ARCTAS

From Jimenez Group Wiki
Revision as of 12:56, 20 April 2008 by Jose (talk | contribs)
Jump to: navigation, search

The purpose of this page is to serve as a repository of schedules and information for the participation of the Jimenez group in the ARCTAS campaign.

Personnel schedule on group calendar http://www.google.com/calendar/render.

Information on Phase I (past) is below for reference.


Summer Phase

Details to go here.

To-do List for ARCTAS

For Donna (in approx order of priority)

  • Improve Squirreling of the Fast Mode data (F4 and/or F5)

For Mike

  • Resubmit flight 4 w/o the filter periods
  • Process fast data and resubmit with those
  • Evaluate the O/C data from Allison
  • Squirrel & submit test flights 1 & 2
  • Document inlet geometry and lengths, calculate residence time
  • Keep adding plane data to timetrace: work on m/z ratios, and add remaining important IWG parameters
    • Replot timetrace of all flights on this standard format, give copy to Jose for reference)

Instrument - High priority

  • Test exhaust line (to LARGE) for leaks
  • See whether we can afford extra pumping for increasing bypass or connecting the Grimm after doing this
  • Write labels with usual parameters (VB, pumps, PID of PCI...)
  • Start, mid-flight, and shutdown checklists
  • Install all plane software on Mike's laptop, so that his personal laptop can serve as backup for plane laptop in case of catastrophic failure, and test that it works
  • If we can afford the pumping, replumb the Grimm to sample through a critical orifice
    • install TSI flowmeter on this pumping line (filter ahead), log flow

Instrument - high priority, but waiting for others

  • (Waiting for Thomas about TPS error message: uups... / data crc / rx error: 5)

Instrument - medium priority

  • Get an install 2 bike cupholders
  • Get soldering iron with a finer tip
  • Connect UPS software for battery indication
  • Backup all plane software on FTP site (including menus and .set files)

Data analysis - high priority

  • Evaluate whether the different slopes with light scattering are due to size distribution changes (F8)
  • Compare the Grimm OPC with the LARGE OPC and the SP2 OPC for periods of valid Grimm
    • SP2 people are very eager to compare with their volume (> 250 nm)
  • Compare AMS size distributions with OPC / SMPS, to evaluate size transmission

Data analysis - medium priority

  • Filter levels for Org (maybe also NO3, m/z 16) are variable in timetrace, check whether also in Squirrel and if so why)
  • Implement the time-dependent CO2 and H2O corrections for the flights (or decide that they are not needed)
    • We can probably measure frag_org[18] directly in this way
  • Use plumes to align our data to others

Before Summer Campaign

  • Install HV supply for hard mirrow, so that we can run W-mode in forest fire plumes
  • Bring 2 sets of 2 MCPs, change them before test flight (2nd set is spare)
  • Be ready to submit data 48 hrs after each flight (24 better if possible)
  • Fix 12 V power supply in TPS for preamp
  • Be ready to intercompare the Grimm immediately after a flight
  • Think whether to run at higher MCP and lower emission current for forest fires (less chance of missing threshold, reduce change of saturation in fires)
  • Stuff for Joel
    • Fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him
    • Gaps of 5s in fast timetrace?
    • Timetrace of a few HR peaks as in flux mode?
    • Test and enable cell-phone filtering
  • Get sufficient spare orifices (300 and 250 nm)
  • See if we can buy/lease a spare TPS from Tofwerk
  • Bring spare laptop with everything installed, test that everything works, keep in plane
  • Make sure we have a spare battery for thermocouple in plane
  • Get another He lecture bottle
  • Investigate how we can refill the lecture bottle (ask Eric Apel)
  • Replace 2 Gast pumps with MD1 AC powered?
    • Increase bypass flow on inlet line (now limited to ~2.5 lpm)
    • Change our inlet line to 3/8" to allow more flow if possible
  • Ask John whether AC-powered MD1 could run AMS (as backup?)
  • Put together leak detector with V70, controller, AC MD1, and SRS or Balzers RGA


Integration Phase

(inclusive dates):

  • 2/22: Truck leaves Boulder with AMS and rest of kit
  • 2/29: Truck arrives in Palmdale,
  • 3/4: AMS onto plane
  • 3/12: Power Check
  • 3/17: Safety Brief
  • 3/18-20: Test Flights
  • 4/1: Transit to AK


Fairbanks Phase

Timeline

  • 4/1 Jose travels to AK
  • 4/4 Anticipated first science flight
  • 4/21 DC-8 transit to Palmdale - Mike.
  • 4/24 Mike travels back to CO

Hotel for J-Group

  • Company: Sophie's Station
  • Phone: 1-800-528-4916
  • Dates: April 1st - April 21st
  • Name on Reservation: Jose Jimenez & Mike Cubison
  • Confirmation Number: 2733120
  • Total: $75.00/ night to be paid on-site
  • Details: 24 hour cancellation