CalNex-JG

From Jimenez Group Wiki
Revision as of 00:32, 15 February 2010 by Jose (talk | contribs) (Created page with ' This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with [http://cires.colorado.edu/jimenez-group/wiki...')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

This page serves as documentation for organization of the Jimenez Group's participation in CalNex-LA. Do not confuse this page with the Main CalNex-LA page or the CalNex-LA Logistics page.

Tasks in preparation for CalNex-LA

  • Field kit
  • Driving equipment to LA
  • Distribution of tasks while in the field
    • EI-AM
    • PAM
    • MAB-AMS
    • TAG-AMS
    • SMPS, CPC, OPC, DustTrak
    • Downloading data from other instruments and model, making graphs and posting them

Tasks for Michael upon arrival at the site

  • Check electrical connections with plug tester
  • Label all the plugs in all trailers with the circuit number, if not already labeled.
  • Check all pumps with DustTrak and portable CPC (need to borrow from Suzanne Hering) as they are being installed.
  • Post maps of Caltech and the local area, as well as hardware stores etc. in all trailers (next to door).