Difference between revisions of "CalNex-JG"
From Jimenez Group Wiki
(→Tasks in preparation for CalNex-LA) |
|||
Line 1: | Line 1: | ||
− | |||
This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with [http://cires.colorado.edu/jimenez-group/wiki/index.php?title=CalNex-LA the Main CalNex-LA page] or the [http://cires.colorado.edu/jimenez-group/wiki/index.php?title=CalNex-LA_Logistics CalNex-LA Logistics page]. | This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with [http://cires.colorado.edu/jimenez-group/wiki/index.php?title=CalNex-LA the Main CalNex-LA page] or the [http://cires.colorado.edu/jimenez-group/wiki/index.php?title=CalNex-LA_Logistics CalNex-LA Logistics page]. | ||
Line 5: | Line 4: | ||
* Field kit | * Field kit | ||
− | ** Inlet schematic for J-Group instruments: account for all fittings+tubing a priori | + | ** broken UPS & check all UPSs: Delphine |
+ | ** CPC 3010: Mike | ||
+ | ** Orifices: Michael | ||
+ | ** DMA Column: Mike | ||
+ | |||
+ | * Organization | ||
+ | ** Which AMSs to bring: MAB-AMS + LAB-AMS | ||
+ | *** Bring HIAPER as spare AMS (keep off, start if needed -- alternative to run it from the beginning) | ||
+ | ** AMS alternation: PAM + TD: on LAB-AMS, | ||
+ | *** Ambient: 1min V, 1 min W | ||
+ | *** PAM: same | ||
+ | *** TD: same (James wants to sample off this -- Jose will check with him, can we borrow a 2nd TD) | ||
+ | *** Need to set up + test Jayne switching valves: Mike + Amber | ||
+ | *** concentrator: Sanna not sure if she can make it, she can send concentrator at least 2 weeks in advance: we will use w/ MAB (Jose will check) | ||
+ | *** Need a set of valves for concentrator: Carly | ||
+ | *** Need to be able to step vaporizer temperatures: Carly | ||
+ | *** Inlet schematic for J-Group instruments: account for all fittings+tubing a priori: Carly + Amber (Delphine or Alex will dig out MILAGRO and/or BEARPEX). Include how to test for leaks and flows. | ||
+ | ** Put together 2x valve filtering system for inlet, order valves if needed (Delphine) | ||
+ | ** Which SMPSs | ||
+ | *** One in parallel with Lab-AMS, one in parallel with MAB-AMS, one as shared calibration system (Mike + Ingrid) | ||
+ | ** PTRMS sharing for PAM: Amber will contact Martin.Graus@nooa.gov | ||
+ | ** DustTrak for sniffing: Michael already sent to TSI | ||
+ | ** OPC: | ||
+ | |||
+ | who is here | ||
+ | |||
* Driving equipment to LA | * Driving equipment to LA | ||
Line 15: | Line 39: | ||
** SMPS, CPC, OPC, DustTrak | ** SMPS, CPC, OPC, DustTrak | ||
** Downloading data from other instruments and model, making graphs and posting them | ** Downloading data from other instruments and model, making graphs and posting them | ||
+ | |||
+ | |||
+ | |||
== Tasks for Michael upon arrival at the site == | == Tasks for Michael upon arrival at the site == |
Revision as of 10:58, 17 February 2010
This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with the Main CalNex-LA page or the CalNex-LA Logistics page.
Tasks in preparation for CalNex-LA
- Field kit
- broken UPS & check all UPSs: Delphine
- CPC 3010: Mike
- Orifices: Michael
- DMA Column: Mike
- Organization
- Which AMSs to bring: MAB-AMS + LAB-AMS
- Bring HIAPER as spare AMS (keep off, start if needed -- alternative to run it from the beginning)
- AMS alternation: PAM + TD: on LAB-AMS,
- Ambient: 1min V, 1 min W
- PAM: same
- TD: same (James wants to sample off this -- Jose will check with him, can we borrow a 2nd TD)
- Need to set up + test Jayne switching valves: Mike + Amber
- concentrator: Sanna not sure if she can make it, she can send concentrator at least 2 weeks in advance: we will use w/ MAB (Jose will check)
- Need a set of valves for concentrator: Carly
- Need to be able to step vaporizer temperatures: Carly
- Inlet schematic for J-Group instruments: account for all fittings+tubing a priori: Carly + Amber (Delphine or Alex will dig out MILAGRO and/or BEARPEX). Include how to test for leaks and flows.
- Put together 2x valve filtering system for inlet, order valves if needed (Delphine)
- Which SMPSs
- One in parallel with Lab-AMS, one in parallel with MAB-AMS, one as shared calibration system (Mike + Ingrid)
- PTRMS sharing for PAM: Amber will contact Martin.Graus@nooa.gov
- DustTrak for sniffing: Michael already sent to TSI
- OPC:
- Which AMSs to bring: MAB-AMS + LAB-AMS
who is here
- Driving equipment to LA
- Distribution of tasks while in the field
- EI-AM
- PAM
- MAB-AMS
- TAG-AMS
- SMPS, CPC, OPC, DustTrak
- Downloading data from other instruments and model, making graphs and posting them
Tasks for Michael upon arrival at the site
- Check electrical connections with plug tester
- Label all the plugs in all trailers with the circuit number, if not already labeled.
- Check all pumps with DustTrak and portable CPC (need to borrow from Suzanne Hering) as they are being installed.
- Post maps of Caltech and the local area, as well as hardware stores etc. in all trailers (next to door).
Tasks for Michael during the experiment
- Keep on top of butanol scrubbing for our CPCs