Difference between revisions of "Field ToF-AMS Operation"

From Jimenez Group Wiki
Jump to: navigation, search
(Ionization Efficiency (IE) Calibration)
(Particle Size Calibration)
 
(117 intermediate revisions by 8 users not shown)
Line 8: Line 8:
  
 
* ToF-AMS Spares and Repair parts
 
* ToF-AMS Spares and Repair parts
** Filaments (1 set of 2), [http://www.hitecrcd.com/servos/show?name=HS-81 HS-81 servos with metal gears] (3), MCP sets (1-2 sets of 2, stored in vacuum chamber), critical orifices (3)
+
** Filaments (1-2 sets of 2) BN845088-T; [http://www.pfeiffer-vacuum.com/products/analysis-equipment/residual-gas-analysis/residual-gas-analysis-in-ultra-high-vacuum/prismaplus-qmg-220-m-with-c-sem-detector/onlinecatalog.action?detailPdoId=1964 Request Quote here]
** pulsers (if available)
+
** [http://www.hitecrcd.com/servos/show?name=HS-81 HS-81 servos with metal gears] (3)
 +
** MCP sets (1-2 sets of 2, stored in vacuum chamber) (P/N: 33087 MCP 40/12/10/8 D 46:1 CZ 38FF EDR, TC; Contact Lynn Bergeron: l.bergeron@usa.photonis.com;(508)347-4027)
 +
** Critical orifices for pressure at sampling location (3)
 +
** Pulsers (if available)
 
** Miniature tool set to replace filaments etc (check that ALL tools are inside -- the ones missing otherwise are likely to be the ones you need!)
 
** Miniature tool set to replace filaments etc (check that ALL tools are inside -- the ones missing otherwise are likely to be the ones you need!)
 
** Electronics cards: timer card, NI-6024E
 
** Electronics cards: timer card, NI-6024E
 
** Fans for AMS pumps: one small, one large
 
** Fans for AMS pumps: one small, one large
** Clone (recent) of AMS Computer Hard Drive  
+
** [http://cires.colorado.edu/jimenez-group/wiki/index.php/FAQ_AMS_Hardware#Cloning_an_internal_hard_drive Clone] (recent) of AMS Computer Hard Drive
 
** Varian turbos: 1 V301 pump, 1 V70 or V81 pump, 1 V301 controller, 1 V70 or V81 controller (See Ed plan for vacuum failures)
 
** Varian turbos: 1 V301 pump, 1 V70 or V81 pump, 1 V301 controller, 1 V70 or V81 controller (See Ed plan for vacuum failures)
 
** Backing pump  
 
** Backing pump  
Line 25: Line 28:
 
** AC Plug tester
 
** AC Plug tester
 
** Multimeters (2)
 
** Multimeters (2)
** Oscilloscope (Textronix TDS 220 is a nice one)
+
** Oscilloscope (Textronix TDS 220 or similar)
 
*** x10 dividing probe for scope
 
*** x10 dividing probe for scope
 
** Soldering iron
 
** Soldering iron
Line 38: Line 41:
 
* Important spares & parts(flow)
 
* Important spares & parts(flow)
 
** Drycals (low and high range)
 
** Drycals (low and high range)
** Small TSI flowmeters w/ power and RS-232 cables (3)
+
** Rotameters for all important flows w/o particles
 +
** Small TSI flowmeters w/ power and RS-232 cables (3) (for flows that need to be logged)
 
** White HEPA filters (2+) (rated to 70 lpm)
 
** White HEPA filters (2+) (rated to 70 lpm)
 
** Set of two large 2-way valves to test whole inlet with filter regularly
 
** Set of two large 2-way valves to test whole inlet with filter regularly
 
** Blue Balston filters (4x grade AA, rated 3.5 lpm)
 
** Blue Balston filters (4x grade AA, rated 3.5 lpm)
 
** Assorted stainless swagelok
 
** Assorted stainless swagelok
** Assorted brass swagelok
+
** Assorted brass and nylon ferrules
 
** Set of O'Keefe critical orifices (check completeness)
 
** Set of O'Keefe critical orifices (check completeness)
 
** Inlet manifold
 
** Inlet manifold
 
+
** Field Microscope
*Hardware
 
**Field Microscope
 
  
 
* Logistics  
 
* Logistics  
Line 55: Line 57:
 
** Gloves (for moving)
 
** Gloves (for moving)
 
** Latex gloves (for vacuum)
 
** Latex gloves (for vacuum)
** Aerodyne phone number on a cell phone
+
 
 +
== Campaign Daily Checksheet ==
 +
 
 +
Operational parameters for the mass spectrometer, pumps, AMS electronics' box and general inlet flow setup should be checked frequently (ie at least daily) and logged. A worksheet used recently by the Jimenez Group can be found [http://cires.colorado.edu/jimenez-group/Reference/AMS_DailyCheckSheet.xls here]. Note that the items in this worksheet are specific to the setup used and might have to be changed for your particular circumstances.
  
 
== Inlet and Dryer Set up ==
 
== Inlet and Dryer Set up ==
  
=== General References on Particle Transmission thru Inlets ===
+
=== Inlet Considerations ===
  
 
For a guide on particle transmission on inlets, see the following references:
 
For a guide on particle transmission on inlets, see the following references:
Line 75: Line 80:
 
* [http://www.okcc.com/ O'Keefe Critical Orifices]. In particular their assortments of orifices on 1/4 inch steel tubes are extremely useful in the field or lab to be able to quickly control a variety of flows. These are part numbers KK4-30-SS or KK4-90-SS in the [http://www.okcc.com/PDF/Orifice%20Kits%20Catalog%2011%20pg.30-31.pdf Orifice Kit Document]
 
* [http://www.okcc.com/ O'Keefe Critical Orifices]. In particular their assortments of orifices on 1/4 inch steel tubes are extremely useful in the field or lab to be able to quickly control a variety of flows. These are part numbers KK4-30-SS or KK4-90-SS in the [http://www.okcc.com/PDF/Orifice%20Kits%20Catalog%2011%20pg.30-31.pdf Orifice Kit Document]
 
** [http://spreadsheets.google.com/pub?key=rrERJxIGGSy32hihrx1h95Q Table of volumetric flows vs O'Keefe critical orifice sizes] (approximate)
 
** [http://spreadsheets.google.com/pub?key=rrERJxIGGSy32hihrx1h95Q Table of volumetric flows vs O'Keefe critical orifice sizes] (approximate)
 +
 +
* Material: The inlet material needs to be conductive, as otherwise particle losses are severe due to electrophoresis. We normally use copper tubes for short-term studies (~1 month), as they work fine and are easier to work with. Stainless steel is better for longer term studies (years) and setups which are intended to be permanent.
 +
 +
* Black conductive tubing (TSI) should be avoided for the AMS, as it can create chemical contamination from siloxanes that absorb onto the particles, but seems to be ok for non-chemical instruments such as the accumulation-mode SMPS. The two papers below report on the contamination of particles sampled through such tubing with semivolatile siloxanes that evaporate from the tubing and condense on the particles. This has been seen (but not published) in at least a dozen other cases, as far as I know. Note that one paper also reports that the levels of CO2 are perturbed, and it is likely that the levels of other gases are perturbed as well. The contamination is higher with increasing ambient temperature, and it it observed at normal lab temperatures. The particle phase contamination is typically small in terms of mass (unless you are atomizing particles in organic solvents, in which case it can be major), so using black tubing in SMPSs and similar instruments is generally ok. For chemical instruments it is best to not use it at all in any tubing upstream of the analysis, unless your instrument can separate the interference without loss of information. Also one of the papers reports that the affinity of the particles for water is affected by this tubing, thus it may be best to not use it in TDMAs, CCN instruments etc. The papers [http://www.tandfonline.com/doi/abs/10.1080/02786820902984811 Sampling Artifacts from Conductive Silicone Tubing], Timko et al., Aerosol Sci. Technol. 2009; and [http://www.sciencedirect.com/science/article/pii/S1352231009001356 Contamination from electrically conductive silicone tubing during aerosol chemical analysis], Yu et al., Atmospheric Environment, 2009. What causes electrophoresis losses are the surface charges that build on plastic tubing, and are worst for teflon, and also very bad for glass containers. Those surface charges can't be disipated since the material is not conductive, and they lead to high electric fields that attract the particles to the surface and cause their loss from the sampling stream. Any conductive material that can dissipate surface charges will do, and metals should be as good or better than the black tubing since their electrical conductivity is higher.
 +
 +
* Diameter: this depends on the flow. You want to keep laminar flow (Reynolds number < 1000) as particle losses are much higher in turbulent flow than in laminar flow. Sometimes people use Re < 1500 as a cutoff, but that is risky as turbulence starts earlier in vibrating systems with pumps etc. Once the flow is laminar, you need to minimize residence time, as particle losses under laminar flow are just proportional to residence time in the tube. Since you will be using a cyclone to remove dust and avoid clogging of the critical orifice, that will dictate the flow rate, and that will determine the minimum diameter to keep Re < 1000. E.g. for a 10 lpm you need 3/8" OD (but the Re should be calculated with the actual ID, that does vary quite a bit). Then you want to use the smallest diameter which keeps Re < 1000.
  
 
=== Dryer Set Up ===
 
=== Dryer Set Up ===
Line 81: Line 92:
 
It is highly recommended that air is dried before AMS analsysis in order to reduce uncertainties in the bounce-related collection efficiency (Eb) and possible losses in particle transmission (E_L) if the particles grow too large at times of high RH. For more information see [http://cires.colorado.edu/jimenez-group/wiki/index.php/Field_Data_Analysis_Guide#Choose_preliminary_CE_from_observed_composition_and_accumulated_AMS_experience the CE section of the Field Data Analysis Guide].
 
It is highly recommended that air is dried before AMS analsysis in order to reduce uncertainties in the bounce-related collection efficiency (Eb) and possible losses in particle transmission (E_L) if the particles grow too large at times of high RH. For more information see [http://cires.colorado.edu/jimenez-group/wiki/index.php/Field_Data_Analysis_Guide#Choose_preliminary_CE_from_observed_composition_and_accumulated_AMS_experience the CE section of the Field Data Analysis Guide].
  
There are 2 basic types of dryers that can be used. You need 2 dryers if you use diffusion dryers (like the TSI one with silica gel) so that you can regenerate one while the other is being used. However they often have to be replaced daily (depending on ambient RH and size) and doing that automatically is very complicated. (Although possible, IFT Leipzig has built some industrial-quality systems to do this). An easier alternative is to use a nafion dryer. We recommend dryers with metal casing, as those with plastic casing were observed to lead to losses of charged particles by P. McMurry's group (Jose can provide a report on this upon request). For the small flows that are typically needed, the [http://www.permapure.com/Products/MD/MD.htm MD series dryers from Perma Pure] work well. What you need to do is to plumb the aerosol flow through the "straight" path, and then put a critical orifice on one end of the "outside" path and a pump on the other end. You want to have some flow on the outside path, but at a much reduced pressure (~1/10 of 1 atm). What drives the drying is the absolute humidity, so you are dropping that by x10, and that will drive the gas-phase H2O on the aerosol flow through the nafion membrane and to the outside path. A typical Gast pump/compressor will do. Very important, be very careful with the fittings on the dryer, as if rotated strongly one can break the internal connections of the nafion tube, and then you have a large leak and end up sampling room air.
+
There are 2 basic types of dryers that can be used. You need 2 dryers if you use diffusion dryers (like the TSI one with silica gel) so that you can regenerate one while the other is being used. However they often have to be replaced daily (depending on ambient RH and size) and doing that automatically is very complicated. (Although possible, IFT Leipzig has built some industrial-quality systems to do this). An easier alternative is to use a nafion dryer. We recommend dryers with '''metal casing''', as those with plastic casing were observed to lead to losses of charged particles by P. McMurry's group (Jose can provide a report on this upon request). For the small flows that are typically needed, the [http://www.permapure.com/products/dryers/md-gas-dryers/ MD series dryers from Perma Pure] work well. What you need to do is to plumb the aerosol flow through the "straight" path, and then put a critical orifice on one end of the "outside" path and a pump on the other end. You want to have some flow on the outside path, but at a much reduced pressure (~1/10 of 1 atm). What drives the drying is the absolute humidity, so you are dropping that by x10, and that will drive the gas-phase H2O on the aerosol flow through the nafion membrane and to the outside path. A typical Gast pump/compressor will do. Very important, be very careful with the fittings on the dryer, as if rotated strongly one can break the internal seals of the nafion tube, and then you have a large leak and end up sampling room air.
  
If is worth convincing yourself that you don't have a leak by putting a filter before the dryer and sampling with a CPC, and similarly (w/o the filter) convincing yourself that particle number losses thru the dryer are not important.
+
If is worth convincing yourself that you don't have a leak by putting a filter before the dryer and sampling with a CPC, and similarly (w/o the filter) convincing yourself that particle number losses thru the dryer are not important. And of course, it helps to measure the RH before and after the dryer to make sure it is doing what it is supposed to do.
  
 
== Tuning the Ion Source and ToF-MS ==
 
== Tuning the Ion Source and ToF-MS ==
Line 249: Line 260:
  
 
== Ionization Efficiency (IE) Calibration ==
 
== Ionization Efficiency (IE) Calibration ==
<i>(from Peter DeCarlo's powerpoint)</i>
+
<i> (from Peter DeCarlo's powerpoint, adapted by Weiwei Hu, revised by Doug Day and Jose-Luis Jimenez)</i>
  
 
===The Principle of the IE calibration===  
 
===The Principle of the IE calibration===  
Line 256: Line 267:
 
===1 What is the “Known” amount of mass===
 
===1 What is the “Known” amount of mass===
 
*The known amount of mass is based on generation of dry particles size-selected by a DMA system.   
 
*The known amount of mass is based on generation of dry particles size-selected by a DMA system.   
*Typical sizes used in the calibration are 350 ~450 nm in mobility diameter. The critical consideration is that ALL particles must produce detectable signals. Since there will be a distribution of the number of ions produced for various particles (due to random variations of the ionization and detection process, plus the fact that the particles are not truly monodisperse), some particles will produce more ions than others. If only the particles that produce more ions are detected, and the ones that produce fewer ions are not, then the IE determined with the detected particles (with BFSP) will be too high, and the concentrations reported with this IE will be too low. From experience, for typical V-Mode HR-ToF-AMS sensitivity, this requires 400 nm particles. For a Q-AMS 350 nm particles are typical (and this is easier to verify with the graphs in the main PToF window in the Q-AMS software). For a C-ToF-AMS, probably 300 nm may still be sufficient. A way to check whether you are not detecting all particles is to plot the AMS/CPC number ratio as a function of particle size. This ratio should be between 80%-120%, and will have a plateau when all particles are detected, but will decrease when particles start to be too small. It is possible to use larger particles than the minimum size, but normally the number of particles size-selected by the DMA decreases strongly with size, so the statistics of the IE calibration get worse (i.e. the calibration is noisier).
+
*Typical sizes used in the calibration are ~350-450 nm in mobility diameter. The critical consideration is that ALL particles must produce detectable signals. Since there will be a distribution of the number of ions produced for various particles (due to random variations of the ionization and detection process, plus the fact that the particles are not truly monodisperse), some particles will produce more ions than others. If only the particles that produce more ions are detected, and the ones that produce fewer ions are not, then the IE determined with the detected particles (with BFSP) will be too high, and the concentrations reported with this IE will be too low. From experience, for typical V-Mode HR-ToF-AMS sensitivity, this requires 400 nm particles. For a Q-AMS 350 nm particles are typical (and this is easier to verify with the graphs in the main PToF window in the Q-AMS software). For a C-ToF-AMS, 300 nm may still be sufficient. A way to check whether you are not detecting all particles is to plot the AMS/CPC number ratio as a function of particle size. This ratio should be between 80%-120%, and will have a plateau when all particles are detected, but will decrease when particles start to be too small. It is possible to use larger particles than the minimum size, but normally the number of particles produced by the atomizer and size-selected by the DMA decreases strongly with size, so the statistics of the IE calibration get worse (i.e. the calibration is noisier).
*The number concentration should be kept low enough so that the probability of having two particles within one chopper cycle is small (e.g. < 5%). This typically means < 200 particles/cm3. Otherwise you will often have more than one calibration particle during a chopper cycle. However the calibration analysis software assumes that only one particle is present, and then the IE will be overestimated. To estimate the number concentration which is tolerable, let’s assume a 2% chopper duty cycle with a flow of 1.5 cm3/s and a chopper frequency of 130 Hz. If we assume that the output of the DMA has 100 particles/cm3, then each second 100*1.5 =150 particles are entering the instrument. The chopper removes 98% of those, so each second only 150 * 2% = 3 part/sec are reaching the AMS vaporizer. Given the chopper frequency of 130 Hz, that means that 3/130 = 2.3% of the chopper cycles will have a particle, and thus the calibration data is good with respect to this criterion. In fact we could work with 200 part/cm3 and still have less than 5% coincidence errors. (Note that the probability of having two particles, when at least 1 particle is present, is the same probability as having one particle, as this is a Poisson process with uncorrelated events, i.e. one particle doesn’t know what the other particles are doing. E.g. in our example the probability of having one particle in a chopper cycle is 2.3%, and the probability of having two particles in any chopper cycle is 2.3%*2.3%. But the probability of having two particles when at last one is present is 2.3%. So in summary the particle number shold be kept around 200 p/cm3. On the other direction, you can work with much lower particle concentrations without having coincidence errors, but then you will detect very few particles per unit time, and the calibration will take a long time, or be noisy.
+
*The number concentration should be kept low enough so that the probability of having two particles within one chopper cycle is small (e.g. < 5%). This typically means < 200 particles/cm3. Otherwise you will often have more than one calibration particle during a chopper cycle. However, the calibration analysis software assumes that only one particle is present, and then the IE will be overestimated. To estimate the number concentration which is tolerable, let’s assume a 2% chopper duty cycle with a flow of 1.5 cm3/s and a chopper frequency of 130 Hz. If we assume that the output of the DMA has 100 particles/cm3, then each second 100*1.5 =150 particles are entering the instrument. The chopper removes 98% of those, so each second only 150 * 2% = 3 part/sec are reaching the AMS vaporizer. Given the chopper frequency of 130 Hz, that means that 3/130 = 2.3% of the chopper cycles will have a particle, and thus the calibration data is good with respect to this criterion. In fact we could work with 200 part/cm3 and still have less than 5% coincidence errors. Note that the probability of having two particles, when at least 1 particle is present, is the same probability as having one particle, as this is a Poisson process with uncorrelated events, i.e. one particle doesn’t know what the other particles are doing. E.g. in our example the probability of having one particle in a chopper cycle is 2.3%, and the probability of having two particles in any chopper cycle is 2.3%*2.3%. But the probability of having two particles when at least one is present is 2.3%. So in summary, the particle number should be kept around 200 p/cm3. In the other direction, you can work with much lower particle concentrations without having coincidence errors, but then you will detect very few particles per unit time, and the calibration will take a long time - or be noisy is not too few particles are collected.
*For the BFSP calibration, you want to detect at least 300 individual particles (no matter whether it takes a short or long time). This is because from experience, once this number is reached the result of the IE calibration changes little, while it can be variable (noisy) for much smaller numbers of individual particles.
+
*For the BFSP calibration, you want to detect at least 300 individual particles (no matter whether it takes a short or long time). This is because, from experience, once this number is reached the result of the IE calibration changes little, while it can be variable (noisy) for much smaller numbers of individual particles.
*For comparison with the CPC, it is important that the particles are well mixed across the tubing, and that losses between the point in which the CPC and AMS flows are split and the instruments themselves are very small. For this reason a mixing volume is needed between the output of the DMA and the CPC+AMS, and short sampling lines avoiding sharp turns are needed for this calibration. Also a bypass line as close to the AMS as possible is useful to reduce residence time (and thus losses) on the AMS line.
+
*For comparison with the CPC, it is important that the particles are well mixed across the tubing, and that losses between the point in which the CPC and AMS flows are split and the instruments themselves are very small. For this reason, a mixing volume is needed between the any points aerosol dilution and the CPC+AMS split, and short sampling lines avoiding sharp turns are needed after this split. Also a bypass line as close to the AMS as possible is useful to reduce residence time (and thus losses) on the AMS line.
*Properly drying particles before the DMA is very important. Otherwise the particles may contain water, and when they are selected by the DMA they will contain less NH4NO3 than dry particles of the same mobility diameters. This would cause a low bias in the determined IE. One can look for the particle-phase water signal with the AMS, although the detection limit is typically high due to the high background H2O+ in the AMS vacuum chamber. This needs to be done with the PToF mode, as the BFSP mode is too noisy for H2O+, and the MS mode also responds to water vapor which is difficult to separate from particle-phase water.
+
*Properly drying particles before the DMA is very important. Otherwise the particles may contain water, and when they are selected by the DMA they will contain less NH4NO3 than dry particles of the same mobility diameters. This will cause a low bias in the determined IE. One can look for the particle-phase water signal with the AMS, although the detection limit is typically high due to the high background H2O+ in the AMS vacuum chamber. This needs to be done with the PToF mode, as the BFSP mode is too noisy for H2O+, and the MS mode also responds to water vapor which is difficult to separate from particle-phase water.
*Evaporation of NH4NO3 on the lines is possible, and has been reported by some investigators, especially for long lines or lines exposed to hot components or air. Most of the time however evaporation is not observed. For this reason it is also recommended to keep lines as short as possible, and to avoid exposing the lines to any hot elements, or hot air arising from fans etc. Also for this reason the AMS size measurement should be used to determine the particle size. If the size does not agree with the DMA-selected size, and the AMS has been calibrated with PSLs and is being operated at the same lens pressure as during the PSL calibration, it is possible that this is due to NH4NO3 evaporation on the lines (or wet particles).
+
*Evaporation of NH4NO3 in the lines is possible and has been reported by some investigators, especially for long lines or lines exposed to hot components or air. Most of the time however, evaporation is not observed. For this reason it is also recommended to keep lines as short as possible, and to avoid exposing the lines to any hot elements or hot air arising from fans, etc. Also for this reason the AMS size measurement should be used to check the particle size. If the size does not agree with the DMA-selected size, and the AMS has been calibrated with PSLs and is being operated at the same lens pressure as during the PSL calibration, it is possible that this is due to NH4NO3 evaporation on the lines (or wet particles).
 +
 
 
===2  General Set-up===
 
===2  General Set-up===
 
[[file:EI calibration-figure1.png|700px]]
 
[[file:EI calibration-figure1.png|700px]]
<blockquote>''Figure 1 the diagram for AMS and other instrument setup for IE calibrations (drier can be Nafion or Silica Gel dryer)''</blockquote>
+
<blockquote>''Figure 1. Diagram of AMS and other instrument setup for IE calibrations (drier can be Nafion or silica gel dryer)''</blockquote>
*Currently there are two common methods being used, 1, DMA/CPC mass based method; 2, Single particle based method, Brute Force Single Particle (BFSP). Both methods should be used at all times. The DMA/CPC method is very risky as one depends on the CPC counting efficiency and plumbing, and it is easy to have large errors in the IE for this reason. CPCs are notorious for having problems that reduce (or sometimes enhance) the particle counting efficiency. Your CPC should always be checked before calibration by comparing it to at least one other CPC. The CPC is also used in the BFSP method, to provide a comparison to the particle concentration determined with the AMS. This can be critical to uncover problems with the calibration setup.
+
*Currently there are two common methods in use: 1) DMA/CPC mass based method; 2) Single particle based method, Brute Force Single Particle (BFSP). Both methods should be used at all times. The DMA/CPC method is very risky as one depends on the CPC counting efficiency and plumbing, which can easily introduce large errors in the IE. CPCs are notorious for having problems that reduce (or sometimes enhance) the particle counting efficiency. Your CPC should always be checked before by comparing it to at least one other CPC. A CPC is also used in the BFSP method, to provide a comparison to the particle concentration determined with the AMS. This can be critical to uncover problems with the calibration setup.
 
**The BFSP calibration is only possible with the C-ToF or the V-ToF modes. The number of ions detected in W-mode is way too small for the BFSP calibration. The DMA/CPC mass-based mode can be applied to all ToF-AMS versions.
 
**The BFSP calibration is only possible with the C-ToF or the V-ToF modes. The number of ions detected in W-mode is way too small for the BFSP calibration. The DMA/CPC mass-based mode can be applied to all ToF-AMS versions.
  
 
===3 Setting up the AMS DAQ Software for IE calibration===
 
===3 Setting up the AMS DAQ Software for IE calibration===
*It is useful to use more than one menu during IE calibration. The menu used for acquisition should generally be used. In addition, it is useful to have another specific calibration menu (a menu similar to the acquisition menu that will be used in the lab experiments or field sampling, but modified as described below) (see Figure 2).
+
*It is useful to use more than one menu during IE calibration. The menu used for standard acquisition should generally be used. In addition, it is useful to have another specific calibration menu (a menu similar to the acquisition menu that will be used in the lab experiments or field sampling, but modified as described below) (see Figure 2).
 
[[file:EI calibration-figure2.png|700px]]
 
[[file:EI calibration-figure2.png|700px]]
  
Line 275: Line 287:
 
[[file:EI calibration-figure3.png|700px]]
 
[[file:EI calibration-figure3.png|700px]]
 
<blockquote>
 
<blockquote>
''Figure 3 Timing example for IE cal V Menu''</blockquote>
+
''Figure 3. Timing example for IE cal V Menu''</blockquote>
 
<blockquote>
 
<blockquote>
'''Timing tab'''</blockquote>
+
'''Timing tab'''</blockquote>
 
<blockquote>
 
<blockquote>
 
* No Co-Adds - This gives better size resolution.</blockquote>
 
* No Co-Adds - This gives better size resolution.</blockquote>
 
<blockquote>
 
<blockquote>
* Faster Pulsing - This increases the actual number of ions measured and improves the probability of detecting a particle, as well as the detected ions per particle (IPP). Pete DeCarlo recommends using the pulsing period of 25 s for V-mode, And the Maximum of m/z AMS can detect will limited within 200. (18,100 samples). Jose thinks that that an even smaller m/z range with a faster pulsing period (e.g. going to m/z 60) is even better. Note that a pulsing period shorter than about 12 us is not allowed by the software, as otherwise you could destroy the pulsers by overheating (this has been “achieved” in the past).</blockquote>
+
* Faster Pulsing - This increases the actual number of ions measured and improves the probability of detecting a particle, as well as the detected ions per particle (IPP). Pete DeCarlo recommends using the pulsing period of 25 us for V-mode, which will limit the maximum m/z range to 200 (~19,000 samples). Jose thinks that that an even smaller m/z range with a faster pulsing period (e.g. going to m/z 60) is even better. Note that a pulsing period shorter than about 12 us is not allowed by the software, as otherwise you could destroy the pulsers by overheating (this has been “achieved” in the past).</blockquote>
 
<blockquote>   
 
<blockquote>   
 
*<span style="color:Red;">IMPORTANT:</span>The measured IE value with a menu with faster pulsing will need to be scaled by the ratio of the pulsing period during calibration to the pulsing period during measurement. E.g. if you determine IE = 1e-7 with pulsing of 25 us, and your regular acquisition menu uses 50 us, the IE that applies to your regular acquisition menu is 1e-7*25/50 = 5e-8. (Due to possible confusion arising from this and other similar effects, it is useful to actually use both menus in your IE cal. Then the faster pulsing menu provides better quantification, while your regular acquisition menu provides a check on that quantification).</blockquote>
 
*<span style="color:Red;">IMPORTANT:</span>The measured IE value with a menu with faster pulsing will need to be scaled by the ratio of the pulsing period during calibration to the pulsing period during measurement. E.g. if you determine IE = 1e-7 with pulsing of 25 us, and your regular acquisition menu uses 50 us, the IE that applies to your regular acquisition menu is 1e-7*25/50 = 5e-8. (Due to possible confusion arising from this and other similar effects, it is useful to actually use both menus in your IE cal. Then the faster pulsing menu provides better quantification, while your regular acquisition menu provides a check on that quantification).</blockquote>
 
[[file:EI calibration-figure4.png|700px]]
 
[[file:EI calibration-figure4.png|700px]]
 
<blockquote>
 
<blockquote>
''Figure 4 Averaging and Saving example for IE calibration V menu''
+
''Figure 4. Averaging and Saving example for IE calibration V menu''
 
</blockquote>
 
</blockquote>
 
<blockquote>
 
<blockquote>
'''Averaging and Saving tab'''</blockquote><blockquote>
+
'''Averaging and Saving tab'''</blockquote><blockquote>
1) IMPORTANT: operate the instrument and save data from all GENALT modes: BFSP, MS, PTOF. Generally we give a larger fraction of the time to BFSP as it takes longer to accumulate the data needed for calibration. For example in Figure 4 we have 5s for MS, 5s for PToF, and 15s for BFSP (60% of acquisition time). The other modes are important for:</blockquote>
+
1) IMPORTANT: operate the instrument and save data from all GENALT modes: BFSP, MS, PToF. Generally we give a larger fraction of the time to BFSP as it takes longer to accumulate the data needed for calibration. For example, in Figure 4 we have 5s for MS, 5s for PToF, and 15s for BFSP (60% of acquisition time). The other modes are important for:</blockquote>
 
<blockquote>
 
<blockquote>
 
*PToF mode: determining the doubly charged particle correction and to detect the possible presence of particle-water.</blockquote>
 
*PToF mode: determining the doubly charged particle correction and to detect the possible presence of particle-water.</blockquote>
 
<blockquote>
 
<blockquote>
 
*MS mode: to apply the DMA/CPC method and to determine RIENH4 since signal-to-noise is highest in MS mode.</blockquote><blockquote>
 
*MS mode: to apply the DMA/CPC method and to determine RIENH4 since signal-to-noise is highest in MS mode.</blockquote><blockquote>
2) Save both itx and HDF files; itx files are needed for the IE calibration software, and HDF files are needed for use in Squirrel. (Note from Jose in Aug-2010: I am not sure that saving ITX is still needed. Squirrel only uses HDF files for PToF and MS data).</blockquote><blockquote>
+
2) You need to only select to save HDF files; itx files are needed for the BFSP IE calibration software but by default are always saved during BFSP mode; HDF files are needed for use in Squirrel for processing the MS and PToF data.</blockquote><blockquote>
3) Filter BFSP data for ammonium nitrate particles; so that an excessive amount of data is not saved. This tells the DAQ software to only save BFSP data if an ammonium nitrate particle is detected.  The Signal Threshold for the BSFP always is set to 10 bits. (This assumes typical settings for the Acquiris AP240 board in terms of gain (voltage range) and threshold and bandwidth. If the number of particles counted with the AMS vs CPC is not consistent, one could experiment with this threshold. Using a filter as the inlet, you can lower or increase the threshold to a point for which no false particles are counted, but not much above that).</blockquote><blockquote>
+
3) Filter BFSP data for ammonium nitrate particles; so that an excessive amount of data is not saved. This tells the DAQ software to only save BFSP data if an ammonium nitrate particle is detected.  The Signal Threshold for the BSFP always is set to 10 bits. (This assumes typical settings for the Acquiris AP240 board in terms of gain (voltage range), threshold, and bandwidth. If the number of particles counted with the AMS vs. CPC is not consistent, one could experiment with this threshold. Using a filter as the inlet, you can lower or increase the threshold to a point for which no false particles are counted, but not much above that).</blockquote><blockquote>
'''For the Bitwise tab (baseline and SI threshold)'''</blockquote>
+
'''For the Bitwise tab (baseline and SI threshold)'''</blockquote>
 
<blockquote>
 
<blockquote>
*Check the baseline and threshold. See if it is the same with the one we used in the normal sampling. If not, change the bitwise to match the ambient sampling ones. Prior to an IE cal you need to do a baseline and SI calibration. IMPORTANT: if the baseline, threshold, or SI change significantly and you have data acquired with the old settings (that you care about), you need to do the IE calibration with both the OLD settings and the NEW settings, in order to be able to quantify data acquired both ways.</blockquote>
+
*Check the baseline and threshold. See if it is the same as the one you used in the normal sampling. If not, change the bitwise to match the ambient sampling ones. Prior to an IE cal you need to do a baseline and SI calibration. IMPORTANT: if the baseline, threshold, or SI change significantly and you have data acquired with the old settings (that you care about), you need to do the IE calibration with both the OLD settings and the NEW settings, in order to be able to quantify data acquired both ways.</blockquote>
 
[[file:EI calibration-figure5.png|700px]]<blockquote>
 
[[file:EI calibration-figure5.png|700px]]<blockquote>
''Figure 5 TPS menu tab''
+
''Figure 5. TPS menu tab''
 
</blockquote>
 
</blockquote>
 
<blockquote>
 
<blockquote>
'''For the TPS menu tab'''</blockquote><blockquote>
+
''' For the TPS menu tab'''</blockquote><blockquote>
 
*You need to make sure that all the TPS (TOF power supply) settings in the IE cal menu are the same as for the menu used during normal sampling. If the values are not the same, they cannot be changed in this tab if “TPS remote control” is enabled. In that case you can change them in the tuning tab of the “m/z calibration” window. Consistency with the standard operating menus is most easily achieved by cloning the standard menus and then making the modifications described here.</blockquote>
 
*You need to make sure that all the TPS (TOF power supply) settings in the IE cal menu are the same as for the menu used during normal sampling. If the values are not the same, they cannot be changed in this tab if “TPS remote control” is enabled. In that case you can change them in the tuning tab of the “m/z calibration” window. Consistency with the standard operating menus is most easily achieved by cloning the standard menus and then making the modifications described here.</blockquote>
  
 
[[file:EI calibration-figure6.png|700px]]
 
[[file:EI calibration-figure6.png|700px]]
 
<blockquote>
 
<blockquote>
''Figure 6 Screenshot during acquisition of IE calibration data with pure NH4NO3 particles''
+
''Figure 6. Screenshot during acquisition of IE calibration data with pure NH4NO3 particles''
 
</blockquote>
 
</blockquote>
  
Line 315: Line 327:
 
1) Make sure that the experimental setup for the IE calibration is set up properly as shown in Figure 1, and that size-selected  ammonium nitrate is being sampled by the AMS.</blockquote><blockquote>
 
1) Make sure that the experimental setup for the IE calibration is set up properly as shown in Figure 1, and that size-selected  ammonium nitrate is being sampled by the AMS.</blockquote><blockquote>
 
2) Make sure the SP Choppers / Files is < 5% (depending on the error that you want to tolerate, others would say 10%). This reduces the probability of 2 particles entering the PToF region during the same chopper cycle. For example in the figure above SP_Choppers = 552, meaning that data for 552 chopper periods have been downloaded to RAM memory and the software has determined that only 40 of those (~7%) actually contain signal for an NH4NO3 particle.</blockquote><blockquote>
 
2) Make sure the SP Choppers / Files is < 5% (depending on the error that you want to tolerate, others would say 10%). This reduces the probability of 2 particles entering the PToF region during the same chopper cycle. For example in the figure above SP_Choppers = 552, meaning that data for 552 chopper periods have been downloaded to RAM memory and the software has determined that only 40 of those (~7%) actually contain signal for an NH4NO3 particle.</blockquote><blockquote>
3) Take a screenshot or two and paste them into powerpoint, so that you have an easy-to-read (and share with remote collaborators) record of the calibration (Air beam, flow, graphs etc.). Also record all relevant parameters (electronically or in a paper notebook), such as DMA sheath flow, DMA aerosol flow, AMS bypass flow, AMS flow, CPC flow, vaporizer temperature, chopper frequency, CPC screen number, Number co-adds, pulser period, BFSP threshold, MS-AB, SI, Runs, BW (the file name for saving the Bitwise calibration data), MCP value, the AN particle Size for calibration, etc. </blockquote><blockquote>
+
3) Take a screenshot or two and paste them into powerpoint, so that you have an easy-to-read (and share with remote collaborators) record of the calibration (Air beam, flow, graphs, etc.). Also record all relevant parameters (electronically or in a paper notebook), such as DMA sheath flow, DMA aerosol flow, AMS bypass flow, AMS flow, CPC flow, vaporizer temperature, chopper frequency, CPC screen number, Number co-adds, pulser period, BFSP threshold, MS-AB, SI, Runs, BW (the file name for saving the Bitwise calibration data), MCP value, the AN particle Size for calibration, etc. </blockquote><blockquote>
4) Wait until particle number acquired in the BFSP mode is above 300 (see the discussion above for the experience behind this number). To check the number of the particles saved look at the particle number which is the last number before “_BFSP” in the file name. Otherwise count all the files which have been recorded in the recent BFSP operation. Another way is to keep an eye on the number of particles detected in the display, but this number gets reset every time data are saved by the software (so you need to sum separately in that case).</blockquote><blockquote>
+
4) Wait until particle number acquired in the BFSP mode is above 300 (see the discussion above for the experience behind this number). To check the number of the particles saved look at the particle number which is the last number before “_BFSP” in the file name (in BFSP data folder). Otherwise count all the files which have been recorded in the recent BFSP operation. Another way is to keep an eye on the number of particles detected in the display, but this number gets reset every time the GENALT menu cycles (so you need to sum separately in that case).</blockquote><blockquote>
 
5) After 300 files, 300 particles have been saved in BFSP mode, and you can press stop.
 
5) After 300 files, 300 particles have been saved in BFSP mode, and you can press stop.
It is better to record data with more than one particle size, and also to make sure that there is no threshold bias. Afterwards one needs to compare BFSP IE with mass-based IE with different size calibration particles. Details can be seen in Edward Dunleas presentation from AMS User’s Meeting:
+
It is better to record data with more than one particle size, and also to make sure that there is no threshold bias. Afterward, one should compare BFSP IE with mass-based IE, and for different size calibration particles if time allows. Details can be seen in Edward Dunlea's presentation from the AMS User’s Meeting:
 
http://cires.colorado.edu/jimenez-group/UsrMtgs/UsersMtg7/ie_cal_tutorial.pdf </blockquote><blockquote>
 
http://cires.colorado.edu/jimenez-group/UsrMtgs/UsersMtg7/ie_cal_tutorial.pdf </blockquote><blockquote>
6) It can be useful to also sample air through a HEPA filter during BFSP calibration to make sure that no “false particles” are being counted..</blockquote>
+
6) It can be useful to also sample air through a HEPA filter during BFSP calibration to make sure that no “false particles” are being counted.</blockquote>
  
 
'''DMA/CPC-based IE calibration (sometimes known as “mass-based” method)'''<blockquote>
 
'''DMA/CPC-based IE calibration (sometimes known as “mass-based” method)'''<blockquote>
1)  Before sampling ammonium nitrate particles for the DMA/CPC IE calibration, a blank filter sampling should be done first (put the HEPA filter on the inlet to filter particles from room air.). Press “Acquire” and sample the filtered air from the room for 10~20 minutes.</blockquote><blockquote>
+
1)  Before sampling ammonium nitrate particles for the DMA/CPC IE calibration, a blank filter sampling should be done first (put the HEPA filter on the inlet to filter particles from room air). Press “Acquire” and sample the filtered room air from for 10~20 minutes.</blockquote><blockquote>
 
2) Set up the calibration system as shown in Figure 1. Record the CPC into the DAQ software, or otherwise record it manually at regular intervals (it is best if the count rate of the CPC is stable throughout the calibration period).</blockquote><blockquote>
 
2) Set up the calibration system as shown in Figure 1. Record the CPC into the DAQ software, or otherwise record it manually at regular intervals (it is best if the count rate of the CPC is stable throughout the calibration period).</blockquote><blockquote>
3) Produce a monodisperse aerosol flow by selecting one particle mobile diameter with the DMA. 400 nm is recommended for V-mode, see discussion above, although the particle size restrictions discussed above do not apply here. However it is important to keep the mass fraction of multiply-charged particles to a minimum. Then continuously acquire ammonium nitrate particle data in MS and PToF modes. Do print screen and record the parameters as described in procedure 3) in the BFSP IE cal.</blockquote><blockquote>
+
3) Produce a monodisperse aerosol flow by selecting one particle mobile diameter with the DMA. 400 nm is recommended for V-mode (see discussion above) although the particle size restrictions discussed above do not apply here. However, it is important to keep the mass fraction of multiply-charged particles to a minimum. Then continuously acquire ammonium nitrate particle data in MS and PToF modes. Do print screen and record the parameters as described in procedure 3) in the BFSP IE cal above.</blockquote><blockquote>
 
4) Every 1-2 menu cycles, adjust the needle valve of the aerosol diluter to get different particle number concentrations which can be read from CPC. Note that in this method the number of particles/cm3 can be much larger than 200, since we do not rely on detecting individual particles but rather the total averaged signal from many particles.</blockquote><blockquote>
 
4) Every 1-2 menu cycles, adjust the needle valve of the aerosol diluter to get different particle number concentrations which can be read from CPC. Note that in this method the number of particles/cm3 can be much larger than 200, since we do not rely on detecting individual particles but rather the total averaged signal from many particles.</blockquote><blockquote>
 
5) If it is possible, one can repeat the DMA/CPC IE cal for multiple particle sizes to test if the particle size has an influence on the IE cal results.</blockquote>
 
5) If it is possible, one can repeat the DMA/CPC IE cal for multiple particle sizes to test if the particle size has an influence on the IE cal results.</blockquote>
  
===6.1 Data processing of IE calibration (for BFSP data analysis)===
+
===5.1 Data processing of IE calibration (for BFSP data analysis)===
 
[[file:EI calibration-figure7.png|700px]]
 
[[file:EI calibration-figure7.png|700px]]
 
<blockquote>
 
<blockquote>
''Figure 7 Loading the BFSP Data with IE calibration software''</blockquote>
+
''Figure 7. Loading the BFSP Data with IE calibration software''</blockquote>
 
*To process the BFSP IE calibration data, use the Igor template which can downloaded from the web at the following link, http://cires.colorado.edu/jimenez-group/ToFAMSResources/ToFSoftware/index.html.
 
*To process the BFSP IE calibration data, use the Igor template which can downloaded from the web at the following link, http://cires.colorado.edu/jimenez-group/ToFAMSResources/ToFSoftware/index.html.
 
*After opening the software:
 
*After opening the software:
Line 343: Line 355:
  
 
[[file:EI calibration-figure8.png|700px]]
 
[[file:EI calibration-figure8.png|700px]]
<blockquote>''Figure 8 Processing IE BFSP data-Select the different regions1''</blockquote>
+
<blockquote>''Figure 8 Processing IE BFSP data-Select the different PToF regions (Step 1)''</blockquote>
 
[[file:EI calibration-figure9.png|700px]]
 
[[file:EI calibration-figure9.png|700px]]
<blockquote>''Figure 9 Processing IE BFSP data-Select the different regions2''</blockquote>
+
<blockquote>''Figure 9. Processing IE BFSP data-Select the different PToF regions (Step 2)''</blockquote>
 
<blockquote>
 
<blockquote>
 
4) Press “Graph in New Window” and a new copy Graph named “particle Time of Flight” will show, like the one on the left in Figure 8.</blockquote><blockquote>
 
4) Press “Graph in New Window” and a new copy Graph named “particle Time of Flight” will show, like the one on the left in Figure 8.</blockquote><blockquote>
5) Use the Marquee function and right click to select the areas for the IE calibration. There are three regions that need to be defined. One is the “Particle Arrival Region”, the other two are “Baseline Region #1” and “Baseline Region #2”. To mark the “Particle Arrival region” for example, one can use the Igor Marquee to select this region in the green box (Figure 8) and right click to select “Tof IE Calibration-Set Dva Range” .And then there will be dialog box to ask you to define the name of this region (red box Figure 9.</blockquote><blockquote>  
+
5) Use the Marquee function and right click to select the areas for the IE calibration. There are three regions that need to be defined. One is the “Particle Arrival Region”, the other two are “Baseline Region #1” and “Baseline Region #2”. To mark the “Particle Arrival region” for example, one can use the Igor Marquee to select this region in the green box (Figure 8) and right click to select “Tof IE Calibration-Set Dva Range”. There will appear dialog box to ask you to define the name of this region (red box Figure 9).</blockquote><blockquote>  
''The baseline region is the background region, so the signal in this region should be small and stable (before and after the expected particles arrival signals). It is common to see doubly charged particles in the IE calibration (Black box in the Figure 8). When one selects “Particle Arrival Region”, the doubly charged particles should NOT be included, just select the singly charged particle arrival region as shown in the green box selection in Figure 8.'' </blockquote>
+
''The baseline region is the background region, so the signal in this region should be small and stable (before and after the expected particles arrival signals). It is common to see doubly charged particles in the IE calibration (black box in the Figure 8). When one selects “Particle Arrival Region”, the doubly charged particles should NOT be included, just select the singly charged particle arrival region as shown in the green box selection in Figure 8.'' </blockquote>
  
 
[[file:EI calibration-figure10.png|700px]]
 
[[file:EI calibration-figure10.png|700px]]
<blockquote>''Figure 10 Processing IE BFSP data -fill in necessary information for IE calculation''</blockquote>
+
<blockquote>''Figure 10. Processing IE BFSP data -fill in necessary information for IE calculation''</blockquote>
 
<blockquote>
 
<blockquote>
6) Check the SI value, enter the mobility diameter used in the IE calibration (calculated from the AMS size measurement, if the DMA and AMS do not agree, see above).
+
6) Check the SI value, enter the mobility diameter used in the IE calibration (compare to that calculated from the AMS size measurement, if the DMA and AMS do not agree, see above).
 
  </blockquote><blockquote>
 
  </blockquote><blockquote>
7) Go through several dozen particles individually using the “particle #” scroll. Setting the min IPP to e.g. 2 is fine to start. Redo the calibration with different values of the minimum IPP and see if the results change. If min_IPP is too low, then some individual particle events will look like noise. If that’s the case, either filter those out manually (“Add to Blacklist” button), or increase the value of min_IPP (check that when you do this, you are not removing some real particles as well). Avoid setting too high of a min IPP as you may miss some real particles.</blockquote><blockquote>
+
7) Go through several dozen particles individually using the “particle #” scroll. Setting the min IPP to e.g. 2 is fine to start. Redo the calibration with different values of the minimum IPP and see if the results change. If the min IPP is too low, then some individual particle events will look like noise. If that’s the case, either filter those out manually (“Add to Blacklist” button), or increase the value of the min IPP (check that when you do this, you are not removing some real particles as well). Avoid setting too high of a min IPP as you may miss some real particles.</blockquote><blockquote>
 
8) Click “Do It!”</blockquote>
 
8) Click “Do It!”</blockquote>
  
 
[[file:EI calibration-figure11.png|700px]]
 
[[file:EI calibration-figure11.png|700px]]
<blockquote>''Figure 11 Processing IE BFSP data- IE calibration output.''</blockquote>
+
<blockquote>''Figure 11. Processing IE BFSP data- IE calibration output.''</blockquote>
 
<blockquote>
 
<blockquote>
 
9) The results from the calculations are the IE for ammonium nitrate, RIE (of ammonium; but you should use the one determined with MS mode), Ions-per-particle, IE/AB, Flow rate and Pulser Period. The IE/AB is the number that should be used for input into the DAQ and Squirrel.</blockquote><blockquote>
 
9) The results from the calculations are the IE for ammonium nitrate, RIE (of ammonium; but you should use the one determined with MS mode), Ions-per-particle, IE/AB, Flow rate and Pulser Period. The IE/AB is the number that should be used for input into the DAQ and Squirrel.</blockquote><blockquote>
  Why should we input IE/AB number?
+
  Why should we input the IE/AB value?
   If your pulser period is different for your Calibration menu,  
+
   If your pulser period is different for your calibration menu,  
 
   then the IE you input will be different than the IE you measured,  
 
   then the IE you input will be different than the IE you measured,  
 
   but your IE/AB will be the same!
 
   but your IE/AB will be the same!
Line 370: Line 382:
 
   Or alternatively:
 
   Or alternatively:
 
       '''IE<sub>DAQ</sub>= IE/AB<sub>Meas</sub> * AB<sub>Acq</sub>'''
 
       '''IE<sub>DAQ</sub>= IE/AB<sub>Meas</sub> * AB<sub>Acq</sub>'''
   Where IE<sub>DAQ</sub> is the value to input into the Menu in the DAQ software; ABmeas is the air  
+
   Where IE<sub>DAQ</sub> is the value to input into the Menu in the DAQ software; AB<sub>meas</sub> is the air  
 
   beam measured in the IE cal. AB<sub>Acq</sub> is the air beam measured in the normal ambient  
 
   beam measured in the IE cal. AB<sub>Acq</sub> is the air beam measured in the normal ambient  
 
   sampling.  
 
   sampling.  
Line 383: Line 395:
 
</blockquote>
 
</blockquote>
  
===6.2 Data processing of IE calibration (for DMA/CPC data analysis)===
+
===5.2 Data processing of IE calibration (for DMA/CPC data analysis)===
 
<blockquote>
 
<blockquote>
 
1) Use Squirrel to calculate mass loadings with an assumed IE.</blockquote><blockquote>
 
1) Use Squirrel to calculate mass loadings with an assumed IE.</blockquote><blockquote>
Line 390: Line 402:
 
[[file:EI calibration-figure13.png|500px|center]]
 
[[file:EI calibration-figure13.png|500px|center]]
 
<blockquote>
 
<blockquote>
3) Make a scatter plot for the different NO3 mass concentrations calculated from the DMA/CPC vs AMS NO3 accordingly, as shown in Figure 12. Do the linear curve fitting to get slope and intercept. </blockquote>
+
3) Make a scatter plot for the different NO3 mass concentrations calculated from the DMA/CPC vs AMS NO3 accordingly, as shown in Figure 12. Do a linear curve fit to determine a slope and intercept. </blockquote>
 
[[file:EI calibration-figure12.png|700px]]
 
[[file:EI calibration-figure12.png|700px]]
<blockquote>''Figure 12 Scatter plot of NO3 mass from CPC vs NO3 mass from AMS''</blockquote>
+
<blockquote>''Figure 12. Scatter plot of NO3 mass from CPC vs NO3 mass from AMS''</blockquote>
 
<blockquote>
 
<blockquote>
4) The mass based new IE and RIE can be obtained from the equation following, Pulser period calibration is added also.
+
4) The CPC/AMS-based new IE and RIE can be obtained from the equation following (be sure to account for pulser period, if applicable).
 
</blockquote>  
 
</blockquote>  
 
[[file:EI calibration-figure14.png|500px|center]]
 
[[file:EI calibration-figure14.png|500px|center]]
Line 401: Line 413:
  
  
*Theoretical explanation of Mass Quantification with AMS see section 5 of:
+
*Theoretical explanation of Mass Quantification with AMS see Section 5 of:
Jimenez et al. Ambient Sampling using the Aerodyne Aerosol Mass Spectrometer JGR, 2003(and also review paper of Canagaratna et al., Mass Spec Rev 2007).
+
Jimenez et al., Ambient Sampling using the Aerodyne Aerosol Mass Spectrometer. JGR, 2003(and also review paper of Canagaratna et al., Mass Spec Rev 2007).
 +
*Particle Mass Calculator for ToF Calibration using Mass-based method:
 +
http://cires.colorado.edu/jimenez-group/AerosolMassCalc.xls
 
*See Edward Dunlea’s presentation from AMS User’s Meeting:
 
*See Edward Dunlea’s presentation from AMS User’s Meeting:
 
http://cires.colorado.edu/jimenez-group/UsrMtgs/UsersMtg7/ie_cal_tutorial.pdf
 
http://cires.colorado.edu/jimenez-group/UsrMtgs/UsersMtg7/ie_cal_tutorial.pdf
*ipf for BFSP IE processing:
+
*IGOR .ipf for BFSP IE processing:
 
http://cires.colorado.edu/jimenez-group/ToFAMSResources/ToFSoftware/index.html#ToF_IE_Cal
 
http://cires.colorado.edu/jimenez-group/ToFAMSResources/ToFSoftware/index.html#ToF_IE_Cal
  
 
== Particle Size Calibration ==
 
== Particle Size Calibration ==
  
<i>(from Peter DeCarlo's powerpoint)</i> Weiwei will add text here soon.
+
<i>(from Peter DeCarlo's powerpoint, adapted by Weiwei Hu, revised by Doug Day and Jose-Luis Jimenez)</i>
 
===Principle of Particle Size Calibration===
 
===Principle of Particle Size Calibration===
 
*The AMS reports a vacuum aerodynamic particle size (DeCarlo et al., AS&T 2004) based on a particle velocity measurement. The start of the timing for particle flight begins with the opening of the chopper, and ends with the detection of ions. The Particle Time-of-Flight (PToF) timescale is milliseconds, while the ion time-of-flight is microseconds, which is why we can use the ion detection as our “time end”.
 
*The AMS reports a vacuum aerodynamic particle size (DeCarlo et al., AS&T 2004) based on a particle velocity measurement. The start of the timing for particle flight begins with the opening of the chopper, and ends with the detection of ions. The Particle Time-of-Flight (PToF) timescale is milliseconds, while the ion time-of-flight is microseconds, which is why we can use the ion detection as our “time end”.
*The relationship between particle aerodynamic diameter and particle velocity can be described by an empirical sizing equation. One can use calibration aerosol of known diameter and density, typically calibrated polystyrene latex spheres (PSLs)or SMPS size-selected NH4NO3 particles to determine the empirical parameters in the velocity equation. For the Vel calibration using PSL is standard procedure, For the special purposes use of AMS data, such as a lab SOA experiment and new particle formation, it may better to also include NH4NO3 particles in the velocity calibration since a range of particles extending to smaller sizes may be desired. The velocity equation is (Jimenez et al., JGR 2003):  
+
*The relationship between particle aerodynamic diameter and particle velocity can be described by an empirical sizing equation. One can use calibration aerosol of known diameter and density, typically calibrated polystyrene latex spheres (PSLs) or SMPS size-selected NH4NO3 particles to determine the empirical parameters in the velocity equation. For the Vel calibration, using PSL is standard procedure; for special applications of the AMS, such as a lab SOA experiment and new particle formation, it may be better to also include NH4NO3 particles in the velocity calibration since a range of particles extending to smaller sizes may be desired. The velocity equation is (Allan et al., JGR 2003):  
 
  
 
  
        Velocity=(Flight length/Flight Time) = (V<sub>gaslens</sub> + [V<sub>gasexit</sub> – V<sub>gaslens</sub>]) / [1 + (Daero/D*) b]  (1)
+
  <z/12>Velocity=(Flight length/Flight Time) = V<sub>gaslens</sub> + [V<sub>gasexit</sub> – V<sub>gaslens</sub>] / [1 + (D<sub>aero</sub>/D*) b]  (1)
          V<sub>gaslens</sub> = velocity of gas in the lens (m/s)
+
        V<sub>gaslens</sub> = velocity of gas in the lens (m/s; ~15 m/s)
          V<sub>gasexit</sub> = velocity of gas at the lens exit (~15 m/s).
+
        V<sub>gasexit</sub> = velocity of gas at the lens exit (m/s).
          Daero = vacuum aerodynamic diameter of PSLs or NH4NO3(nm)
+
        D<sub>aero</sub> = vacuum aerodynamic diameter of PSLs or NH4NO3(nm)
            D* = empirical parameter known as scale diameter (~20 nm)
+
        D* = empirical parameter known as scale diameter (~5 nm)
          b = empirical parameter (typically ~0.5, unitless)
+
        b = empirical parameter (typically ~0.5, unitless)
 
           Flight Length = 0.295 m (short chamber)
 
           Flight Length = 0.295 m (short chamber)
           Flight Time = Flight time of PSLs or NH4NO3
+
           Flight Time = flight time of PSLs or NH4NO3 particles
  
''In practice the equation has 4 degrees of freedom, but all of our data with PSLs lie in a region which is a line in log space, and can be described with 2 parameters. Thus if one tries to do a fitting with all 4 equation parameters free, many solutions are possible. To remove these extra spurious degrees of freedom, we normally only fit D* and b, while Vgas¬_lens and Vgas_exit are assigned values ahead of time and held constant during the fit.''
+
''In practice the equation has 4 degrees of freedom, but all of our data with PSLs lie in a region which is a line in log space, and can be described with 2 parameters. Thus if one tries to do a fitting with all 4 equation parameters free, many solutions are possible. To remove these extra spurious degrees of freedom, we normally only fit D* and b, while V<sub>gaslens</sub> and V<sub>gasexit</sub> are assigned values and held constant during the fit.''
  
===Calibration setup for Particle size calibration===
+
===Calibration Setup for Particle Size Calibration===
 
<blockquote>
 
<blockquote>
'''A)Standard calibration for field purposes (“accumulation mode”)'''</blockquote>
+
'''A) Standard calibration for field purposes (“accumulation mode”)'''</blockquote>
 
<blockquote>
 
<blockquote>
1) Setup a particle generation system consisting of an atomizer and dryer flowing into the AMS inlet (flow should be vented the atmosphere through a HEPA filter to ensure that the AMS inlet is not pressurized)</blockquote>
+
1) Setup a particle generation system consisting of an atomizer and dryer flowing into the AMS inlet (flow should be vented to the atmosphere through a HEPA filter to ensure that the AMS inlet is not pressurized)</blockquote>
 
<blockquote>
 
<blockquote>
2) Use only PSLs: 100, 300, 500, 700, 900nm (below 100 nm they stick together and are very difficult to work with, above 900 nm the transmission into the AMS is low). Mixed solutions can be used such as 100, 500 and 900 nmand another with 300 and 700 nm. (Two or three PSL drops from original package PSL bottles are enough for an 100 ml atomizer bottle. Much more may need to be added for the larger sizes since the solutions have fewer particles). It is a good practice to sonicate the solutions for 5 min before use, ESPECIALLY if they are old. Solutions should be kept in the fridge (but not freezer) between uses, as otherwise bacteria may grow. </blockquote>
+
2) Use only PSLs: 100, 300, 500, 700, 900 nm (below 100 nm they stick together and are very difficult to work with, above 900 nm the transmission through the AMS inlet and lens is low). Mixed solutions can be used such as 100, 500 and 900 nm and another with 300 and 700 nm. Two or three PSL drops from an original packaged PSL bottles are enough for a 100 ml atomizer bottle. Much more may need to be added for the larger sizes since the solutions have fewer particles). It is a good practice to sonicate the solutions for 5 min before use, ESPECIALLY if they are old. Solutions should be kept in the fridge (but not freezer) between uses, as otherwise bacteria may grow. </blockquote>
 
[[File:Size calibration-figure1.png|700px]]
 
[[File:Size calibration-figure1.png|700px]]
 
<blockquote>
 
<blockquote>
''Figure 1: Add m/z 51 (maybe also 104, but slower evaporation)for PSLs, or m/z 46 for nitrate in the PTOF display list shown above''</blockquote>
+
''Figure 1. Add m/z 51 (maybe also 104, but has slower evaporation) for PSLs, or m/z 46 for nitrate in the PToF display list shown above''</blockquote>
 
<blockquote>
 
<blockquote>
3) For PSLs, set vaporizer to 800C (not too hot, don’t leave there too long, or you can destroy the vaporizer). The goal is to have rapid evaporation of the PSLs. Once this is achieved, there is no point in having the vaporizer hotter. Choose m/z 51 (potentially also m/z 104 or other PSL ions) in the PToF mode (Figure 1). For NH4NO3 set the vaporizer temperature to 600℃ (m/z 46 is selected).</blockquote>
+
3) For PSLs, set the vaporizer to 800C (not too hot, and don’t leave there too long or you can destroy the vaporizer). The goal is to have rapid evaporation of the PSLs. Once this is achieved, there is no point in having the vaporizer hotter. Choose m/z 51 (potentially also m/z 104 or other PSL ions) in the PToF mode (Figure 1). For NH4NO3 set the vaporizer temperature to 600℃ (m/z 46 is selected).</blockquote>
 
<blockquote>
 
<blockquote>
4) NH4NO3 (Selected by a DMA) can also be used for calibration. In this case IT IS CRITICAL to first calibrate the DMA with PSLs, as DMAs can be easily be off by several percent (often 10 or 20%) in diameter, and the cube of that error in volume/mass. For example a 5% error in diameter corresponds to a 16% error in mass. Use of ammonium nitrate allows for calibration using particle sizes smaller than 100 nm (more easily than trying to work with small PSLs, which is possible but more difficult), as well as calibration with particle sizes for which you don’t have PSLs. However the PSL diameter is known with much higher precision (resolution of ~100, i.e. uncertainty in size of ~1%), while the DMA selection has a resolution of ~10 (uncertainty of 10%). For the NH4NO3 calibration at low sizes (e.g 60nm), it is necessary to increase the atomizer-produced number concentration to produce a post size selection CPC concentration of as much as 1e4 cm-3, so that adequate mass concentration is detected in the AMS PToF mode.</blockquote>                                                                          <blockquote>                         
+
4) NH4NO3 (selected by a DMA) can also be used for calibration. In this case IT IS CRITICAL to first calibrate the DMA with PSLs, as DMAs can easily be off by several percent (often 10 or 20%) in diameter, and thus the cube of that error in volume and mass. For example a 5% error in diameter corresponds to a 16% error in mass. Use of ammonium nitrate allows for calibration using particle sizes smaller than 100 nm (more easily than trying to work with small PSLs, which is possible but more difficult), as well as calibration with particle sizes for which you don’t have PSLs. However, the PSL diameter is known with much higher precision (resolution of ~100, i.e. uncertainty in size of ~1%), while the DMA selection has a resolution of ~10 (uncertainty of 10%). For the NH4NO3 calibration at low sizes (e.g 60 nm), it is necessary to increase the atomizer-produced number concentration to produce a post size selection CPC concentration of as much as 1e4 cm-3, so that adequate mass concentration is detected in the AMS PToF mode.</blockquote>                                                                          <blockquote>                         
5)One can create a new menu for the particle size calibration (e.g. named “IE”)</blockquote>
+
5) One can create a new menu for the particle size calibration (e.g. named “IE”)</blockquote>
 
<blockquote>
 
<blockquote>
 
i. For the most accurate size calibration, the time resolution of the PToF data is key. If the regular menu (acquisition) has co-adds = 1, it can be used for size calibration</blockquote>
 
i. For the most accurate size calibration, the time resolution of the PToF data is key. If the regular menu (acquisition) has co-adds = 1, it can be used for size calibration</blockquote>
Line 446: Line 460:
 
ii. If the regular menu has co-adds > 1, then it preferable to conduct the size calibration with both the regular menu AND a menu with co-adds = 1 </blockquote>
 
ii. If the regular menu has co-adds > 1, then it preferable to conduct the size calibration with both the regular menu AND a menu with co-adds = 1 </blockquote>
 
<blockquote>
 
<blockquote>
iii.Using a menu with faster pulsing may be advantageous because you get more points in PToF space. Note that there can be small shifts in apparent size calibration when pulsing faster though, so it is best to acquire with both a regular pulsing menu and a fast pulsing menu. One can push V-mode to ~25 us pulser period with an m/z range up to ~200 (you can pulse it at 12 us and still get m/z 51).</blockquote>
+
iii. Using a menu with faster pulsing may be advantageous because you get more points in PToF space (and a high m/z range is not needed). Note that there can be small shifts in the apparent size calibration when pulsing faster though, so it is best to acquire with both a regular pulsing menu and a fast pulsing menu. One can push V-mode to ~25 us pulser period with an m/z range up to ~200 (you can pulse it at 12 us and still get m/z 51).</blockquote>
'''B) Acquire the particle size calibration data'''
+
'''B) Acquire the particle size calibration data'''</blockquote>
 +
</blockquote>
 
[[file:size calibration-figure2.png|700px]]
 
[[file:size calibration-figure2.png|700px]]
 
<blockquote>
 
<blockquote>
''Figure 2 PTOF acquire page layout ''
+
''Figure 2. PToF acquire page layout ''
 
</blockquote>
 
</blockquote>
 
<blockquote>
 
<blockquote>
1) Make sure that the AUTOSAVE is off (can also be done with autosave, some people prefer this, but operator must ensure that each file saved corresponds to just one particle size – or solution in case of using multiple PSLs at one time). Then the data will be saved manually by pressing the F3 key to save a file, and F5 to reinitialize. And also make sure the ITX and HDF file will both be saved (one can set this in the menu→saving and setting→data files).</blockquote>
+
1) Make sure that the AUTOSAVE is off (can also be done with autosave, some people prefer this, but operator must ensure that each file saved corresponds to just one particle size – or solution in case of using multiple PSLs at one time). Then the data will be saved manually by pressing the F3 key to save a file, and F5 to reinitialize. And also make sure the itx and HDF file will both be saved (one can set this in the menu→saving and setting→data files).</blockquote>
 
<blockquote>
 
<blockquote>
2) Check that the pressure in the lens when sampling calibration particles is the same as when doing ambient sampling. If it is not, the size calibration will change, this can be accounted for but it does take some work (see below). Click “PTOF” on the TOF-AMS DAQ Main Menu. Open the page layout as Figure 2 shows.</blockquote>
+
2) Check that the pressure in the lens when sampling calibration particles is the same as when doing ambient sampling. If it is not, the size calibration will change, this can be accounted for but it does take some work (see below). Click “PToF” on the TOF-AMS DAQ Main Menu. Open the page layout as Figure 2 shows.</blockquote>
 
<blockquote>
 
<blockquote>
3)Press “F5” in the keyboard or “Acquire” to acquire the calibration data.</blockquote>
+
3) Press “F5” on the keyboard or “Acquire” in the DAQ to acquire the calibration data.</blockquote>
 
<blockquote>  
 
<blockquote>  
4)Record the current Run number and the detailed information about the this time calibration samples, such as PSLs or NH4NO3, DMA diameter reading, the CPC screen number, Lens pressure (from electronics box and software). It is often useful to save some print screens into powerpoint for easy reference later.</blockquote>
+
4) Record the current Run number and the detailed information about the this time calibration samples, such as PSLs or NH4NO3, DMA diameter reading, the CPC screen number, Lens pressure (from electronics box and software). It is often useful to save some print screens into powerpoint for easy reference later.</blockquote>
 
<blockquote>
 
<blockquote>
5)Wait until a clear peak (PSL or nitrate m/z) is shown in the PToF screen and the position and height of peak is stable for a while (about 50s or 200 cycles – this will depend on your specific experimental setup, dilution of the PSL solution, etc.). If no clear peak appears for the PSLs, check that the vaporizer is glowing orange. If not, it may not be hot enough, due to vaporizer failure, or a problem with the vaporizer electronics. For nitrate the heater should NOT be glowing, just at regular 600C operating temperature (faint beginning of a glow). Otherwise, too low of particle concentration reaching the AMS is a likely cause of an absence of a PToF peak. </blockquote>
+
5) Wait until a clear peak (PSL or nitrate m/z) is shown in the PToF screen and the position and height of peak is stable for a while (about 50s or 200 cycles – this will depend on your specific experimental setup, dilution of the PSL solution, etc.). If no clear peak appears for the PSLs, check that the vaporizer is glowing orange. If not, it may not be hot enough, due to vaporizer failure, or a problem with the vaporizer electronics. For nitrate, the heater should NOT be glowing, just at regular 600C operating temperature (faint beginning of a glow). Otherwise, too low of particle concentration reaching the AMS is a likely cause of an absence of a PToF peak. </blockquote>
 
<blockquote>
 
<blockquote>
6)Press “F3” to save data. The data will be found in the
+
6) Press “F3” to save data. The data will be found in the
 
file: \\TofAMS\TofAMSData\NonAutoSaveData.</blockquote>
 
file: \\TofAMS\TofAMSData\NonAutoSaveData.</blockquote>
 
<blockquote>
 
<blockquote>
7)Repeat procedure 3 to 6 to acquire data for different size PSLs or NH4NO3 monodisperse particles.</blockquote>
+
7) Repeat procedure 3 to 6 to acquire data for different size PSLs or NH4NO3 monodisperse particles.</blockquote>
  
 
'''C) When do I need to redo the size calibration?'''
 
'''C) When do I need to redo the size calibration?'''
  
 
*The size calibration for a given instrument is ONLY a function of the flow rate (lens pressure). So generally once per campaign is sufficient (or once per critical orifice, if different orifices are used). Once at the start and once at the end of the campaign is good practice, particularly when the instrument is shipped.  
 
*The size calibration for a given instrument is ONLY a function of the flow rate (lens pressure). So generally once per campaign is sufficient (or once per critical orifice, if different orifices are used). Once at the start and once at the end of the campaign is good practice, particularly when the instrument is shipped.  
It is possible to correct mathematically for small deviations on the flowrate (see Bahreini et al. 2004 in JGR, which has the equations. The equations should be used to calculate the % perturbation on the size cal, and that correction applied to the main calibration).
+
It is possible to correct mathematically for small deviations on the flowrate (see Bahreini et al. 2004 in JGR, which has the equations; the equations should be used to calculate the % perturbation on the size cal, and that correction applied to the main calibration).
  
===The data processing of particle size calibration.===
+
===The data processing of particle size calibration===
 
*To calculate the particle size in Squirrel one needs the 4 parameters of the standard velocity equation.
 
*To calculate the particle size in Squirrel one needs the 4 parameters of the standard velocity equation.
 
   
 
   
*From the PSL data, one has to calculate the empirical parameter D* and b in Equation (1), as well as prescribe V_lens ~ 15 m/s (calculated from the time required for the air stream to transit the lens at 1.4 Torr, don’t need to redo every time) and V_gas ~ 450 m/s (determined in your system using the PToF of m/z 28).  
+
*From the PSL data, one has to calculate the empirical parameters D* and b in Equation (1), as well as prescribe V<sub>gasexit</sub> ~ 450 m/s (determined in your system using the PToF of m/z 28) and V<sub>gaslens</sub> ~ 15 m/s (calculated from the time required for the air stream to transit the lens at 1.4 Torr, don’t need to redo every time; i.e. you can calculate the linear velocity for your system using your conditions for: the ambient volumetric flowrate (~1.8 cc/s), ambient pressure (e.g. ~760 torr at sea level), lens pressure (~1.4 torr), and lens inner diameter (10 mm, see Liu et al. AS&T 2007) which would yield 12 m/s for these example inputs).
  
*Thus, the PSLs and NH4NO3 particle vacuum aerodynamic diameter should be known first (remember to calibrate the DMA first when using nitrate test aerosols) and also the velocity in the Equation (1) must be be calculated.
+
*Thus, the PSLs and NH4NO3 particle vacuum aerodynamic diameter should be known first (remember to calibrate the DMA first when using nitrate test aerosols) and also the velocity in the equation above must be be calculated.
 
<blockquote>
 
<blockquote>
 
1) For the particle aerodynamic diameter calculation.  
 
1) For the particle aerodynamic diameter calculation.  
Line 487: Line 502:
 
                 For NH4NO3:  Daero = Dmobility * 1.72 * 0.8  (4)
 
                 For NH4NO3:  Daero = Dmobility * 1.72 * 0.8  (4)
 
<blockquote>
 
<blockquote>
2)For the particle velocity calculation</blockquote>
+
2) For the particle velocity calculation</blockquote>
  
 
*The key to calculation of the particle velocity is to obtain an accurate particle flight time in the PToF flight region. There are some effects which need to be kept in mind when calculating the arrival time of particles. </blockquote>
 
*The key to calculation of the particle velocity is to obtain an accurate particle flight time in the PToF flight region. There are some effects which need to be kept in mind when calculating the arrival time of particles. </blockquote>
*One is chopper broadening effect which means that the finite with of the chopper opening will broaden the arrival time. I.e. the particles can enter the sizing region at anytime with the chopper slit is open to the particle beam path. The effect increases with a larger chopper duty cycle (open fraction). In reality typically one or no particles enter per chopper opening, but as one averages many chopper cycles the particle flight times average together to form a “square wave” pulse of particles.
+
*One is chopper broadening effect which means that the finite width of the chopper opening will broaden the arrival time. I.e. the particles can enter the sizing region at anytime when the chopper slit is open to the particle beam path. The effect increases with a larger chopper duty cycle (open fraction). In reality, typically one or no particles enter per chopper opening, but as one averages many chopper cycles the particle flight times average together to form a “square wave” pulse of particles.
*The other is Evaporative Broadening effect, especially for the PSLs. Even with the temperature of vaporizer at 800℃, Evaporation of PSLs still requires a significant time compared to the time-of-flight . This “smears” the signal to longer times, and makes using the “peak” of the signal undesirable.
+
*The other is an evaporative broadening effect, especially for the PSLs. Even with the temperature of the vaporizer at 800℃, evaporation of PSLs still requires a significant time compared to the particle time-of-flight. This “smears” the signal to longer times, and makes using the “peak” of the signal undesirable.
  
 
===Velocity calculation procedure for NH4NO3 and PSLs===
 
===Velocity calculation procedure for NH4NO3 and PSLs===
Line 501: Line 516:
 
3) For probing different traces, one can right-click the cursor dialogue to change the trace in which the cursor is sitting.</blockquote>
 
3) For probing different traces, one can right-click the cursor dialogue to change the trace in which the cursor is sitting.</blockquote>
 
<blockquote>
 
<blockquote>
4) For each NH4NO3 trace, the top of the first large peak (Q=1) is the point we are looking for. Ignore the doubly or triply charge particle peaks which occur later in PToF space(as Figure 4 shows). </blockquote>
+
4) For each NH4NO3 trace, the top of the first large peak (Q=1) is the point we are looking for. Ignore the doubly or triply charge particle peaks which occur later in PToF space (as Figure 4 shows). </blockquote>
 
<blockquote>
 
<blockquote>
5) The calibration needs to take into account the evaporation time which is relevant to your experiment. E.g. NH4NO3 particles may evaporate in 50-80 us, which is close to the evaporation times of most ambient particles. PSLs evaporate more slowly than typical ambient particles, and thus a small correction is needed in order to obtain a calibration which is most applicable to ambient particles. 2For PSLs, the point which we know best is the rising edge of the signal (Figure 4) We can then calculate the middle of the chopper opening by adding half of the chopper open time. </blockquote>
+
5) The calibration needs to take into account the evaporation time which is relevant to your experiment. E.g. NH4NO3 particles may evaporate in 50-80 us, which is close to the evaporation times of most ambient particles. PSLs evaporate more slowly than typical ambient particles, and thus a small correction is needed in order to obtain a calibration which is most applicable to ambient particles. For PSLs, the point which we know best is the rising edge of the signal (Figure 4) We can then calculate the middle of the chopper opening by adding half of the chopper open time. </blockquote>
 
         T<sub>PSL</sub>= T<sub>edge</sub>+0.5*(Chopper DC/ChopperHz)
 
         T<sub>PSL</sub>= T<sub>edge</sub>+0.5*(Chopper DC/ChopperHz)
 
         ChopperDC = Chopper Duty Cycle; Instrument specific: typically 1-4% which can be  
 
         ChopperDC = Chopper Duty Cycle; Instrument specific: typically 1-4% which can be  
 
         read in the Menu→defaults→chopper duty cycle.
 
         read in the Menu→defaults→chopper duty cycle.
 
[[file:size calibration-figure3.png|700px]]
 
[[file:size calibration-figure3.png|700px]]
<blockquote>''Figure 3 How to read flight time in each trace''</blockquote>
+
<blockquote>''Figure 3. How to read flight time in each trace''</blockquote>
 
[[file:size calibration-figure4.png|700px]]
 
[[file:size calibration-figure4.png|700px]]
<blockquote>''Figure 4 A schematic graph for PSLs and NH4NO3 arrival time calculation''</blockquote>
+
<blockquote>''Figure 4. Schematic graph for PSLs and NH4NO3 arrival time calculation''</blockquote>
 
<blockquote>
 
<blockquote>
6) Calculate particle velocity by Velocity (m/s) =Flight length(0.295m)/Flight Time</blockquote>
+
6) Calculate particle velocity: Velocity (m/s) = Flight length(0.295m)/Flight Time</blockquote>
 
<blockquote>
 
<blockquote>
 
7) Make a scatter plot of particle aerodynamic diameter vs. velocity as Figure 5 shows. </blockquote>
 
7) Make a scatter plot of particle aerodynamic diameter vs. velocity as Figure 5 shows. </blockquote>
Line 523: Line 538:
 
- D* and b are determined with the curvefitting.</blockquote>
 
- D* and b are determined with the curvefitting.</blockquote>
  
  An example of the user-defined function that needs to be used for the velocity calibration is below
+
An example of the user-defined function that needs to be used for the velocity calibration is below.
 
     Function PSL(w,dva) : FitFunc
 
     Function PSL(w,dva) : FitFunc
 
           Wave w
 
           Wave w
Line 529: Line 544:
 
       // This is a comment with typical values of the parameters
 
       // This is a comment with typical values of the parameters
 
       // Original parameters:
 
       // Original parameters:
 +
          // w[0]=V<sub>lens</sub> = 15
 
           // w[1]=V<sub>gas</sub> = 795
 
           // w[1]=V<sub>gas</sub> = 795
          // w[0]=V<sub>lens</sub> = 15
 
 
           // w[2]=D* = 3.758(20)
 
           // w[2]=D* = 3.758(20)
 
           // w[3]=b = 0.6398(0.4)
 
           // w[3]=b = 0.6398(0.4)
     return (w[0]+ ( w[1] - w[0])/(1+(dva/w[2])^w[3]))
+
     return w[0]+ (w[1] - w[0])/(1+(dva/w[2])^w[3])
 
     End
 
     End
  
In the future we should paste here some screenshots of the Igor fitting window, the results, etc.
+
In the future it would be useful to paste here some screenshots of the Igor fitting window, the results, etc.
 
[[file:size calibration-figure6.png|700px]]
 
[[file:size calibration-figure6.png|700px]]
<blockquote>''Figure6 Particle Aerodynamic Diameter Calibration window''.</blockquote>
+
<blockquote>''Figure 6. Particle Aerodynamic Diameter Calibration window''.</blockquote>
 
<blockquote>
 
<blockquote>
9) After determining the coefficients with curve fitting, the user should do two things: First, verify that the calibration equation explains the individual datapoints in the graph. Second, the old parameters should be replaced by the new ones in the AMS DAQ menu window (marked as a red box of Figure 6). If data has been acquired after the size calibration, but prior to inputing the new values in the DAQ software, the new coefficients can be input into the data analysis software (Squirrel). Then you need to redo the corrections for the PToF data (maybe also pre-process, we are not sure). </blockquote>
+
9) After determining the coefficients with curve fitting, the user should do two things: First, verify that the calibration equation explains the individual datapoints in the graph. Second, the old parameters should be replaced by the new ones in the AMS DAQ menu window (marked as a red box of Figure 6). If data has been acquired after the size calibration, but prior to inputing the new values in the DAQ software, the new coefficients can be input into the data analysis software (Squirrel). Then you need to redo the corrections for the PToF data. </blockquote>
  
 
==m/z Calibration in DAQ software==
 
==m/z Calibration in DAQ software==
 
===The principle of m/z calibration===
 
===The principle of m/z calibration===
 
*The principal purpose of the m/z calibration is to establish the relationship between recorded ion times-of-flight and ion m/z. The calibration in the DAQ software is based on a 3-point, linear least square fit. To calibrate, a mass spectrum is displayed in time-of-flight space. The user identifies the position of three peaks of known m/z, and the software calculates the linear fit.
 
*The principal purpose of the m/z calibration is to establish the relationship between recorded ion times-of-flight and ion m/z. The calibration in the DAQ software is based on a 3-point, linear least square fit. To calibrate, a mass spectrum is displayed in time-of-flight space. The user identifies the position of three peaks of known m/z, and the software calculates the linear fit.
**The calculated calibration is used for display purposes throughout the DAQ software. In addition, it is used to calculate the displayed and saved stick values (MS and PToF), and also the airbeam signal, to tune the MS etc.
+
**The calculated calibration is used for display purposes throughout the DAQ software. In addition, it is used to calculate the displayed and saved stick values (MS and PToF), and also the airbeam signal, to tune the MS, etc.
 
**SQUIRREL includes a higher order calibration routine. This is generally more accurate than the DAQ calibration, but it requires that the user save raw data. Raw data are always saved in MS mode, but the user decides (through a menu parameter) whether to save them in PToF mode. (WARNING: if your m/z calibration is poor in the DAQ software and you don’t save PToF raw data, you may lose information in PToF that cannot be recovered later).
 
**SQUIRREL includes a higher order calibration routine. This is generally more accurate than the DAQ calibration, but it requires that the user save raw data. Raw data are always saved in MS mode, but the user decides (through a menu parameter) whether to save them in PToF mode. (WARNING: if your m/z calibration is poor in the DAQ software and you don’t save PToF raw data, you may lose information in PToF that cannot be recovered later).
===The procedure to do m/z calibration===
+
 
 +
===The m/z calibration procedure===
 
[[file:mz calibration-figure1.png|700px]]
 
[[file:mz calibration-figure1.png|700px]]
<blockquote> ''figure 1''</blockquote>
+
<blockquote> ''Figure 1. m/z calibration window - locating known m/z peaks''</blockquote>
*The m/z calibration is based on three user-identified m/z peaks. It is usual to use m/z 14(N+), 28(N2+) and 184(W+). However other ions can also be used as long as they have a strong-enough signal and are dominated by a single elemental composition. Often m/z 40 (Ar+), m/z 149 or 167 or 279 (phthalate background peaks, often but not always present) can also be used. It is good to include a high m/z ion so that the calibration works for higher m/z. If you only use e.g. m/z 14, 28, and 32, then the m/z calibration may not extrapolate well to higher m/z.
+
*The m/z calibration is based on three user-identified m/z peaks. It is usual to use m/z 14(N+), 28(N2+) and 184(W+); however, other ions can also be used as long as they have a strong enough signal and are dominated by a single elemental composition. Often m/z 40 (Ar+), m/z 149 or 167 or 279 (phthalate background peaks, often but not always present) can also be used. It is good to include a high m/z ion so that the calibration works for higher m/z. If you only use e.g. m/z 14, 28, and 32, then the m/z calibration may not extrapolate well to higher m/z.
 
<blockquote>
 
<blockquote>
1)Set the Y intensity scale to Linear (Ctrl + L, toggle). Make sure the raw display is full scale (Ctrl+A).</blockquote>
+
1) Set the Y intensity scale to Linear (Ctrl + L, toggle). Make sure the raw display is full scale (Ctrl+A).</blockquote>
 
<blockquote>
 
<blockquote>
 
2) Move the chopper to the Open position</blockquote>
 
2) Move the chopper to the Open position</blockquote>
Line 558: Line 574:
 
3) Move the mouse arrow to the highest peak in the m/z raw display which should be N2+ peak. You can double-check the identity of the peak by opening and closing the inlet valve or moving the chopper. The peaks which vary dramatically with valve switching should be N2+ (highest one) and O2+. Once you have made sure that the mouse arrow is pointing to N2+, Press “F2”. A dotted green line with the labels “m2” at the top will mark the position where the mouse pointing. Make sure that the value in the text box below the middle peak contains the exact mass of N2+ (28.00615 ). </blockquote>
 
3) Move the mouse arrow to the highest peak in the m/z raw display which should be N2+ peak. You can double-check the identity of the peak by opening and closing the inlet valve or moving the chopper. The peaks which vary dramatically with valve switching should be N2+ (highest one) and O2+. Once you have made sure that the mouse arrow is pointing to N2+, Press “F2”. A dotted green line with the labels “m2” at the top will mark the position where the mouse pointing. Make sure that the value in the text box below the middle peak contains the exact mass of N2+ (28.00615 ). </blockquote>
 
<blockquote>
 
<blockquote>
4) The m/z=14 Peaks is to the left of N2+(28). One can take the obvious peaks at m/z 15, 17, 18 as reference to find m/z 14, as shown in the figure 1. The N+ peak is very low in signal compared to the N2+ peak. Press “Page Up” and Page down to set the Y-axis intensity to a proper scale. Once the N+ position is confirmed, Press “F1” to move the m1 line to the m/z 14 position. Again check that the value of the m/z below the m1 window is the correct one for N+ (14.00307)</blockquote>
+
4) The m/z=14 Peaks is to the left of N2+(28). One can take the obvious peaks at m/z 15, 17, 18 as reference to find m/z 14, as shown in the Figure 1. The N+ peak is very low in signal compared to the N2+ peak. Press “Page Up” and Page down to set the Y-axis intensity to a proper scale. Once the N+ position is confirmed (mouse arrow over), Press “F1” to move the m1 line to the m/z 14 position. Again check that the value of the m/z below the m1 window is the correct one for N+ (14.00307)</blockquote>
 
[[file:mz calibration-figure2.png|700px]]
 
[[file:mz calibration-figure2.png|700px]]
  
<blockquote>''Figure 2''</blockquote>
+
<blockquote>''Figure 2. m/z calibration window - fitting ion time of flight''</blockquote>
 
<blockquote>
 
<blockquote>
5) Zoom in the area around m/z 184, a tungsten peak (Left click and move the mouse arrow horizontally,  then loose the mouse and the raw display will zoom into m/z area in the line length). (Fig. 3) Also press “page up” to re-scale the signal intensity.. One can find the typical tungsten isotope pattern as shown in Figure 2 (m/z 182, 183, 184, and 186 with characteristic fractions).  Move the mouse arrow on and press F3. Again check that the exact mass of the ion is entered in the text box below the m3 ion (actually the exact mass for tungsten at m/z 184 is 183.9509 ).</blockquote>
+
5) Zoom in on the area around m/z 184, a tungsten peak (Left click and move the mouse arrow horizontally,  then loose the mouse and the raw display will zoom into m/z area in the line length). (Fig. 3) Also press “page up” to re-scale the signal intensity.. One can find the typical tungsten isotope pattern as shown in Figure 2 (m/z 182, 183, 184, and 186 with characteristic fractions).  Move the mouse arrow over and press F3. Again check that the exact mass of the ion is entered in the text box below the m3 ion (actually the exact mass for tungsten at m/z 184 is 183.9509 ).</blockquote>
 
<blockquote>
 
<blockquote>
 
6) If the calibration procedure above is done properly, Red Box 6 should show a good fit in which the peaks line up well (right figure) and the errors in the fit are within the blue lines (left figure).</blockquote>
 
6) If the calibration procedure above is done properly, Red Box 6 should show a good fit in which the peaks line up well (right figure) and the errors in the fit are within the blue lines (left figure).</blockquote>
Line 569: Line 585:
 
7) For each peak, the black line indicates the position of the m/z value in time-of-flight space, as calculated from the m/z calibration line. This should align with the maximum of the peak. One can adjust the calibration by using the arrow buttons, arrow keys (up/down/left/right = 1/-1/10/-10), or mouse scroll wheel.</blockquote>
 
7) For each peak, the black line indicates the position of the m/z value in time-of-flight space, as calculated from the m/z calibration line. This should align with the maximum of the peak. One can adjust the calibration by using the arrow buttons, arrow keys (up/down/left/right = 1/-1/10/-10), or mouse scroll wheel.</blockquote>
 
<blockquote>
 
<blockquote>
8) Then pressing “Save Current Values”, which will write the current calibration to all menu files in the active calibration group.
+
8) Then pressing “Save Current Values” which will write the current calibration to all menu files in the active calibration group.
 
</blockquote>
 
</blockquote>
  
 
==How to shut down the AMS==
 
==How to shut down the AMS==
'''Emergency Shut-Down Procedure(within 5 minutes)'''<blockquote></blockquote>
+
 
#CRITICAL: Close inlet valve!
+
===Regular AMS===
#CRITICAL: Turn off the TSP power supply.
+
'''Emergency Shut-Down Procedure (<5 min time available)'''
#Close the isolation valve between MD1 baking pump and turbo pump2
+
 
 +
#CRITICAL: Close the inlet valve!
 +
#CRITICAL: Turn off the TPS power supply.
 +
#Close the isolation valve between MD1 backing pump and turbo pump 2
 
#(not as critical) Turn off main DC power to Electronics Box
 
#(not as critical) Turn off main DC power to Electronics Box
 
#(not as critical) Turn off main DC power to Turbo Pump Box
 
#(not as critical) Turn off main DC power to Turbo Pump Box
  
  
'''Controlled Shut-Down Procedure(Assumes instrument is fully operational)'''
+
'''Controlled Shut-Down Procedure (assumes instrument is fully operational, takes about 5-40 min)'''
  
#Check the AMS instrument status before shut down procedure start, to make sure the AMS could be shut down in control.
+
#Confirm that the AMS is in a operational status, with all power supplies and software bits on the AMS computer running.
#Shut down the flow controller(bypass) which is an extra pump to sample ambient air in a high flow rate.
+
#Shut off any inlet bypass flows being used to sample ambient air at a high flow rate (and shut down any auxiliary pumps, if needed).
#Stop sample and exist DAQ procedure.
+
#Stop sampling and exit the DAQ software.
#Click “shut down all voltage” button in the TSP procedure, and wait until the “all the voltage shut down” appears in the dialogue of TPS. Turn off the power of TSP box.
+
#Click the “shut down all voltages” button in the TPS software, and wait until the “all voltages are shut down” message appears. Turn off the main power of TPS box.
 
#Close the inlet valve
 
#Close the inlet valve
#Shut down the power supply of chopper and vaporizer on the Electronic Box, and waiting to drop down the temperature of vaporizer to 70℃, which will takes about half an hour(if time is enough, the temperature should be down as low as possible. Because the non vacuum system will oxidize the vaporizer ).
+
#Shut down the power supply of chopper and vaporizer on the Electronic Box, and wait for the vaporizer temperature to drop down below 100℃ (typically 10-15 min). If time allows, the temperature should be as low as possible, because contact with air (in case of vacuum loss) will oxidize the vaporizer. If the system is known to be reasonably leak tight and there is no need to vent the system, this step might be skipped/shortened.
#Check all the AMS turbo status and record them. Turn off all the turbo pumps and keep the MD1 backing Pump on. The turbo pumps should be allowed to spin down until they stop (~10-20 min for a leak-free system). This Avoids putting additional stress on the pump bearing. '''If the system is being shut down for venting and must be vented before the turbo pumps have stopped spinning, venting should only be done via the vent port on pump #5 (V301). Open this vent port for just a fraction of a second and let the pumps reach a reduced speed (~ 1-2 minutes) before fully venting to atmosphere.'''
+
#Check the status of all AMS turbos and record them. Turn off all the turbo pumps and keep the MD1 backing pump on. The turbo pumps should be allowed to spin down until they stop. This avoids putting additional stress on the pump bearings. If your pumpbox firmware supports pump braking, you will see the pump speeds slowly going to zero (about 8 min for P5). If pump braking is not enabled, it will take about 15-20 min in a leak-free system for the pumps to stop, which you will be able to tell by feeling the pump bodies for vibrations. This step might be skipped in a controlled emergency to save time. '''If the system is being shut down for venting, it is highly recommended (by Varian) to spin down the pumps quickly by cracking open the vent port on pump #5 (V301) and pump #6 (V81) after closing the backing pump. Open these ports slowly till you hear the pump speed significantly changing, and let the pumps come to a full stop (~ 1-2 minutes). At that point you can fully open both ports to atmosphere''' (and remember to close them before you start the AMS next time!).
#After the turbo pumps have fully stopped, close the isolation valve between the MD1 diaphragm pump and turbo Pump2.
+
#After the turbo pumps have fully stopped, close the isolation valve between the MD1 diaphragm pump and turbo pump #2.
#Turn off the MD1 backing Pump. You can touch it to feel the MD1 backing Pump is on or not.
+
#Turn off the MD1 backing pump. You can confirm by touch ("feel the vibe") it if it is still running.
#Stop the power supply of Pump box and electronic box(PB and EB two buttons).
+
#Switch off the power supply to Pump Box and Electronics Box (PB and EB switches).
 
<blockquote>
 
<blockquote>
''If the outside power failes, it does not need to turn off the UPS. If the UPS consumes all the power, and you want to turn on the UPS, Please wait at least one hour to recharge UPS and then plug in the AMS.''</blockquote>
+
''If the outside power fails, and the system is running off an UPS, monitor the power remaining on the UPS and shut down the AMS system in a controlled manner if power is not restored before the UPS power is nearly spent. If the UPS consumes all the power during a power outage (e.g. at night when operator is not present), and you want to turn on the UPS, wait at least one hour to recharge UPS and then plug in the AMS.''</blockquote>
 +
 
 +
===Aircraft AMS===
 +
'''Emergency Shut-Down Procedure (<5 min time available)'''
 +
 
 +
(Step by step guide with pictures can be found here[https://docs.google.com/presentation/d/12hFUdIa7luHBsoqJJ1zZe6xxBh7mSgYtsVRDUqp2z1I/pub?start=false&loop=false&delayms=60000])
 +
 
 +
#CRITICAL: Close the inlet valve!
 +
#If possible, shut down the TPS voltages first (Firefox, TPS tab, Zero all voltages, wait till all fields turn blue)
 +
#CRITICAL: Turn off the TPS power supply (green switch in the back, next to the power plug).
 +
#If possible (2-3 min time), stop the turbos (either pumpbox front panel or in software) and wait till at least the V81s are stopped
 +
#In MICAS-X, set CPC protect to on (switch turns orange) 
 +
#Close the isolation valve between MD1 backing pump and turbo pump 2 (valve upstream of the MD1 closer to the ToF)
 +
#Close the PCI valve (large valve labelled PV-1 near the inlet valve)
 +
#Shutdown the computer
 +
#Turn off DC power to the main and auxiliary power box (2 switches towards the front of the instrument, between the racks, 8" high)
 +
#Turn off DC power to auxiliary pumps (2nd breaker towards the back of the instrument, between the racks)
 +
#Turn off DC power to pump box (1st breaker towards the back of the instrument, between the racks)
 +
#Turn off UPS by a) pressing both right buttons on the front of the UPS and b) flipping the switch on the front of the UPS and c) flipping the breaker on the back (upper right corner)
 +
 
 +
 
 +
 
 +
'''Controlled Shut-Down Procedure (assumes instrument is fully operational, takes 40 min)'''
 +
 
 +
#Stop sampling and exit DAQ software.
 +
#Stop cryopump. Start regeneration.
 +
#Go to Firefox to the TPS page. Click zero all (MAKE SURE ALL BOXES GO BLUE). Close Firefox.
 +
#Turn off the TPS power supply (green switch in the back, next to the power plug).
 +
#In MICAS-X (2nd tab), make sure OFR experiment is turned off, AMS is on filter, CPC protect is on (switch is orange). Close MICAS-X.
 +
#Close the inlet valve.
 +
#Close the PCI valve (large valve labelled PV-1 near the inlet valve)
 +
#Turn off DC power to auxiliary pumps (2nd breaker towards the back of the instrument, between the racks)
 +
#Once the cryo hits 273.15 K, switch off the vaporizer on the electronics box.
 +
#Turn off DC power to the main and auxiliary power box (2 switches towards the front of the instrument, between the racks, 8" high)
 +
#Once the cyro hits 280-290 K, shutdown the turbos by software. Set the autoupdate on the pump software to 5 s.
 +
#When P2 hits 300 Hz, close the isolation valve between MD1 backing pump and turbo pump 2 (valve upstream of the MD1 closer to the ToF)
 +
#Once the turbos are nearly shutdown, stop the cryo regeneration.
 +
#Wait till P5 is off and shutdown the computer.
 +
#Turn off DC power to pump box (1st breaker towards the back of the instrument, between the racks)
 +
#Turn off UPS by a) pressing both left buttons on the front of the UPS and b) flipping the switch on the front of the UPS and c) flipping the breaker on the back (upper right corner)

Latest revision as of 16:37, 12 November 2020

The purpose of this page is to serve as a repository of best practices on how to calibrate, operate, and document the calibrations/operation of a ToF-AMS during a field study. Much of it will also be relevant for lab studies.

Once the data have been acquired, please refer to the ToF-AMS Field Data Analysis Guide to guide the (very complex) data analysis phase.

This page was created by the Jimenez Group at CU-Boulder and Peter DeCarlo from PSI, with contributions from multiple other AMS Users.

Important Spares for a ToF-AMS Campaign

  • ToF-AMS Spares and Repair parts
    • Filaments (1-2 sets of 2) BN845088-T; Request Quote here
    • HS-81 servos with metal gears (3)
    • MCP sets (1-2 sets of 2, stored in vacuum chamber) (P/N: 33087 MCP 40/12/10/8 D 46:1 CZ 38FF EDR, TC; Contact Lynn Bergeron: l.bergeron@usa.photonis.com;(508)347-4027)
    • Critical orifices for pressure at sampling location (3)
    • Pulsers (if available)
    • Miniature tool set to replace filaments etc (check that ALL tools are inside -- the ones missing otherwise are likely to be the ones you need!)
    • Electronics cards: timer card, NI-6024E
    • Fans for AMS pumps: one small, one large
    • Clone (recent) of AMS Computer Hard Drive
    • Varian turbos: 1 V301 pump, 1 V70 or V81 pump, 1 V301 controller, 1 V70 or V81 controller (See Ed plan for vacuum failures)
    • Backing pump
    • CDs & usable serial No. for Visual Basic .NET 2003
    • He lecture bottle, regulator, hose, and "gun" for leak testing
    • Blank NW63 flanges (2), spare NW63 and NW100 O-rings (2 each)
    • Chopper motor
    • TORX T8 driver (for TPS module)
  • Important spares (electrical & electronic)
    • AC Plug tester
    • Multimeters (2)
    • Oscilloscope (Textronix TDS 220 or similar)
      • x10 dividing probe for scope
    • Soldering iron
    • Solder
    • High voltage probe
    • Variable DC power supply (1-2)
    • Function generator (1)
  • Important spares (computer)
    • 50 ft KVM cable (check USB or PS2)
  • Important spares & parts(flow)
    • Drycals (low and high range)
    • Rotameters for all important flows w/o particles
    • Small TSI flowmeters w/ power and RS-232 cables (3) (for flows that need to be logged)
    • White HEPA filters (2+) (rated to 70 lpm)
    • Set of two large 2-way valves to test whole inlet with filter regularly
    • Blue Balston filters (4x grade AA, rated 3.5 lpm)
    • Assorted stainless swagelok
    • Assorted brass and nylon ferrules
    • Set of O'Keefe critical orifices (check completeness)
    • Inlet manifold
    • Field Microscope
  • Logistics
    • First aid kit
    • Knee pads
    • Gloves (for moving)
    • Latex gloves (for vacuum)

Campaign Daily Checksheet

Operational parameters for the mass spectrometer, pumps, AMS electronics' box and general inlet flow setup should be checked frequently (ie at least daily) and logged. A worksheet used recently by the Jimenez Group can be found here. Note that the items in this worksheet are specific to the setup used and might have to be changed for your particular circumstances.

Inlet and Dryer Set up

Inlet Considerations

For a guide on particle transmission on inlets, see the following references:

For calculation of losses thru inlets:

Other useful inlet-related info:

  • Material: The inlet material needs to be conductive, as otherwise particle losses are severe due to electrophoresis. We normally use copper tubes for short-term studies (~1 month), as they work fine and are easier to work with. Stainless steel is better for longer term studies (years) and setups which are intended to be permanent.
  • Black conductive tubing (TSI) should be avoided for the AMS, as it can create chemical contamination from siloxanes that absorb onto the particles, but seems to be ok for non-chemical instruments such as the accumulation-mode SMPS. The two papers below report on the contamination of particles sampled through such tubing with semivolatile siloxanes that evaporate from the tubing and condense on the particles. This has been seen (but not published) in at least a dozen other cases, as far as I know. Note that one paper also reports that the levels of CO2 are perturbed, and it is likely that the levels of other gases are perturbed as well. The contamination is higher with increasing ambient temperature, and it it observed at normal lab temperatures. The particle phase contamination is typically small in terms of mass (unless you are atomizing particles in organic solvents, in which case it can be major), so using black tubing in SMPSs and similar instruments is generally ok. For chemical instruments it is best to not use it at all in any tubing upstream of the analysis, unless your instrument can separate the interference without loss of information. Also one of the papers reports that the affinity of the particles for water is affected by this tubing, thus it may be best to not use it in TDMAs, CCN instruments etc. The papers Sampling Artifacts from Conductive Silicone Tubing, Timko et al., Aerosol Sci. Technol. 2009; and Contamination from electrically conductive silicone tubing during aerosol chemical analysis, Yu et al., Atmospheric Environment, 2009. What causes electrophoresis losses are the surface charges that build on plastic tubing, and are worst for teflon, and also very bad for glass containers. Those surface charges can't be disipated since the material is not conductive, and they lead to high electric fields that attract the particles to the surface and cause their loss from the sampling stream. Any conductive material that can dissipate surface charges will do, and metals should be as good or better than the black tubing since their electrical conductivity is higher.
  • Diameter: this depends on the flow. You want to keep laminar flow (Reynolds number < 1000) as particle losses are much higher in turbulent flow than in laminar flow. Sometimes people use Re < 1500 as a cutoff, but that is risky as turbulence starts earlier in vibrating systems with pumps etc. Once the flow is laminar, you need to minimize residence time, as particle losses under laminar flow are just proportional to residence time in the tube. Since you will be using a cyclone to remove dust and avoid clogging of the critical orifice, that will dictate the flow rate, and that will determine the minimum diameter to keep Re < 1000. E.g. for a 10 lpm you need 3/8" OD (but the Re should be calculated with the actual ID, that does vary quite a bit). Then you want to use the smallest diameter which keeps Re < 1000.

Dryer Set Up

It is highly recommended that air is dried before AMS analsysis in order to reduce uncertainties in the bounce-related collection efficiency (Eb) and possible losses in particle transmission (E_L) if the particles grow too large at times of high RH. For more information see the CE section of the Field Data Analysis Guide.

There are 2 basic types of dryers that can be used. You need 2 dryers if you use diffusion dryers (like the TSI one with silica gel) so that you can regenerate one while the other is being used. However they often have to be replaced daily (depending on ambient RH and size) and doing that automatically is very complicated. (Although possible, IFT Leipzig has built some industrial-quality systems to do this). An easier alternative is to use a nafion dryer. We recommend dryers with metal casing, as those with plastic casing were observed to lead to losses of charged particles by P. McMurry's group (Jose can provide a report on this upon request). For the small flows that are typically needed, the MD series dryers from Perma Pure work well. What you need to do is to plumb the aerosol flow through the "straight" path, and then put a critical orifice on one end of the "outside" path and a pump on the other end. You want to have some flow on the outside path, but at a much reduced pressure (~1/10 of 1 atm). What drives the drying is the absolute humidity, so you are dropping that by x10, and that will drive the gas-phase H2O on the aerosol flow through the nafion membrane and to the outside path. A typical Gast pump/compressor will do. Very important, be very careful with the fittings on the dryer, as if rotated strongly one can break the internal seals of the nafion tube, and then you have a large leak and end up sampling room air.

If is worth convincing yourself that you don't have a leak by putting a filter before the dryer and sampling with a CPC, and similarly (w/o the filter) convincing yourself that particle number losses thru the dryer are not important. And of course, it helps to measure the RH before and after the dryer to make sure it is doing what it is supposed to do.

Tuning the Ion Source and ToF-MS

Note: these are some notes on tuning put together by P. DeCarlo and J.L. Jimenez, and circulated via email to Tofwerk and some core users. The responses that we got via email are inserted in the original list. There appear to be different schools of thought on how to tune, so these are given here only as guidelines.

  • ORDER OF TUNING
    • Tune ion source first for signal, then tune reflectron voltages for resolution, then tune Pulsers for detailed peak shape
  • ION SOURCE:
    • The tuning appears to depend on the emission current (maybe really filament current?) in a way that we don't understand. So it is important to tune at the emission current that will be used during measurements (typically 2 mA)
    • Don't change ion chamber from design values for that ToF by more than 10% (design values = 49V for cToF, 35V for vToF, and 8.5 for wToF, from Katrin's email on 3/1/2006)
    • In general we don't tune the ion chamber. Rather we tune the heater bias, which will typically be a few volts lower than the ion chamber value.
      • Response from Achim T: Tuning the ion chamber makes a lot of sense. It affects the ion signal a lot by a better extraction of the ions into the Pulser region. In the moment we have no evidence that changes in a certain range (not up to 80 V) will lead to a loss of small ions. The post acceleration affects this loss in a similar way like the ion chamber voltage. By increasing it the ions get a higher velocity perpendicular to the ion extraction. This has the opposite effect to increasing the ion chamber voltage.
    • The difference between the ion chamber and the filament should be 70 V (this is the electron energy)
      • Response from Katrin F: This is somewhat flexible, since depending on where you set your extraction lens voltage you may have a range of potentials in the ion source (due to field penetration). The problem is that what you see on the tof detector will be a folding of the Energy acceptance of the TOF (which is on maximum at the 49eV for the C etc) And the energy distribution of the ions transferred in the TOF extraction. Depending on your LV settings you will get ions of different energies into the TOF extraction. To be sure that you have preferentially 70eV ions one would need to compare to a reference spectrum, and tune the LV until you reproduce the reference spectrum. In principle you should be fine if you use the same voltages relative to the ion source as with the quad settings (what voltages did you use there to get the 70eV reference spectra?) for filament, ion chamber, and extraction lens.
    • The ion energy into the ToF orthogonal extractor is determined by the ion chamber. Changing the ion energy will change the m/z-dependence of the extraction efficiency. This should not be changed during a campaign.
    • Deflector flange needs to walk with the deflector voltage, small changes between the two are okay, and fractional volts can help a lot
    • Electron Pusher is not connected and is disabled in recent TPS software versions.
  • HIGH VOLTAGE:
    • Tune reflectron grid and backplane together. This is the best way to increase resolution.
      • Response from Katrin F: Just tuning RG is sufficient.
    • Lens: this was added to tune off V-mode ions in W-mode. It should be high (~2800 V) in W mode and low (~1000) in V-mode
      • Response from Achim T: Tuning the lens voltage helps a lot by reducing the vmode ions in W mode and by increasing the signal. The quoted numbers of 1000 V for Vmode and 2800 V for Wmade are typical but they vary a lot. There are instruments which have the best vmode performance with a lense voltage of 2300 V.
    • MCP and post-acceleration are NOT tuned, these are set for amplification depending on other considerations (saturation, signal-to-noise, etc.)
    • Hardmirror doesn't have much effect on signal or resolution, no need to tune much
      • Response from Katrin F: Yes, hardmirror should NOT be tuned
      • Response from Achim T: The hardmirror has an effect on the peak shape and signal height. But you may have to vary it by some hundred Volts. In a well tuned instrument it has really no effect.
  • PULSERS
    • The three should be tuned together
      • Response from Katrin F: I would prefer in the future that the pulser is left at the settings I ship it. You can get the same effects by just tuning the LV.
    • These should NOT be set higher than 800V
    • Tuning these 3 together is the best way to tune out leading and tailing edges
    • U+Low is not connected and doesn't do anything

Standard Field Calibration procedures

Data Acquisition and Instrument Control Software (DAQ): Make sure you are doing data acquisition with the latest version of Acquisition software whether a ToF or a Quad. (upgrade before field campaign, and check for any problems)

Saving Frequency: at least 5 min data on fixed time grid (on the hour).

m/z Range: at least scan m/z 0-300 (Q). One should go higher with the ToF instruments around m/z 10-500 is encouraged.

m/z's for Q-AMS PToF Mode: For particle TOF data the following masses should be used at a minimum: 16, 28, 30, 35, 43, 44, 46, 48, 55, 57, 60, 64

JMS Mode: For Q-AMS Jump mass spec (JMS) mode can be used, but it is not necessary for ground based monitoring unless mass concentrations are very low (remote clean sites). Note that the m/z's used in JMS mode are hardwired to be the same as those in PToF mode.

Vaporizer temperature: 600C is standard.

Dryer: If you have the ability to dry the aerosol inlet, do that. It simplifies the application of the componsition-dependent CE (Eb), see the Field Data Analysis Wiki for details. A nafion dryer from Perma-Pure (MD-110 with Steel casing, AVOID plastic casings) is recommended. The drying counterflow can be provided by ambient air whose pressure is reduced with a critical orifice, so no dry air supply is needed. Diffusion dryers filled with silica gel can also be used but require constant monitoring of the indicator and frequent changes which is more prone to leaks. Depending on the humidity and the sample flow rate they may be spent and no longer dry after only one day of sampling. If you cannot dry, at the very least measure of the RH at the AMS inlet is needed if the inlet line is not dried. This measurement is best done in the line to the pump for the AMS bypass flow, to avoid perturbing the flow going into the AMS which could lead to particle losses.

Calibration Frequency Description
Inline HEPA Filter At least every 3 days, best to do every day at the site.

Also do this every time the instrument has been vented/pumped down.

30 minute (if every 3 days) or 10 min (every day) HEPA filtered, particle free air from inlet (NOT air from the room which will have increased CO2).

Do not filter at the same time every day. See suggested schedule below.

HEPA should be put on inlet outside (if possible) and this will also allow a check for leaks in the inlet system, using a CPC or the AMS itself (although the CPC is much more sensitive to small leaks).

Note that there is an Inlet delay, so one should reinitialize (F5) AMS acquisition after the inlet residence time has elapsed so that the data files are not mixed filter/ambient data

IE calibration Every Week (minimum)

2x a week better, and anytime the instrument has been pumped down, or there has been a problem. Specifically it is CRITICAL to do at least one new IE calibration if a filament and/or MCP/electron multiplier are changed.

Standard Ammonium Nitrate IE calibration.
Baseline / SI calibration Before every IE calibration See Instructions for Bitwise below
Size Calibration Do at beginning and end of Campaign, and if there is a large instrument problem (e.g. loss of a pump etc.) Standard AMS size calibration

Note that size calibration changes if lens pressure changes. So if you change the orifice and the lens P changes more than 3%, you should do another size cal. (changes in P are amplified into larger changes in size)

Flow Calibration Do at beginning and end of Campaign, or if you change or clean the cirtical orifice, or if there is a problem or change on the baratron P gage used to quantify AMS flow Standard AMS flow calibration

Please note whether the flowmeter you are using reports volumetric or mass flow. For volumetric flow, note whether it reports it under ambient T & P conditions, or under some standard conditions (e.g STP of 1 atm and 273 K, but people use many other definitions).

Clock Synchonization Computer clocks can drift by up to 1 min per day (occasionally worse). Either set up automatically or keep track of instrument clock in relation to other clocks.

Suggested Filter Times (perform the filter blank during the time interval indicated):

Day of week Week 1 Week 2 Week 3 Week 4 Week 5
Monday 800-900 1000-1100 1200-1300 1400-1500 1600-1700
Tuesday 1100-1200 1300-1400 1500-1600 1700-1800 900-1000
Wednesday 1200-1300 1400-1500 1600-1700 800-900 1000-1100
Thursday 1500-1600 1700-1800 900-1000 1100-1200 1300-1400
Friday 1600-1700 800-900 1000-1100 1200-1300 1400-1500
Saturday 900-1000 1100-1200 1300-1400 1500-1600 1700-1800
Sunday 1200-1300 1400-1500 1600-1700 800-900 1000-1100

Single Ion Calibration (Bitwise)

(from Peter DeCarlo's powerpoint)


Weiwei will add text here

Ionization Efficiency (IE) Calibration

(from Peter DeCarlo's powerpoint, adapted by Weiwei Hu, revised by Doug Day and Jose-Luis Jimenez)

The Principle of the IE calibration

  • The ionization (and transmission) efficiency (IE) is the number of ions measured from a “known” amount of mass entering the ToF-AMS.
  • The Relative Ionization Efficiency (RIE) is the ratio of the IE of a species (e.g. NH4) to IENO3

1 What is the “Known” amount of mass

  • The known amount of mass is based on generation of dry particles size-selected by a DMA system.
  • Typical sizes used in the calibration are ~350-450 nm in mobility diameter. The critical consideration is that ALL particles must produce detectable signals. Since there will be a distribution of the number of ions produced for various particles (due to random variations of the ionization and detection process, plus the fact that the particles are not truly monodisperse), some particles will produce more ions than others. If only the particles that produce more ions are detected, and the ones that produce fewer ions are not, then the IE determined with the detected particles (with BFSP) will be too high, and the concentrations reported with this IE will be too low. From experience, for typical V-Mode HR-ToF-AMS sensitivity, this requires 400 nm particles. For a Q-AMS 350 nm particles are typical (and this is easier to verify with the graphs in the main PToF window in the Q-AMS software). For a C-ToF-AMS, 300 nm may still be sufficient. A way to check whether you are not detecting all particles is to plot the AMS/CPC number ratio as a function of particle size. This ratio should be between 80%-120%, and will have a plateau when all particles are detected, but will decrease when particles start to be too small. It is possible to use larger particles than the minimum size, but normally the number of particles produced by the atomizer and size-selected by the DMA decreases strongly with size, so the statistics of the IE calibration get worse (i.e. the calibration is noisier).
  • The number concentration should be kept low enough so that the probability of having two particles within one chopper cycle is small (e.g. < 5%). This typically means < 200 particles/cm3. Otherwise you will often have more than one calibration particle during a chopper cycle. However, the calibration analysis software assumes that only one particle is present, and then the IE will be overestimated. To estimate the number concentration which is tolerable, let’s assume a 2% chopper duty cycle with a flow of 1.5 cm3/s and a chopper frequency of 130 Hz. If we assume that the output of the DMA has 100 particles/cm3, then each second 100*1.5 =150 particles are entering the instrument. The chopper removes 98% of those, so each second only 150 * 2% = 3 part/sec are reaching the AMS vaporizer. Given the chopper frequency of 130 Hz, that means that 3/130 = 2.3% of the chopper cycles will have a particle, and thus the calibration data is good with respect to this criterion. In fact we could work with 200 part/cm3 and still have less than 5% coincidence errors. Note that the probability of having two particles, when at least 1 particle is present, is the same probability as having one particle, as this is a Poisson process with uncorrelated events, i.e. one particle doesn’t know what the other particles are doing. E.g. in our example the probability of having one particle in a chopper cycle is 2.3%, and the probability of having two particles in any chopper cycle is 2.3%*2.3%. But the probability of having two particles when at least one is present is 2.3%. So in summary, the particle number should be kept around 200 p/cm3. In the other direction, you can work with much lower particle concentrations without having coincidence errors, but then you will detect very few particles per unit time, and the calibration will take a long time - or be noisy is not too few particles are collected.
  • For the BFSP calibration, you want to detect at least 300 individual particles (no matter whether it takes a short or long time). This is because, from experience, once this number is reached the result of the IE calibration changes little, while it can be variable (noisy) for much smaller numbers of individual particles.
  • For comparison with the CPC, it is important that the particles are well mixed across the tubing, and that losses between the point in which the CPC and AMS flows are split and the instruments themselves are very small. For this reason, a mixing volume is needed between the any points aerosol dilution and the CPC+AMS split, and short sampling lines avoiding sharp turns are needed after this split. Also a bypass line as close to the AMS as possible is useful to reduce residence time (and thus losses) on the AMS line.
  • Properly drying particles before the DMA is very important. Otherwise the particles may contain water, and when they are selected by the DMA they will contain less NH4NO3 than dry particles of the same mobility diameters. This will cause a low bias in the determined IE. One can look for the particle-phase water signal with the AMS, although the detection limit is typically high due to the high background H2O+ in the AMS vacuum chamber. This needs to be done with the PToF mode, as the BFSP mode is too noisy for H2O+, and the MS mode also responds to water vapor which is difficult to separate from particle-phase water.
  • Evaporation of NH4NO3 in the lines is possible and has been reported by some investigators, especially for long lines or lines exposed to hot components or air. Most of the time however, evaporation is not observed. For this reason it is also recommended to keep lines as short as possible, and to avoid exposing the lines to any hot elements or hot air arising from fans, etc. Also for this reason the AMS size measurement should be used to check the particle size. If the size does not agree with the DMA-selected size, and the AMS has been calibrated with PSLs and is being operated at the same lens pressure as during the PSL calibration, it is possible that this is due to NH4NO3 evaporation on the lines (or wet particles).

2 General Set-up

EI calibration-figure1.png

Figure 1. Diagram of AMS and other instrument setup for IE calibrations (drier can be Nafion or silica gel dryer)
  • Currently there are two common methods in use: 1) DMA/CPC mass based method; 2) Single particle based method, Brute Force Single Particle (BFSP). Both methods should be used at all times. The DMA/CPC method is very risky as one depends on the CPC counting efficiency and plumbing, which can easily introduce large errors in the IE. CPCs are notorious for having problems that reduce (or sometimes enhance) the particle counting efficiency. Your CPC should always be checked before by comparing it to at least one other CPC. A CPC is also used in the BFSP method, to provide a comparison to the particle concentration determined with the AMS. This can be critical to uncover problems with the calibration setup.
    • The BFSP calibration is only possible with the C-ToF or the V-ToF modes. The number of ions detected in W-mode is way too small for the BFSP calibration. The DMA/CPC mass-based mode can be applied to all ToF-AMS versions.

3 Setting up the AMS DAQ Software for IE calibration

  • It is useful to use more than one menu during IE calibration. The menu used for standard acquisition should generally be used. In addition, it is useful to have another specific calibration menu (a menu similar to the acquisition menu that will be used in the lab experiments or field sampling, but modified as described below) (see Figure 2).

EI calibration-figure2.png

4 How to set up the IE calibration menu

EI calibration-figure3.png

Figure 3. Timing example for IE cal V Menu
Timing tab
  • No Co-Adds - This gives better size resolution.
  • Faster Pulsing - This increases the actual number of ions measured and improves the probability of detecting a particle, as well as the detected ions per particle (IPP). Pete DeCarlo recommends using the pulsing period of 25 us for V-mode, which will limit the maximum m/z range to 200 (~19,000 samples). Jose thinks that that an even smaller m/z range with a faster pulsing period (e.g. going to m/z 60) is even better. Note that a pulsing period shorter than about 12 us is not allowed by the software, as otherwise you could destroy the pulsers by overheating (this has been “achieved” in the past).
  • IMPORTANT:The measured IE value with a menu with faster pulsing will need to be scaled by the ratio of the pulsing period during calibration to the pulsing period during measurement. E.g. if you determine IE = 1e-7 with pulsing of 25 us, and your regular acquisition menu uses 50 us, the IE that applies to your regular acquisition menu is 1e-7*25/50 = 5e-8. (Due to possible confusion arising from this and other similar effects, it is useful to actually use both menus in your IE cal. Then the faster pulsing menu provides better quantification, while your regular acquisition menu provides a check on that quantification).

EI calibration-figure4.png

Figure 4. Averaging and Saving example for IE calibration V menu

Averaging and Saving tab
1) IMPORTANT: operate the instrument and save data from all GENALT modes: BFSP, MS, PToF. Generally we give a larger fraction of the time to BFSP as it takes longer to accumulate the data needed for calibration. For example, in Figure 4 we have 5s for MS, 5s for PToF, and 15s for BFSP (60% of acquisition time). The other modes are important for:
  • PToF mode: determining the doubly charged particle correction and to detect the possible presence of particle-water.
  • MS mode: to apply the DMA/CPC method and to determine RIENH4 since signal-to-noise is highest in MS mode.
2) You need to only select to save HDF files; itx files are needed for the BFSP IE calibration software but by default are always saved during BFSP mode; HDF files are needed for use in Squirrel for processing the MS and PToF data.
3) Filter BFSP data for ammonium nitrate particles; so that an excessive amount of data is not saved. This tells the DAQ software to only save BFSP data if an ammonium nitrate particle is detected. The Signal Threshold for the BSFP always is set to 10 bits. (This assumes typical settings for the Acquiris AP240 board in terms of gain (voltage range), threshold, and bandwidth. If the number of particles counted with the AMS vs. CPC is not consistent, one could experiment with this threshold. Using a filter as the inlet, you can lower or increase the threshold to a point for which no false particles are counted, but not much above that).
For the Bitwise tab (baseline and SI threshold)
  • Check the baseline and threshold. See if it is the same as the one you used in the normal sampling. If not, change the bitwise to match the ambient sampling ones. Prior to an IE cal you need to do a baseline and SI calibration. IMPORTANT: if the baseline, threshold, or SI change significantly and you have data acquired with the old settings (that you care about), you need to do the IE calibration with both the OLD settings and the NEW settings, in order to be able to quantify data acquired both ways.
EI calibration-figure5.png

Figure 5. TPS menu tab

For the TPS menu tab
  • You need to make sure that all the TPS (TOF power supply) settings in the IE cal menu are the same as for the menu used during normal sampling. If the values are not the same, they cannot be changed in this tab if “TPS remote control” is enabled. In that case you can change them in the tuning tab of the “m/z calibration” window. Consistency with the standard operating menus is most easily achieved by cloning the standard menus and then making the modifications described here.

EI calibration-figure6.png

Figure 6. Screenshot during acquisition of IE calibration data with pure NH4NO3 particles

For the BFSP calibration
1) Make sure that the experimental setup for the IE calibration is set up properly as shown in Figure 1, and that size-selected ammonium nitrate is being sampled by the AMS.
2) Make sure the SP Choppers / Files is < 5% (depending on the error that you want to tolerate, others would say 10%). This reduces the probability of 2 particles entering the PToF region during the same chopper cycle. For example in the figure above SP_Choppers = 552, meaning that data for 552 chopper periods have been downloaded to RAM memory and the software has determined that only 40 of those (~7%) actually contain signal for an NH4NO3 particle.
3) Take a screenshot or two and paste them into powerpoint, so that you have an easy-to-read (and share with remote collaborators) record of the calibration (Air beam, flow, graphs, etc.). Also record all relevant parameters (electronically or in a paper notebook), such as DMA sheath flow, DMA aerosol flow, AMS bypass flow, AMS flow, CPC flow, vaporizer temperature, chopper frequency, CPC screen number, Number co-adds, pulser period, BFSP threshold, MS-AB, SI, Runs, BW (the file name for saving the Bitwise calibration data), MCP value, the AN particle Size for calibration, etc.
4) Wait until particle number acquired in the BFSP mode is above 300 (see the discussion above for the experience behind this number). To check the number of the particles saved look at the particle number which is the last number before “_BFSP” in the file name (in BFSP data folder). Otherwise count all the files which have been recorded in the recent BFSP operation. Another way is to keep an eye on the number of particles detected in the display, but this number gets reset every time the GENALT menu cycles (so you need to sum separately in that case).

5) After 300 files, 300 particles have been saved in BFSP mode, and you can press stop. It is better to record data with more than one particle size, and also to make sure that there is no threshold bias. Afterward, one should compare BFSP IE with mass-based IE, and for different size calibration particles if time allows. Details can be seen in Edward Dunlea's presentation from the AMS User’s Meeting:

http://cires.colorado.edu/jimenez-group/UsrMtgs/UsersMtg7/ie_cal_tutorial.pdf
6) It can be useful to also sample air through a HEPA filter during BFSP calibration to make sure that no “false particles” are being counted.
DMA/CPC-based IE calibration (sometimes known as “mass-based” method)
1) Before sampling ammonium nitrate particles for the DMA/CPC IE calibration, a blank filter sampling should be done first (put the HEPA filter on the inlet to filter particles from room air). Press “Acquire” and sample the filtered room air from for 10~20 minutes.
2) Set up the calibration system as shown in Figure 1. Record the CPC into the DAQ software, or otherwise record it manually at regular intervals (it is best if the count rate of the CPC is stable throughout the calibration period).
3) Produce a monodisperse aerosol flow by selecting one particle mobile diameter with the DMA. 400 nm is recommended for V-mode (see discussion above) although the particle size restrictions discussed above do not apply here. However, it is important to keep the mass fraction of multiply-charged particles to a minimum. Then continuously acquire ammonium nitrate particle data in MS and PToF modes. Do print screen and record the parameters as described in procedure 3) in the BFSP IE cal above.
4) Every 1-2 menu cycles, adjust the needle valve of the aerosol diluter to get different particle number concentrations which can be read from CPC. Note that in this method the number of particles/cm3 can be much larger than 200, since we do not rely on detecting individual particles but rather the total averaged signal from many particles.
5) If it is possible, one can repeat the DMA/CPC IE cal for multiple particle sizes to test if the particle size has an influence on the IE cal results.

5.1 Data processing of IE calibration (for BFSP data analysis)

EI calibration-figure7.png

Figure 7. Loading the BFSP Data with IE calibration software
1) Find your “BFSPData” folder
2) Find your “AutoSaveData” folder
3) Load your data

EI calibration-figure8.png

Figure 8 Processing IE BFSP data-Select the different PToF regions (Step 1)

EI calibration-figure9.png

Figure 9. Processing IE BFSP data-Select the different PToF regions (Step 2)
4) Press “Graph in New Window” and a new copy Graph named “particle Time of Flight” will show, like the one on the left in Figure 8.
5) Use the Marquee function and right click to select the areas for the IE calibration. There are three regions that need to be defined. One is the “Particle Arrival Region”, the other two are “Baseline Region #1” and “Baseline Region #2”. To mark the “Particle Arrival region” for example, one can use the Igor Marquee to select this region in the green box (Figure 8) and right click to select “Tof IE Calibration-Set Dva Range”. There will appear dialog box to ask you to define the name of this region (red box Figure 9).
The baseline region is the background region, so the signal in this region should be small and stable (before and after the expected particles arrival signals). It is common to see doubly charged particles in the IE calibration (black box in the Figure 8). When one selects “Particle Arrival Region”, the doubly charged particles should NOT be included, just select the singly charged particle arrival region as shown in the green box selection in Figure 8.

EI calibration-figure10.png

Figure 10. Processing IE BFSP data -fill in necessary information for IE calculation

6) Check the SI value, enter the mobility diameter used in the IE calibration (compare to that calculated from the AMS size measurement, if the DMA and AMS do not agree, see above).

7) Go through several dozen particles individually using the “particle #” scroll. Setting the min IPP to e.g. 2 is fine to start. Redo the calibration with different values of the minimum IPP and see if the results change. If the min IPP is too low, then some individual particle events will look like noise. If that’s the case, either filter those out manually (“Add to Blacklist” button), or increase the value of the min IPP (check that when you do this, you are not removing some real particles as well). Avoid setting too high of a min IPP as you may miss some real particles.
8) Click “Do It!”

EI calibration-figure11.png

Figure 11. Processing IE BFSP data- IE calibration output.
9) The results from the calculations are the IE for ammonium nitrate, RIE (of ammonium; but you should use the one determined with MS mode), Ions-per-particle, IE/AB, Flow rate and Pulser Period. The IE/AB is the number that should be used for input into the DAQ and Squirrel.

Why should we input the IE/AB value? If your pulser period is different for your calibration menu, then the IE you input will be different than the IE you measured, but your IE/AB will be the same! IEDAQ = IEMeas * PulserPeriodIE/PulserPeriodAcq Or alternatively: IEDAQ= IE/ABMeas * ABAcq Where IEDAQ is the value to input into the Menu in the DAQ software; ABmeas is the air beam measured in the IE cal. ABAcq is the air beam measured in the normal ambient sampling.

10) The histograms show the distribution of ion signals for each m/z, and for each species. Look for anomalous values (very high or very low values) which may perturb the result.
11) Panel 11 above shows the IE and RIE results for each individual particle vs particle number. This can be useful for evaluating whether you have enough particles, as well as to look for outliers (e.g. “particles” affected by cell phone or other noise, etc.)
12) For the W-mode we generally do not determine the IE directly. Rather the W-mode IE can be obtained from the following equation:
   IE(w)=IE(v)*(AB(w)/AB(v))

13) The RIENH4 of W-mode needs to be determined from the Squirrel data recorded in W-mode.

5.2 Data processing of IE calibration (for DMA/CPC data analysis)

1) Use Squirrel to calculate mass loadings with an assumed IE.

2) Calculate mass loadings from CPC number concentrations according to the equations below.

EI calibration-figure13.png
3) Make a scatter plot for the different NO3 mass concentrations calculated from the DMA/CPC vs AMS NO3 accordingly, as shown in Figure 12. Do a linear curve fit to determine a slope and intercept.

EI calibration-figure12.png

Figure 12. Scatter plot of NO3 mass from CPC vs NO3 mass from AMS

4) The CPC/AMS-based new IE and RIE can be obtained from the equation following (be sure to account for pulser period, if applicable).

EI calibration-figure14.png
5) W mode IE is calculated as in the same way as described in the BFSP data processing procedure 10).


  • Theoretical explanation of Mass Quantification with AMS see Section 5 of:

Jimenez et al., Ambient Sampling using the Aerodyne Aerosol Mass Spectrometer. JGR, 2003(and also review paper of Canagaratna et al., Mass Spec Rev 2007).

  • Particle Mass Calculator for ToF Calibration using Mass-based method:

http://cires.colorado.edu/jimenez-group/AerosolMassCalc.xls

  • See Edward Dunlea’s presentation from AMS User’s Meeting:

http://cires.colorado.edu/jimenez-group/UsrMtgs/UsersMtg7/ie_cal_tutorial.pdf

  • IGOR .ipf for BFSP IE processing:

http://cires.colorado.edu/jimenez-group/ToFAMSResources/ToFSoftware/index.html#ToF_IE_Cal

Particle Size Calibration

(from Peter DeCarlo's powerpoint, adapted by Weiwei Hu, revised by Doug Day and Jose-Luis Jimenez)

Principle of Particle Size Calibration

  • The AMS reports a vacuum aerodynamic particle size (DeCarlo et al., AS&T 2004) based on a particle velocity measurement. The start of the timing for particle flight begins with the opening of the chopper, and ends with the detection of ions. The Particle Time-of-Flight (PToF) timescale is milliseconds, while the ion time-of-flight is microseconds, which is why we can use the ion detection as our “time end”.
  • The relationship between particle aerodynamic diameter and particle velocity can be described by an empirical sizing equation. One can use calibration aerosol of known diameter and density, typically calibrated polystyrene latex spheres (PSLs) or SMPS size-selected NH4NO3 particles to determine the empirical parameters in the velocity equation. For the Vel calibration, using PSL is standard procedure; for special applications of the AMS, such as a lab SOA experiment and new particle formation, it may be better to also include NH4NO3 particles in the velocity calibration since a range of particles extending to smaller sizes may be desired. The velocity equation is (Allan et al., JGR 2003):

  <z/12>Velocity=(Flight length/Flight Time) = Vgaslens + [Vgasexit – Vgaslens] / [1 + (Daero/D*) b]   (1)
       Vgaslens = velocity of gas in the lens (m/s; ~15 m/s)
       Vgasexit = velocity of gas at the lens exit (m/s).
       Daero = vacuum aerodynamic diameter of PSLs or NH4NO3(nm)
       D* = empirical parameter known as scale diameter (~5 nm)
       b = empirical parameter (typically ~0.5, unitless)
         Flight Length = 0.295 m (short chamber)
         Flight Time = flight time of PSLs or NH4NO3 particles

In practice the equation has 4 degrees of freedom, but all of our data with PSLs lie in a region which is a line in log space, and can be described with 2 parameters. Thus if one tries to do a fitting with all 4 equation parameters free, many solutions are possible. To remove these extra spurious degrees of freedom, we normally only fit D* and b, while Vgaslens and Vgasexit are assigned values and held constant during the fit.

Calibration Setup for Particle Size Calibration

A) Standard calibration for field purposes (“accumulation mode”)
1) Setup a particle generation system consisting of an atomizer and dryer flowing into the AMS inlet (flow should be vented to the atmosphere through a HEPA filter to ensure that the AMS inlet is not pressurized)
2) Use only PSLs: 100, 300, 500, 700, 900 nm (below 100 nm they stick together and are very difficult to work with, above 900 nm the transmission through the AMS inlet and lens is low). Mixed solutions can be used such as 100, 500 and 900 nm and another with 300 and 700 nm. Two or three PSL drops from an original packaged PSL bottles are enough for a 100 ml atomizer bottle. Much more may need to be added for the larger sizes since the solutions have fewer particles). It is a good practice to sonicate the solutions for 5 min before use, ESPECIALLY if they are old. Solutions should be kept in the fridge (but not freezer) between uses, as otherwise bacteria may grow.

Size calibration-figure1.png

Figure 1. Add m/z 51 (maybe also 104, but has slower evaporation) for PSLs, or m/z 46 for nitrate in the PToF display list shown above
3) For PSLs, set the vaporizer to 800C (not too hot, and don’t leave there too long or you can destroy the vaporizer). The goal is to have rapid evaporation of the PSLs. Once this is achieved, there is no point in having the vaporizer hotter. Choose m/z 51 (potentially also m/z 104 or other PSL ions) in the PToF mode (Figure 1). For NH4NO3 set the vaporizer temperature to 600℃ (m/z 46 is selected).
4) NH4NO3 (selected by a DMA) can also be used for calibration. In this case IT IS CRITICAL to first calibrate the DMA with PSLs, as DMAs can easily be off by several percent (often 10 or 20%) in diameter, and thus the cube of that error in volume and mass. For example a 5% error in diameter corresponds to a 16% error in mass. Use of ammonium nitrate allows for calibration using particle sizes smaller than 100 nm (more easily than trying to work with small PSLs, which is possible but more difficult), as well as calibration with particle sizes for which you don’t have PSLs. However, the PSL diameter is known with much higher precision (resolution of ~100, i.e. uncertainty in size of ~1%), while the DMA selection has a resolution of ~10 (uncertainty of 10%). For the NH4NO3 calibration at low sizes (e.g 60 nm), it is necessary to increase the atomizer-produced number concentration to produce a post size selection CPC concentration of as much as 1e4 cm-3, so that adequate mass concentration is detected in the AMS PToF mode.
5) One can create a new menu for the particle size calibration (e.g. named “IE”)
i. For the most accurate size calibration, the time resolution of the PToF data is key. If the regular menu (acquisition) has co-adds = 1, it can be used for size calibration
ii. If the regular menu has co-adds > 1, then it preferable to conduct the size calibration with both the regular menu AND a menu with co-adds = 1
iii. Using a menu with faster pulsing may be advantageous because you get more points in PToF space (and a high m/z range is not needed). Note that there can be small shifts in the apparent size calibration when pulsing faster though, so it is best to acquire with both a regular pulsing menu and a fast pulsing menu. One can push V-mode to ~25 us pulser period with an m/z range up to ~200 (you can pulse it at 12 us and still get m/z 51).

B) Acquire the particle size calibration data</blockquote> </blockquote> Size calibration-figure2.png

Figure 2. PToF acquire page layout

1) Make sure that the AUTOSAVE is off (can also be done with autosave, some people prefer this, but operator must ensure that each file saved corresponds to just one particle size – or solution in case of using multiple PSLs at one time). Then the data will be saved manually by pressing the F3 key to save a file, and F5 to reinitialize. And also make sure the itx and HDF file will both be saved (one can set this in the menu→saving and setting→data files).
2) Check that the pressure in the lens when sampling calibration particles is the same as when doing ambient sampling. If it is not, the size calibration will change, this can be accounted for but it does take some work (see below). Click “PToF” on the TOF-AMS DAQ Main Menu. Open the page layout as Figure 2 shows.
3) Press “F5” on the keyboard or “Acquire” in the DAQ to acquire the calibration data.
4) Record the current Run number and the detailed information about the this time calibration samples, such as PSLs or NH4NO3, DMA diameter reading, the CPC screen number, Lens pressure (from electronics box and software). It is often useful to save some print screens into powerpoint for easy reference later.
5) Wait until a clear peak (PSL or nitrate m/z) is shown in the PToF screen and the position and height of peak is stable for a while (about 50s or 200 cycles – this will depend on your specific experimental setup, dilution of the PSL solution, etc.). If no clear peak appears for the PSLs, check that the vaporizer is glowing orange. If not, it may not be hot enough, due to vaporizer failure, or a problem with the vaporizer electronics. For nitrate, the heater should NOT be glowing, just at regular 600C operating temperature (faint beginning of a glow). Otherwise, too low of particle concentration reaching the AMS is a likely cause of an absence of a PToF peak.

6) Press “F3” to save data. The data will be found in the

file: \\TofAMS\TofAMSData\NonAutoSaveData.
7) Repeat procedure 3 to 6 to acquire data for different size PSLs or NH4NO3 monodisperse particles.

C) When do I need to redo the size calibration?

  • The size calibration for a given instrument is ONLY a function of the flow rate (lens pressure). So generally once per campaign is sufficient (or once per critical orifice, if different orifices are used). Once at the start and once at the end of the campaign is good practice, particularly when the instrument is shipped.

It is possible to correct mathematically for small deviations on the flowrate (see Bahreini et al. 2004 in JGR, which has the equations; the equations should be used to calculate the % perturbation on the size cal, and that correction applied to the main calibration).

The data processing of particle size calibration

  • To calculate the particle size in Squirrel one needs the 4 parameters of the standard velocity equation.
  • From the PSL data, one has to calculate the empirical parameters D* and b in Equation (1), as well as prescribe Vgasexit ~ 450 m/s (determined in your system using the PToF of m/z 28) and Vgaslens ~ 15 m/s (calculated from the time required for the air stream to transit the lens at 1.4 Torr, don’t need to redo every time; i.e. you can calculate the linear velocity for your system using your conditions for: the ambient volumetric flowrate (~1.8 cc/s), ambient pressure (e.g. ~760 torr at sea level), lens pressure (~1.4 torr), and lens inner diameter (10 mm, see Liu et al. AS&T 2007) which would yield 12 m/s for these example inputs).
  • Thus, the PSLs and NH4NO3 particle vacuum aerodynamic diameter should be known first (remember to calibrate the DMA first when using nitrate test aerosols) and also the velocity in the equation above must be be calculated.

1) For the particle aerodynamic diameter calculation.

The DMA selects particles based on their mobility diameter. Note that we normally want to use particles with a single elementary unit of charge (Q=1). However particles with Q > 1 may also be selected, which are much larger than those with Q = 1. If this is the case, it needs to be accounted for in the processing of the calibration. The mobility diameter can be transformed to vacuum aerodynamic diameter using the general formula shown in Equation (2). The specific conversion for PSLs and NH4NO3 can be obtained from Equation (3) and (4). Further details can be found in DeCarlo et al. (AS&T 2004).
            dva = Dmobility * density * shape factor    (2)
               For PSLs:   Daero = Dmobility * 1.054 * 1   (3)
               For NH4NO3:  Daero = Dmobility * 1.72 * 0.8  (4)
2) For the particle velocity calculation
  • The key to calculation of the particle velocity is to obtain an accurate particle flight time in the PToF flight region. There are some effects which need to be kept in mind when calculating the arrival time of particles. </blockquote>
  • One is chopper broadening effect which means that the finite width of the chopper opening will broaden the arrival time. I.e. the particles can enter the sizing region at anytime when the chopper slit is open to the particle beam path. The effect increases with a larger chopper duty cycle (open fraction). In reality, typically one or no particles enter per chopper opening, but as one averages many chopper cycles the particle flight times average together to form a “square wave” pulse of particles.
  • The other is an evaporative broadening effect, especially for the PSLs. Even with the temperature of the vaporizer at 800℃, evaporation of PSLs still requires a significant time compared to the particle time-of-flight. This “smears” the signal to longer times, and makes using the “peak” of the signal undesirable.

Velocity calculation procedure for NH4NO3 and PSLs

1) Download the particle size calibration data and import into an Igor experiment. Graph all the traces (m/z 46, for NH4NO3; m/z 51, for PSLs) and color code them as Figure 3 shows.
2) Use the Igor Cursor (Ctrl+I) to probe the X value (particle flight time) for each trace (One trace is one experiment, generally one or a few particle sizes).
3) For probing different traces, one can right-click the cursor dialogue to change the trace in which the cursor is sitting.
4) For each NH4NO3 trace, the top of the first large peak (Q=1) is the point we are looking for. Ignore the doubly or triply charge particle peaks which occur later in PToF space (as Figure 4 shows).
5) The calibration needs to take into account the evaporation time which is relevant to your experiment. E.g. NH4NO3 particles may evaporate in 50-80 us, which is close to the evaporation times of most ambient particles. PSLs evaporate more slowly than typical ambient particles, and thus a small correction is needed in order to obtain a calibration which is most applicable to ambient particles. For PSLs, the point which we know best is the rising edge of the signal (Figure 4) We can then calculate the middle of the chopper opening by adding half of the chopper open time.
       TPSL= Tedge+0.5*(Chopper DC/ChopperHz)
       ChopperDC = Chopper Duty Cycle; Instrument specific: typically 1-4% which can be 
       read in the Menu→defaults→chopper duty cycle.

Size calibration-figure3.png

Figure 3. How to read flight time in each trace

Size calibration-figure4.png

Figure 4. Schematic graph for PSLs and NH4NO3 arrival time calculation
6) Calculate particle velocity: Velocity (m/s) = Flight length(0.295m)/Flight Time
7) Make a scatter plot of particle aerodynamic diameter vs. velocity as Figure 5 shows.

Size calibration-figure5.png

Figure 5. Velocities plotted against Particle Aerodynamic Diameter
8)Using the combined PSL/NH4NO3 data set, determine the values of D* and b using non-linear least squares custom fitting in Igor, with “User-defined equation” using Equation (1). The curve fitting function is used as follows:
- Vgas and Vlens are pre-assigned and held as discussed above.
- D* and b are determined with the curvefitting.

An example of the user-defined function that needs to be used for the velocity calibration is below.

   Function PSL(w,dva) : FitFunc
         Wave w
         Variable dva
      // This is a comment with typical values of the parameters
      // Original parameters:
         // w[0]=Vlens = 15
         // w[1]=Vgas = 795
         // w[2]=D* = 3.758(20)
         // w[3]=b = 0.6398(0.4)
    return w[0]+ (w[1] - w[0])/(1+(dva/w[2])^w[3])
   End

In the future it would be useful to paste here some screenshots of the Igor fitting window, the results, etc. Size calibration-figure6.png

Figure 6. Particle Aerodynamic Diameter Calibration window.
9) After determining the coefficients with curve fitting, the user should do two things: First, verify that the calibration equation explains the individual datapoints in the graph. Second, the old parameters should be replaced by the new ones in the AMS DAQ menu window (marked as a red box of Figure 6). If data has been acquired after the size calibration, but prior to inputing the new values in the DAQ software, the new coefficients can be input into the data analysis software (Squirrel). Then you need to redo the corrections for the PToF data.

m/z Calibration in DAQ software

The principle of m/z calibration

  • The principal purpose of the m/z calibration is to establish the relationship between recorded ion times-of-flight and ion m/z. The calibration in the DAQ software is based on a 3-point, linear least square fit. To calibrate, a mass spectrum is displayed in time-of-flight space. The user identifies the position of three peaks of known m/z, and the software calculates the linear fit.
    • The calculated calibration is used for display purposes throughout the DAQ software. In addition, it is used to calculate the displayed and saved stick values (MS and PToF), and also the airbeam signal, to tune the MS, etc.
    • SQUIRREL includes a higher order calibration routine. This is generally more accurate than the DAQ calibration, but it requires that the user save raw data. Raw data are always saved in MS mode, but the user decides (through a menu parameter) whether to save them in PToF mode. (WARNING: if your m/z calibration is poor in the DAQ software and you don’t save PToF raw data, you may lose information in PToF that cannot be recovered later).

The m/z calibration procedure

Mz calibration-figure1.png

Figure 1. m/z calibration window - locating known m/z peaks
  • The m/z calibration is based on three user-identified m/z peaks. It is usual to use m/z 14(N+), 28(N2+) and 184(W+); however, other ions can also be used as long as they have a strong enough signal and are dominated by a single elemental composition. Often m/z 40 (Ar+), m/z 149 or 167 or 279 (phthalate background peaks, often but not always present) can also be used. It is good to include a high m/z ion so that the calibration works for higher m/z. If you only use e.g. m/z 14, 28, and 32, then the m/z calibration may not extrapolate well to higher m/z.
1) Set the Y intensity scale to Linear (Ctrl + L, toggle). Make sure the raw display is full scale (Ctrl+A).
2) Move the chopper to the Open position
3) Move the mouse arrow to the highest peak in the m/z raw display which should be N2+ peak. You can double-check the identity of the peak by opening and closing the inlet valve or moving the chopper. The peaks which vary dramatically with valve switching should be N2+ (highest one) and O2+. Once you have made sure that the mouse arrow is pointing to N2+, Press “F2”. A dotted green line with the labels “m2” at the top will mark the position where the mouse pointing. Make sure that the value in the text box below the middle peak contains the exact mass of N2+ (28.00615 ).
4) The m/z=14 Peaks is to the left of N2+(28). One can take the obvious peaks at m/z 15, 17, 18 as reference to find m/z 14, as shown in the Figure 1. The N+ peak is very low in signal compared to the N2+ peak. Press “Page Up” and Page down to set the Y-axis intensity to a proper scale. Once the N+ position is confirmed (mouse arrow over), Press “F1” to move the m1 line to the m/z 14 position. Again check that the value of the m/z below the m1 window is the correct one for N+ (14.00307)

Mz calibration-figure2.png

Figure 2. m/z calibration window - fitting ion time of flight
5) Zoom in on the area around m/z 184, a tungsten peak (Left click and move the mouse arrow horizontally, then loose the mouse and the raw display will zoom into m/z area in the line length). (Fig. 3) Also press “page up” to re-scale the signal intensity.. One can find the typical tungsten isotope pattern as shown in Figure 2 (m/z 182, 183, 184, and 186 with characteristic fractions). Move the mouse arrow over and press F3. Again check that the exact mass of the ion is entered in the text box below the m3 ion (actually the exact mass for tungsten at m/z 184 is 183.9509 ).
6) If the calibration procedure above is done properly, Red Box 6 should show a good fit in which the peaks line up well (right figure) and the errors in the fit are within the blue lines (left figure).
7) For each peak, the black line indicates the position of the m/z value in time-of-flight space, as calculated from the m/z calibration line. This should align with the maximum of the peak. One can adjust the calibration by using the arrow buttons, arrow keys (up/down/left/right = 1/-1/10/-10), or mouse scroll wheel.

8) Then pressing “Save Current Values” which will write the current calibration to all menu files in the active calibration group.

How to shut down the AMS

Regular AMS

Emergency Shut-Down Procedure (<5 min time available)

  1. CRITICAL: Close the inlet valve!
  2. CRITICAL: Turn off the TPS power supply.
  3. Close the isolation valve between MD1 backing pump and turbo pump 2
  4. (not as critical) Turn off main DC power to Electronics Box
  5. (not as critical) Turn off main DC power to Turbo Pump Box


Controlled Shut-Down Procedure (assumes instrument is fully operational, takes about 5-40 min)

  1. Confirm that the AMS is in a operational status, with all power supplies and software bits on the AMS computer running.
  2. Shut off any inlet bypass flows being used to sample ambient air at a high flow rate (and shut down any auxiliary pumps, if needed).
  3. Stop sampling and exit the DAQ software.
  4. Click the “shut down all voltages” button in the TPS software, and wait until the “all voltages are shut down” message appears. Turn off the main power of TPS box.
  5. Close the inlet valve
  6. Shut down the power supply of chopper and vaporizer on the Electronic Box, and wait for the vaporizer temperature to drop down below 100℃ (typically 10-15 min). If time allows, the temperature should be as low as possible, because contact with air (in case of vacuum loss) will oxidize the vaporizer. If the system is known to be reasonably leak tight and there is no need to vent the system, this step might be skipped/shortened.
  7. Check the status of all AMS turbos and record them. Turn off all the turbo pumps and keep the MD1 backing pump on. The turbo pumps should be allowed to spin down until they stop. This avoids putting additional stress on the pump bearings. If your pumpbox firmware supports pump braking, you will see the pump speeds slowly going to zero (about 8 min for P5). If pump braking is not enabled, it will take about 15-20 min in a leak-free system for the pumps to stop, which you will be able to tell by feeling the pump bodies for vibrations. This step might be skipped in a controlled emergency to save time. If the system is being shut down for venting, it is highly recommended (by Varian) to spin down the pumps quickly by cracking open the vent port on pump #5 (V301) and pump #6 (V81) after closing the backing pump. Open these ports slowly till you hear the pump speed significantly changing, and let the pumps come to a full stop (~ 1-2 minutes). At that point you can fully open both ports to atmosphere (and remember to close them before you start the AMS next time!).
  8. After the turbo pumps have fully stopped, close the isolation valve between the MD1 diaphragm pump and turbo pump #2.
  9. Turn off the MD1 backing pump. You can confirm by touch ("feel the vibe") it if it is still running.
  10. Switch off the power supply to Pump Box and Electronics Box (PB and EB switches).
If the outside power fails, and the system is running off an UPS, monitor the power remaining on the UPS and shut down the AMS system in a controlled manner if power is not restored before the UPS power is nearly spent. If the UPS consumes all the power during a power outage (e.g. at night when operator is not present), and you want to turn on the UPS, wait at least one hour to recharge UPS and then plug in the AMS.

Aircraft AMS

Emergency Shut-Down Procedure (<5 min time available)

(Step by step guide with pictures can be found here[1])

  1. CRITICAL: Close the inlet valve!
  2. If possible, shut down the TPS voltages first (Firefox, TPS tab, Zero all voltages, wait till all fields turn blue)
  3. CRITICAL: Turn off the TPS power supply (green switch in the back, next to the power plug).
  4. If possible (2-3 min time), stop the turbos (either pumpbox front panel or in software) and wait till at least the V81s are stopped
  5. In MICAS-X, set CPC protect to on (switch turns orange)
  6. Close the isolation valve between MD1 backing pump and turbo pump 2 (valve upstream of the MD1 closer to the ToF)
  7. Close the PCI valve (large valve labelled PV-1 near the inlet valve)
  8. Shutdown the computer
  9. Turn off DC power to the main and auxiliary power box (2 switches towards the front of the instrument, between the racks, 8" high)
  10. Turn off DC power to auxiliary pumps (2nd breaker towards the back of the instrument, between the racks)
  11. Turn off DC power to pump box (1st breaker towards the back of the instrument, between the racks)
  12. Turn off UPS by a) pressing both right buttons on the front of the UPS and b) flipping the switch on the front of the UPS and c) flipping the breaker on the back (upper right corner)


Controlled Shut-Down Procedure (assumes instrument is fully operational, takes 40 min)

  1. Stop sampling and exit DAQ software.
  2. Stop cryopump. Start regeneration.
  3. Go to Firefox to the TPS page. Click zero all (MAKE SURE ALL BOXES GO BLUE). Close Firefox.
  4. Turn off the TPS power supply (green switch in the back, next to the power plug).
  5. In MICAS-X (2nd tab), make sure OFR experiment is turned off, AMS is on filter, CPC protect is on (switch is orange). Close MICAS-X.
  6. Close the inlet valve.
  7. Close the PCI valve (large valve labelled PV-1 near the inlet valve)
  8. Turn off DC power to auxiliary pumps (2nd breaker towards the back of the instrument, between the racks)
  9. Once the cryo hits 273.15 K, switch off the vaporizer on the electronics box.
  10. Turn off DC power to the main and auxiliary power box (2 switches towards the front of the instrument, between the racks, 8" high)
  11. Once the cyro hits 280-290 K, shutdown the turbos by software. Set the autoupdate on the pump software to 5 s.
  12. When P2 hits 300 Hz, close the isolation valve between MD1 backing pump and turbo pump 2 (valve upstream of the MD1 closer to the ToF)
  13. Once the turbos are nearly shutdown, stop the cryo regeneration.
  14. Wait till P5 is off and shutdown the computer.
  15. Turn off DC power to pump box (1st breaker towards the back of the instrument, between the racks)
  16. Turn off UPS by a) pressing both left buttons on the front of the UPS and b) flipping the switch on the front of the UPS and c) flipping the breaker on the back (upper right corner)