CalNex-JG

From Jimenez Group Wiki
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with the Main CalNex-LA page or the CalNex-LA Logistics page.

Tasks in preparation for CalNex-LA

  • Field kit
    • Inlet schematic for J-Group instruments: account for all fittings+tubing a priori
  • Driving equipment to LA
  • Distribution of tasks while in the field
    • EI-AM
    • PAM
    • MAB-AMS
    • TAG-AMS
    • SMPS, CPC, OPC, DustTrak
    • Downloading data from other instruments and model, making graphs and posting them

Tasks for Michael upon arrival at the site

  • Check electrical connections with plug tester
  • Label all the plugs in all trailers with the circuit number, if not already labeled.
  • Check all pumps with DustTrak and portable CPC (need to borrow from Suzanne Hering) as they are being installed.
  • Post maps of Caltech and the local area, as well as hardware stores etc. in all trailers (next to door).

Tasks for Michael during the experiment

  • Keep on top of butanol scrubbing for our CPCs