Difference between revisions of "CalNex-JG"
From Jimenez Group Wiki
(→Tasks in preparation for CalNex-LA) |
(→Tasks in preparation for CalNex-LA) |
||
Line 39: | Line 39: | ||
* Distribution of tasks while in the field | * Distribution of tasks while in the field | ||
− | ** EI- | + | ** EI-AMS (Patrick, Amber) |
− | ** PAM | + | ** PAM (Amber) |
− | ** MAB-AMS | + | ** MAB-AMS (Carly) |
− | ** | + | ** SMPS, CPC on Carly's Inlet (operated by Mike) |
− | ** SMPS, CPC | + | ** SMPS, CPC on Amber's Inlet (operated by Mike) |
− | ** Downloading data from other instruments and model, making graphs and posting them | + | ** Calibration CPC (Mike) |
+ | ** OPC (Michael w/Ingrid) | ||
+ | ** DustTrak | ||
+ | ** TAG-AMS ( | ||
+ | ** Downloading data from other instruments and model, making graphs and posting them (Ingrid) | ||
== Tasks for Michael upon arrival at the site == | == Tasks for Michael upon arrival at the site == |
Revision as of 10:29, 4 March 2010
This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with the Main CalNex-LA page or the CalNex-LA Logistics page.
Tasks in preparation for CalNex-LA
- Field kit
- broken UPS & check all UPSs: Delphine
- CPC 3010: Mike
- Orifices: Michael
- DMA Column: Mike
- Sturdier foldable tables: Michael (Carly's guidance)
- Shelves + Racks: Ingrid (from home), Mike (from home), buy more?
- Organization - Try to have ready by Mar 18 (next business mtg)
- Which AMSs to bring: MAB-AMS + LAB-AMS + C-AMS
- Follow up with Eben about LS: Mike
- AMS alternation: PAM + TD: on LAB-AMS
- Ambient: 1min V, 1 min W
- PAM: same
- TD: same
- Need to set up + test Jayne switching valves: Mike + Amber
- concentrator: Sanna not sure if she can make it, she can send concentrator at least 2 weeks in advance: we will use w/ MAB (Jose will email Sanna)
- Need a set of valves for concentrator: Carly w/ yellow - Amber will show her
- Need to be able to step vaporizer temperatures: Carly
- Inlet schematic for J-Group instruments: account for all fittings + tubing a priori: Carly + Amber (Delphine or Alex will dig out MILAGRO and/or BEARPEX). Include how to test for leaks and flows. Need to communicate
- Put together 2x valve filtering system for inlet, order valves if needed (Delphine)
- Which SMPSs
- One in parallel with Lab-AMS, one in parallel with MAB-AMS, one as shared calibration system ($Mike$ + Ingrid + Michael + Donna)
- PTRMS sharing for PAM: Amber will contact Martin.Graus@nooa.gov
- OPC: Michael. Mike will tweak software to report PM1, PM2.5, PM10.
- Radioactive source and chemical inventory and shipping: Michael
- Driving our stuff there: Michael will rent truck (Penske).
- Drivers: Michael + Ingrid, Michael + Mike. Amber doesn't mind -->, Donna as backup.
- Jose asked Joost (21-Feb-10): they will drive one truck and one trailer, maybe we can share, we'll touch base closer to the date.
- Everyone in charge of something should check big CalNex spreadsheet today
- Logging computers: Mike C.
- Which AMSs to bring: MAB-AMS + LAB-AMS + C-AMS
- Uploading and plotting data in real-time: Ingrid, Donna
- Support: Delphine
- Distribution of tasks while in the field
- EI-AMS (Patrick, Amber)
- PAM (Amber)
- MAB-AMS (Carly)
- SMPS, CPC on Carly's Inlet (operated by Mike)
- SMPS, CPC on Amber's Inlet (operated by Mike)
- Calibration CPC (Mike)
- OPC (Michael w/Ingrid)
- DustTrak
- TAG-AMS (
- Downloading data from other instruments and model, making graphs and posting them (Ingrid)
Tasks for Michael upon arrival at the site
- Check electrical connections with plug tester
- Label all the plugs in all trailers with the circuit number, if not already labeled.
- Make power budget sheet for each trailer, post prominently.
- Check all pumps with DustTrak and portable CPC (need to borrow from Suzanne Hering) as they are being installed.
- Post maps of Caltech and the local area, as well as hardware stores etc. in all trailers (next to door).
Tasks for People during the experiment
- Keep on top of butanol scrubbing for our CPCs