== Distribution of tasks while in the field == | == Distribution of tasks while in the field == | ||
* EI-AMS (Patrick, Amber) | * EI-AMS (Patrick, Amber) | ||
− | * PAM (Amber) | + | ** PAM (Amber) |
+ | ** Thermal Denuder (Amber) | ||
* MAB-AMS (Carly) | * MAB-AMS (Carly) | ||
* C-AMS (??) | * C-AMS (??) | ||
Line 46: | Line 47: | ||
* SMPS, CPC on Carly's Inlet (operated by Mike) | * SMPS, CPC on Carly's Inlet (operated by Mike) | ||
* SMPS, CPC on Amber's Inlet (operated by Mike) | * SMPS, CPC on Amber's Inlet (operated by Mike) | ||
+ | * SMPS, CPC for calibration (operated as needed) | ||
* Calibration CPC (Mike) | * Calibration CPC (Mike) | ||
* OPC (Michael w/Ingrid) | * OPC (Michael w/Ingrid) |
Revision as of 10:33, 4 March 2010
This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with the Main CalNex-LA page or the CalNex-LA Logistics page.
Contents
Tasks in preparation for CalNex-LA
- Field kit
- broken UPS & check all UPSs: Delphine
- CPC 3010: Mike
- Orifices: Michael
- DMA Column: Mike
- Sturdier foldable tables: Michael (Carly's guidance)
- Shelves + Racks: Ingrid (from home), Mike (from home), buy more?
- Organization - Try to have ready by Mar 18 (next business mtg)
- Which AMSs to bring: MAB-AMS + LAB-AMS + C-AMS
- Follow up with Eben about LS: Mike
- AMS alternation: PAM + TD: on LAB-AMS
- Ambient: 1min V, 1 min W
- PAM: same
- TD: same
- Need to set up + test Jayne switching valves: Mike + Amber
- concentrator: Sanna not sure if she can make it, she can send concentrator at least 2 weeks in advance: we will use w/ MAB (Jose will email Sanna)
- Need a set of valves for concentrator: Carly w/ yellow - Amber will show her
- Need to be able to step vaporizer temperatures: Carly
- Inlet schematic for J-Group instruments: account for all fittings + tubing a priori: Carly + Amber (Delphine or Alex will dig out MILAGRO and/or BEARPEX). Include how to test for leaks and flows. Need to communicate
- Put together 2x valve filtering system for inlet, order valves if needed (Delphine)
- Which SMPSs
- One in parallel with Lab-AMS, one in parallel with MAB-AMS, one as shared calibration system ($Mike$ + Ingrid + Michael + Donna)
- PTRMS sharing for PAM: Amber will contact Martin.Graus@nooa.gov
- OPC: Michael. Mike will tweak software to report PM1, PM2.5, PM10.
- Radioactive source and chemical inventory and shipping: Michael
- Driving our stuff there: Michael will rent truck (Penske).
- Drivers: Michael + Ingrid, Michael + Mike. Amber doesn't mind -->, Donna as backup.
- Jose asked Joost (21-Feb-10): they will drive one truck and one trailer, maybe we can share, we'll touch base closer to the date.
- Everyone in charge of something should check big CalNex spreadsheet today
- Logging computers: Mike C.
- Which AMSs to bring: MAB-AMS + LAB-AMS + C-AMS
- Uploading and plotting data in real-time: Ingrid, Donna
- Support: Delphine
Distribution of tasks while in the field
- EI-AMS (Patrick, Amber)
- PAM (Amber)
- Thermal Denuder (Amber)
- MAB-AMS (Carly)
- C-AMS (??)
- w/Light Scattering? (??)
- SMPS, CPC on Carly's Inlet (operated by Mike)
- SMPS, CPC on Amber's Inlet (operated by Mike)
- SMPS, CPC for calibration (operated as needed)
- Calibration CPC (Mike)
- OPC (Michael w/Ingrid)
- DustTrak (??)
- TAG-AMS (
- Downloading data from other instruments and model, making graphs and posting them (Ingrid)
Tasks for Michael upon arrival at the site
- Check electrical connections with plug tester
- Label all the plugs in all trailers with the circuit number, if not already labeled.
- Make power budget sheet for each trailer, post prominently.
- Check all pumps with DustTrak and portable CPC (need to borrow from Suzanne Hering) as they are being installed.
- Post maps of Caltech and the local area, as well as hardware stores etc. in all trailers (next to door).
Tasks for People during the experiment
- Keep on top of butanol scrubbing for our CPCs