Difference between revisions of "CalNex-JG"
From Jimenez Group Wiki
(→Logging & pumping summary) |
(→Tasks in preparation for CalNex-LA) |
||
Line 14: | Line 14: | ||
** add to the packing list things that don't go in boxes (tables, at least 7 chairs, etc.) | ** add to the packing list things that don't go in boxes (tables, at least 7 chairs, etc.) | ||
** buy a large grey box for 3rd SMPS | ** buy a large grey box for 3rd SMPS | ||
− | + | ** clamps or racks for gas cylinders | |
* Organization - Try to have ready by Mar 18 (next business mtg) | * Organization - Try to have ready by Mar 18 (next business mtg) | ||
Line 36: | Line 36: | ||
** OPC: Michael. Mike will tweak software to report PM1, PM2.5, PM10. | ** OPC: Michael. Mike will tweak software to report PM1, PM2.5, PM10. | ||
** Radioactive source and chemical inventory and shipping: Michael | ** Radioactive source and chemical inventory and shipping: Michael | ||
+ | ** Gas requirements (current plan is to bring everything from CU) | ||
+ | *** zero air (1 tank at a time, probably 2 tanks total) - Amber | ||
+ | *** N2 (3 cylinders) - Amber | ||
+ | *** research-grade N2 - Carly | ||
+ | *** research-grade Ar - Carly | ||
+ | *** research-grade Kr (2 lecture bottles) - Carly | ||
+ | |||
+ | |||
** Driving our stuff there: Michael will rent truck (Penske). | ** Driving our stuff there: Michael will rent truck (Penske). | ||
*** pick up truck Saturday, May 1 | *** pick up truck Saturday, May 1 |
Revision as of 09:11, 1 April 2010
This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with the Main CalNex-LA page or the CalNex-LA Logistics page.
Contents
Tasks in preparation for CalNex-LA
- Field kit
- broken UPS (new one ordered, old one to be sent out once new box arrives) & check all UPSs (in process): Delphine
- CPC 3010: Mike (called TSI, need paperwork from Michael -> Mike, send this week)
- Orifices: Michael (start 3/19)
- DMA Column: Mike (send back on Monday if not fixed by Mike on 3/19)
- SMPS not scanning: Mike (analog problem?); could use in current state as calibration box
- CPC comparison: Mike (tweaking labView code)
- Sturdier foldable tables: Michael (Carly's guidance); still in process, have 2 to test ($59 each) get 4 more
- Shelves + Racks: Ingrid (from home), Mike (from home), buy more?
- add to the packing list things that don't go in boxes (tables, at least 7 chairs, etc.)
- buy a large grey box for 3rd SMPS
- clamps or racks for gas cylinders
- Organization - Try to have ready by Mar 18 (next business mtg)
- Which AMSs to bring: MAB-AMS + LAB-AMS + C-AMS
- Follow up with Eben about LS: Mike (Jose emails Eben)
- AMS alternation: PAM + TD: on LAB-AMS
- Ambient: 1min V, 1 min W
- PAM: same
- TD: same
- Need to set up + test Jayne switching valves: Mike + Amber (Friday 3/19)
- concentrator: Sanna not sure if she can make it, she can send concentrator at least 2 weeks in advance: we will use w/ MAB (Jose will email Sanna)
- Need a set of valves for concentrator: Carly w/ yellow - Amber will show her
- Need to be able to step vaporizer temperatures: Carly
- Inlet schematic for J-Group instruments: account for all fittings + tubing a priori: Carly + Amber (Delphine or Alex will dig out MILAGRO and/or BEARPEX). Include how to test for leaks and flows. Need to communicate
- After assigning instruments to inlets, assign logging computers to instruments
- TSI software and Labview software can't run on the same computer
- After assigning instruments to inlets, assign logging computers to instruments
- Put together 2x valve filtering system for inlets (3): (Delphine) (valves/tees/etc. found, set aside)
- Which SMPSs
- One in parallel with Lab-AMS, one in parallel with MAB-AMS, one as shared calibration system ($Mike$ + Ingrid + Michael + Donna)
- PTRMS sharing for PAM: Amber will contact Martin.Graus@nooa.gov
- OPC: Michael. Mike will tweak software to report PM1, PM2.5, PM10.
- Radioactive source and chemical inventory and shipping: Michael
- Gas requirements (current plan is to bring everything from CU)
- zero air (1 tank at a time, probably 2 tanks total) - Amber
- N2 (3 cylinders) - Amber
- research-grade N2 - Carly
- research-grade Ar - Carly
- research-grade Kr (2 lecture bottles) - Carly
- Which AMSs to bring: MAB-AMS + LAB-AMS + C-AMS
- Driving our stuff there: Michael will rent truck (Penske).
- pick up truck Saturday, May 1
- load Sunday, May 2
- TO CalNex: Michael + Amber, departing Boulder May 3, arriving Pasadena May 4
- FROM CalNex: Michael + Mike, departing Pasadena June 18, arriving Boulder June 19
- Logging computers: Mike C.
- Driving our stuff there: Michael will rent truck (Penske).
Power Breakdown for Jimenez Trailer at CalNex-LA
- PAM-TD-AMS related instruments
- Circuit 1: 13.64 A
- HR-AMS 6.36 A, 700 W instrument; 4.55 A, 500 W pumps
- Thermo Denuder (TD) 2.73 A, 300W
- Circuit 2: 13.95 A
- PAM 6.8 A, 750 W (total, including lamp power supplies, MFCs, O3, RH, and SO2 monitors)
- Grimm OPC 0.18 A, 20 W
- TSI SMPS #1 6.81 A, 750 W, inc pumps
- DustTrak 0.16 A, 18 W
- Circuit 1: 13.64 A
- Shared Circuit
- Circuit 3: 12.25 A
- Gast Pump (by-pass) 5.45 A, 600 W
- TSI SMPS #2 6.81 A, 750 W, inc pumps
- Circuit 3: 12.25 A
- MAB-Concentrator Related Instruments
- Circuit 4: 14.18 A
- Soft-Ionization (MAB) HR-ToF-AMS 6.36 A, 700 W instrument; 4.55 A, 500 W pumps
- MAB Power supplies 0.53 A, 58 W
- Concentrator Electronic Box 2.74 A, 300 W (estimated)
- Circuit 5: 15.7 A
- Concentrator Chiller 10.45 A, 1150 W
- Concentrator Saturator Heating Tape 5.24 A, 576 W
- Circuit 4: 14.18 A
- Independent Instruments
- Circuit 6: 13.22 A
- C-ToF-AMS 6.36 A, 700 W instrument
- TSI Water CPC 3786 0.6 A, 66 W
- TSI DMA 0.81 A, 90 W instrument
- Gast Pump (for CPC) 5.45 A, 600 W
- Circuit 6: 13.22 A
- Note: We should request 7 circuits.(AMO 26 March 2010)
Distribution of tasks while in the field
- This is the MASTER list (not the one in Google Docs)
- Power totals (Michael) -- also power table in field, sheets for borrowing parts
- EI-AMS (Patrick, Amber)
- PAM (inc. SO2, O3, RH, MFCs) (Amber)
- Thermal Denuder (Amber -- Mike will train Jose)
- MAB-AMS (Carly)
- C-AMS (Not sure if we will operate)
- w/Light Scattering? (Not sure, depends on Eben)
- SMPS, CPC on Carly's Inlet (operated by Mike, data reduction in field Michael/Ingrid)
- SMPS, CPC on Amber's Inlet (operated by Mike, data reduction in field Michael/Ingrid)
- SMPS, CPC for calibration (operated as needed - AMS operator)
- Calibration CPC for ambient data (Mike, data reduction in field Michael/Ingrid)
- OPC (Michael w/Ingrid; igor code from Mike?)
- DustTrak w/ PM1 inlet (Michael w/ Mike)
- TAG-AMS (Mike + Jose will support operation)
- UHSAS (Ping would bring, Delphine?)
- UV-APS (Alex could send, would do data)
- Downloading data from other instruments and model, making graphs and posting them (Ingrid)
- Uploading and plotting data in real-time: Ingrid, Donna
- Support: Delphine
Logging & pumping summary
- Logging computers: [duty cycles]
- Laptop 1: LabVIEW only, PAM inlet.
- Ozone monitor [low]
- Grimm [medium]
- DustTrak [low]
- RH monitor [low]
- Laptop 2: TSI AIM, PAM & MAB
- Long-column 3010-based SMPS system (PAM)
- Long-column 3786-based SMPS system (MAB)
- Laptop 3: reserved for SO2 monitor until more info is known
- Laptop 4: LabVIEW only, PAM & MAB
- TSI flowmeter on MAB SMPS [low]
- TSI flowmeter on PAM SMPS [low]
- Can be one of the old black laptops
- Laptop 5: LabVIEW only, PAM & MAB
- Jayne switching valve system on PAM inlet [low-medium]
- Yellow switching valve system on MAB inlet [low]
- Laptop 1: LabVIEW only, PAM inlet.
- Gast lab pumps
- Pump 1: 3010 scanning
- dP >= 500mb
- 1.0 lpm
- hazmat exhaust
- Pump 2: 3010 fixed
- dP >= 500mb
- hazmat exhaust
- Pump 3: Combined bypass lines
- dP small
- 2.65 (PAM) + 0.6 (TD) + 0.2 (PAM-AMS) + 0.65 (MAB-AMS) = 4.1 lpm
- Pump 4: PAM ancillary bypass
- dP small
- up to 1.7 (DustTrak) + 1.2 (Grimm) = 2.9 lpm
- Pump 5: MAB cyclone bypass
- dP small
- 9.0-10.0 lpm
- Pump 6: Perma-Pure dryer purge flow
- dP ~ 100 mb
- 5 lpm
- 1.0 lpm
- Pump 1: 3010 scanning
Tasks for Michael at the site
- Immediately upon arrival at the site
- Check electrical connections with plug tester
- Label all the plugs in all trailers with the circuit number, if not already labeled.
- Make power budget sheet for each trailer, post prominently.
- Check all pumps with DustTrak and portable CPC (need to borrow from Suzanne Hering) as they are being installed.
- Post maps of Caltech and the local area, as well as hardware stores etc. in all trailers (next to door).
- Pick up rental car (minivan)
- Not immediately, but during the study
- Collect samples of chiller water and the chemicals added to it. Discuss that people can sample them if needed. (Bring many small vials to distribute)
- Keep on top of butanol scrubbing for our CPCs
Rental Car
- AVIS
- Confirmation: 06665063US6
- Pick up Tuesday May 4th @ 4:00 pm (close at 6pm)
- Return Friday June 18th @ 9:00 am
- 570 North Lake Ave, Pasadena, CA 91101
- Phone: 626.449.6122
- Estimated Cost: $2,130.90
Rental Truck
- Penske
- Confirmation: 23002321
- Pick up Saturday May 5th
- Return June 19
- 2560 49th St. Boulder, CO 80301
- Phone: 303.442.6481
- Estimated Cost: $2,811.67
Housing
- for 8 people (4 women, 4 men)
- final confirmation late April
- $133/night/apartment (2 apartments, 2 bedrooms each, 4 people/apartment)
- 1: 5/4-6/18
- 2: 5/8-6/18
- Confirmed Group Members: Jose L. Jimenez, Carly Robinson, Amber Ortega, Mike Cubison, Michael Lechner, Patrick Hayes, Delphine Farmer, Ingrid Ulbrich
- Requested Preferences:
- Location: City Place Apartments 801 E. Walnut St, Pasadena, CA 91101
- Amenities: Top/high floor units, facing garden/pool (not street)
- Updates: Housing Share with the Murphy Group from UToronto. J-group ladies apt will have: Carly, Amber, Ingrid, + (Sanna or Delphine until May 20) + Raluca (from May 20 onwards). The Murphy group (UToronto) will have one apartment in the same complex, with Jen + Raluca + (Sanna or Delphine) until May 20. Raluca and Amber will coordinate payment - Murphy group pay 1/4 of the J-group apt (~$33/night) for ~20 nights (30 nights in the J-group apt minus the ~10 nights Sanna or Delphine will share with the Murphy group).