automatic car
    • Ask Xavier about the road
    • determine strategy for accomodation
    • Make lists of contacts for campaign (cell phones, addresses, etc)
    • Is there cell phone coverage at the Montseny site? At the village house?
    • Verify whether we can connect to the internet from site thru dial-up
    • Get phone # for village house and (if available) for village house
    • Ask Jennie about how to address per-diem at rural site
    • Health insurance (get info from expats)