(Tasks in preparation for CalNex-LA)
Line 1: Line 1:
 
 
This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with [http://cires.colorado.edu/jimenez-group/wiki/index.php?title=CalNex-LA the Main CalNex-LA page] or the [http://cires.colorado.edu/jimenez-group/wiki/index.php?title=CalNex-LA_Logistics CalNex-LA Logistics page].
 
This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with [http://cires.colorado.edu/jimenez-group/wiki/index.php?title=CalNex-LA the Main CalNex-LA page] or the [http://cires.colorado.edu/jimenez-group/wiki/index.php?title=CalNex-LA_Logistics CalNex-LA Logistics page].
  
Line 5: Line 4:
  
 
* Field kit
 
* Field kit
** Inlet schematic for J-Group instruments: account for all fittings+tubing a priori
+
** broken UPS & check all UPSs: Delphine
 +
** CPC 3010: Mike
 +
** Orifices: Michael
 +
** DMA Column: Mike
 +
 
 +
* Organization
 +
** Which AMSs to bring: MAB-AMS + LAB-AMS
 +
*** Bring HIAPER as spare AMS (keep off, start if needed -- alternative to run it from the beginning)
 +
** AMS alternation: PAM + TD: on LAB-AMS,
 +
*** Ambient: 1min V, 1 min W
 +
*** PAM: same
 +
*** TD: same (James wants to sample off this -- Jose will check with him, can we borrow a 2nd TD)
 +
*** Need to set up + test Jayne switching valves: Mike + Amber
 +
*** concentrator: Sanna not sure if she can make it, she can send concentrator at least 2 weeks in advance: we will use w/ MAB (Jose will check)
 +
*** Need a set of valves for concentrator: Carly
 +
*** Need to be able to step vaporizer temperatures: Carly
 +
*** Inlet schematic for J-Group instruments: account for all fittings+tubing a priori: Carly + Amber (Delphine or Alex will dig out MILAGRO and/or BEARPEX). Include how to test for leaks and flows.
 +
** Put together 2x valve filtering system for inlet, order valves if needed (Delphine)
 +
** Which SMPSs
 +
*** One in parallel with Lab-AMS, one in parallel with MAB-AMS, one as shared calibration system (Mike + Ingrid)
 +
** PTRMS sharing for PAM: Amber will contact Martin.Graus@nooa.gov
 +
** DustTrak for sniffing: Michael already sent to TSI
 +
** OPC:
 +
 
 +
who is here
 +
 
 
* Driving equipment to LA
 
* Driving equipment to LA
  
Line 15: Line 39:
 
** SMPS, CPC, OPC, DustTrak
 
** SMPS, CPC, OPC, DustTrak
 
** Downloading data from other instruments and model, making graphs and posting them
 
** Downloading data from other instruments and model, making graphs and posting them
 +
 +
 +
  
 
== Tasks for Michael upon arrival at the site ==
 
== Tasks for Michael upon arrival at the site ==

Revision as of 10:58, 17 February 2010

This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with the Main CalNex-LA page or the CalNex-LA Logistics page.

Tasks in preparation for CalNex-LA

  • Field kit
    • broken UPS & check all UPSs: Delphine
    • CPC 3010: Mike
    • Orifices: Michael
    • DMA Column: Mike
  • Organization
    • Which AMSs to bring: MAB-AMS + LAB-AMS
      • Bring HIAPER as spare AMS (keep off, start if needed -- alternative to run it from the beginning)
    • AMS alternation: PAM + TD: on LAB-AMS,
      • Ambient: 1min V, 1 min W
      • PAM: same
      • TD: same (James wants to sample off this -- Jose will check with him, can we borrow a 2nd TD)
      • Need to set up + test Jayne switching valves: Mike + Amber
      • concentrator: Sanna not sure if she can make it, she can send concentrator at least 2 weeks in advance: we will use w/ MAB (Jose will check)
      • Need a set of valves for concentrator: Carly
      • Need to be able to step vaporizer temperatures: Carly
      • Inlet schematic for J-Group instruments: account for all fittings+tubing a priori: Carly + Amber (Delphine or Alex will dig out MILAGRO and/or BEARPEX). Include how to test for leaks and flows.
    • Put together 2x valve filtering system for inlet, order valves if needed (Delphine)
    • Which SMPSs
      • One in parallel with Lab-AMS, one in parallel with MAB-AMS, one as shared calibration system (Mike + Ingrid)
    • PTRMS sharing for PAM: Amber will contact Martin.Graus@nooa.gov
    • DustTrak for sniffing: Michael already sent to TSI
    • OPC:

who is here

  • Driving equipment to LA
  • Distribution of tasks while in the field
    • EI-AM
    • PAM
    • MAB-AMS
    • TAG-AMS
    • SMPS, CPC, OPC, DustTrak
    • Downloading data from other instruments and model, making graphs and posting them



Tasks for Michael upon arrival at the site

  • Check electrical connections with plug tester
  • Label all the plugs in all trailers with the circuit number, if not already labeled.
  • Check all pumps with DustTrak and portable CPC (need to borrow from Suzanne Hering) as they are being installed.
  • Post maps of Caltech and the local area, as well as hardware stores etc. in all trailers (next to door).

Tasks for Michael during the experiment

  • Keep on top of butanol scrubbing for our CPCs