* Field kit
 
* Field kit
 +
** Inlet schematic for J-Group instruments: account for all fittings+tubing a priori
 
* Driving equipment to LA
 
* Driving equipment to LA
  

Revision as of 14:07, 16 February 2010

This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with the Main CalNex-LA page or the CalNex-LA Logistics page.

Tasks in preparation for CalNex-LA

  • Field kit
    • Inlet schematic for J-Group instruments: account for all fittings+tubing a priori
  • Driving equipment to LA
  • Distribution of tasks while in the field
    • EI-AM
    • PAM
    • MAB-AMS
    • TAG-AMS
    • SMPS, CPC, OPC, DustTrak
    • Downloading data from other instruments and model, making graphs and posting them

Tasks for Michael upon arrival at the site

  • Check electrical connections with plug tester
  • Label all the plugs in all trailers with the circuit number, if not already labeled.
  • Check all pumps with DustTrak and portable CPC (need to borrow from Suzanne Hering) as they are being installed.
  • Post maps of Caltech and the local area, as well as hardware stores etc. in all trailers (next to door).

Tasks for Michael during the experiment

  • Keep on top of butanol scrubbing for our CPCs