Difference between revisions of "ARCTAS"

From Jimenez Group Wiki
Jump to: navigation, search
(Fairbanks Phase)
 
(55 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
The purpose of this page is to serve as a repository of schedules and information for the participation of the Jimenez group in the ARCTAS campaign.
 
The purpose of this page is to serve as a repository of schedules and information for the participation of the Jimenez group in the ARCTAS campaign.
  
Schedules should be kept in most detail here, as the group calendar is often too crowded.
+
Personnel schedule on group calendar
 +
http://www.google.com/calendar/render.
 +
 
 +
Information on Phase I (past) is below for reference. Jose moved the logistical info below the to-do list on 14-June-08.
 +
 
 +
== To-do List for ARCTAS-2 ==
 +
 
 +
<h3>Instrument - Priority 1 during CARB at Palmdale</h3>
 +
 
 +
* Prepare PCI software for PID controller
 +
* Flight 12 submission
 +
 
 +
* Fri 20-Jun 2008
 +
** Check beam position and width in pre-flight if no problems
 +
 
 +
* Discuss size cut of inlets with Jack Dibb and Rodney
 +
 
 +
* Mike's task list
 +
** Customs list
 +
** Replot timetrace of all flights on "standard format", give copy to Jose for reference)
 +
** Install all plane software on Mike's old laptop, so that his personal laptop can serve as backup for plane laptop in case of catastrophic failure, and test that it works
 +
** Start, mid-flight, and shutdown checklists
 +
** Keep measuring IE/AB over a full day (transient effects)
 +
** Make basic loss calculations (inc res time) on inlet
 +
 
 +
* Stuff we are waiting on
 +
** (Waiting for parts): Install new Omega PID controller for PCI
 +
** (Waiting for ML): Order and ship spare batteries for thermocouple in plane
 +
** (Waiting for parts): Connect exhaust of MD1 when connectors arrive from ML
 +
** (Waiting for Thomas about TPS error message: uups... / data crc / rx error: 5)
 +
** (Waiting for parts from EMCO, and also response from Bill Brooks): Connect multiplier HV supply to hard mirror, so that we can run W-mode in forest fire plumes
 +
 
 +
<h3>Second Priority</h3>
 +
* Think whether to run at higher MCP and lower emission current for forest fires (less chance of missing threshold, reduce change of saturation in fires)
 +
* Investigate how we can refill the lecture bottle (ask Eric Apel)
 +
* Connect UPS software for battery indication
 +
* Fix 12 V power supply in TPS for preamp
 +
* Get an install 2 bike cupholders
 +
 
 +
<h3>Data Analysis to-do (in approx order of priority)</h3>
 +
* Process fast data and resubmit with those
 +
* Re-generate slides from mid-campaign prez with new data
 +
* Generate PToF data:
 +
** Compare to Grimm, LARGE OPC+SMPS, SP2 OPC (>250nm) to evaluate size transmission
 +
** Evaluate whether the different slopes with light scattering are due to size distribution changes (F8)
 +
* Evaluate the O/C data from Allison
 +
* Why are filter levels for Org (maybe also NO3, m/z 16) variable (TO/landing)?
 +
** is it mz29 or 44? Quantify in TT and squirrel
 +
* Implement the time-dependent CO2 and H2O corrections for the flights (or decide that they are not needed)
 +
** We can probably measure frag_org[18] directly in this way
 +
* Use plumes to align our data to others
 +
 
 +
<h3>Post ARCTAS-2</h3>
 +
* Repeat PCI transmission experiment
 +
 
 +
<h3>For Donna (in approx order of priority)</h3>
 +
* Improve Squirreling of the Fast Mode data (F4 and/or F5)
 +
 
 +
<h3>For future campaigns</h3>
 +
* Timetrace of a few HR peaks as in flux mode?
 +
* Test and enable cell-phone filtering
 +
* Put together leak detector with V70, controller, AC MD1, and SRS or Balzers RGA
 +
* Stuff for Joel
 +
** Fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him
 +
** Gaps of 5s in fast timetrace?
 +
 
 +
<h3>Shipping Info for ARCTAS-2</h3>
 +
 
 +
Karen Richards - DC-8 ARCTAS (Attn: AMS / Jimenez)
 +
<br>Mail Stop 2332
 +
<br>NASA Dryden Flight Research Center
 +
<br>Bldg. 4876 Warehouse #6
 +
<br>Lilly Drive
 +
<br>Edwards, CA 93524
 +
<br>Phone: +1-661 212 0155
 +
 
 +
== Logistics for Summer Phase ==
 +
 
 +
<h3>Accomodations</h3>
 +
*Mike Cubison
 +
**Accomodations for June 13th thru June 26th
 +
***Courtyard in Palmdale
 +
***Confirmation: 80592634
 +
***Phone: 661.947.4100
 +
***Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
 +
***Price $118.00/night
 +
**Accomodations for June 29th
 +
***Edmonton International Airport/Leduc Travelodge Suites
 +
***Confirmation: N469HV
 +
***Price: $82.00/night
 +
***Transportation: shuttle to and from airport
 +
**Bus leaves from airport at 13:30 June 30th for Cold Lake
 +
***More Details Coming soon
 +
**Accomodations for June 30th thru July 12th
 +
***Cold Lake Base
 +
***Confirmed - Confirmed-no confirmation code
 +
***$25.00/night
 +
*Jose Jimenez
 +
**Accomodations for June 13th thru June 26th
 +
***Courtyard in Palmdale
 +
***Confirmation: 80592634
 +
***Phone: 661.947.4100
 +
***Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
 +
***Price: $118.00/night
 +
**Accomodations June 26th thru July 12th
 +
***Cold Lake Base
 +
***Confirmation - Confirmed-no confirmation code
 +
***$25.00/night
 +
**Bus leaves from Cold Lake at 6:30 and arrives at Airport at 11:30.
 +
*Donna Sueper
 +
**Accomodations June 26th thru July 6th
 +
***Cold Lake Base
 +
***Confirmation - Confirmed-no confirmation code
 +
 
 +
<h3>Transportation</h3>
 +
*Mike Cubison and Jose Jimenez
 +
**Date: June 13 thru June 14th
 +
***Company: Hertz
 +
***Location: Palmdale Airport
 +
***Confirmation Number: E0402631248
 +
***Price: 34.49 (10% disc. for CU)
 +
***Details: Have flight number so will make sure that they stay open until arrival
 +
**Date: June 14th
 +
***Company: Enterprise
 +
***Location: 445 W. Palmdale Blvd./Palmdale, CA/93551
 +
***Phone: 661.274.2585
 +
***Confirmation: Jose Jimenez
 +
***Details:  Open from 9:00am until noon on Sat. the 14th.  There is a Hertz rental car right next to enterprise.  When the Hertz car is checked out the day before let them know you will be returning it at a different location.  Otherwise you can call Enterprise for pickup at the number above.
 +
 
  
 
== Integration Phase ==
 
== Integration Phase ==
Line 8: Line 136:
  
 
*2/22:  Truck leaves Boulder with AMS and rest of kit
 
*2/22:  Truck leaves Boulder with AMS and rest of kit
*2/29:  Truck arrives in Palmdale, Mike flies out
+
*2/29:  Truck arrives in Palmdale,  
 +
*3/4: AMS onto plane
 +
*3/12: Power Check
 +
*3/17: Safety Brief
 +
*3/18-20: Test Flights
 +
*4/1: Transit to AK
  
*3/2:    Ed travels to Palmdale (+Jose?)
 
*<b>3/4:    AMS goes onto the plane</b>
 
*3/7: Integration should be finished 
 
*<b>3/12:    Power check</b> - Mike will attend
 
*<b>3/17:    Safety Brief</b> - Mike, Jose
 
*<b>3/18-3/21:    Test Flights</b> - Mike, Jose
 
*3/22: Mike + Jose travel back to Boulder
 
*<b>3/23-3/29:    No access</b>
 
*<b>3/30-3/31:    Packing plane</b> - Mike flies out to Palmdale 3/30
 
*1/4:    DC-8 transit to AK - Mike
 
 
 
Unfortunately the power check is right between our integration date and the test flights, so Mike will either 1) stay on after integ, 2) stay from power check to test flights, or 3) fly out for the day.
 
  
 
== Fairbanks Phase ==
 
== Fairbanks Phase ==
Line 29: Line 149:
 
* 4/1 Jose travels to AK
 
* 4/1 Jose travels to AK
 
* <b>4/4 Anticipated first science flight</b>
 
* <b>4/4 Anticipated first science flight</b>
* 4/7 Ed flies to AK in dual role
+
* 4/21 <b>DC-8 transit to Palmdale</b> - Mike.  
* 4/11 Jose travels back to CO
 
* <b>4/12 Last Thule deployment arrives back in Fairbanks</b>, Joel travels to AK
 
* 4/23 <b>DC-8 transit to Palmdale</b> - Mike. Joel travels back to CO
 
 
* 4/24 Mike travels back to CO
 
* 4/24 Mike travels back to CO
  
 
<h3>Hotel for J-Group</h3>
 
<h3>Hotel for J-Group</h3>
 
+
*Company: Sophie's Station
== Summer Phase ==
+
*Phone: 1-800-528-4916
 
+
*Dates: April 1st - April 21st
Details to go here.
+
*Name on Reservation: Jose Jimenez & Mike Cubison
 +
*Confirmation Number: 2733120
 +
*Total: $75.00/ night to be paid on-site
 +
*Details: 24 hour cancellation

Latest revision as of 17:29, 19 June 2008

The purpose of this page is to serve as a repository of schedules and information for the participation of the Jimenez group in the ARCTAS campaign.

Personnel schedule on group calendar http://www.google.com/calendar/render.

Information on Phase I (past) is below for reference. Jose moved the logistical info below the to-do list on 14-June-08.

To-do List for ARCTAS-2

Instrument - Priority 1 during CARB at Palmdale

  • Prepare PCI software for PID controller
  • Flight 12 submission
  • Fri 20-Jun 2008
    • Check beam position and width in pre-flight if no problems
  • Discuss size cut of inlets with Jack Dibb and Rodney
  • Mike's task list
    • Customs list
    • Replot timetrace of all flights on "standard format", give copy to Jose for reference)
    • Install all plane software on Mike's old laptop, so that his personal laptop can serve as backup for plane laptop in case of catastrophic failure, and test that it works
    • Start, mid-flight, and shutdown checklists
    • Keep measuring IE/AB over a full day (transient effects)
    • Make basic loss calculations (inc res time) on inlet
  • Stuff we are waiting on
    • (Waiting for parts): Install new Omega PID controller for PCI
    • (Waiting for ML): Order and ship spare batteries for thermocouple in plane
    • (Waiting for parts): Connect exhaust of MD1 when connectors arrive from ML
    • (Waiting for Thomas about TPS error message: uups... / data crc / rx error: 5)
    • (Waiting for parts from EMCO, and also response from Bill Brooks): Connect multiplier HV supply to hard mirror, so that we can run W-mode in forest fire plumes

Second Priority

  • Think whether to run at higher MCP and lower emission current for forest fires (less chance of missing threshold, reduce change of saturation in fires)
  • Investigate how we can refill the lecture bottle (ask Eric Apel)
  • Connect UPS software for battery indication
  • Fix 12 V power supply in TPS for preamp
  • Get an install 2 bike cupholders

Data Analysis to-do (in approx order of priority)

  • Process fast data and resubmit with those
  • Re-generate slides from mid-campaign prez with new data
  • Generate PToF data:
    • Compare to Grimm, LARGE OPC+SMPS, SP2 OPC (>250nm) to evaluate size transmission
    • Evaluate whether the different slopes with light scattering are due to size distribution changes (F8)
  • Evaluate the O/C data from Allison
  • Why are filter levels for Org (maybe also NO3, m/z 16) variable (TO/landing)?
    • is it mz29 or 44? Quantify in TT and squirrel
  • Implement the time-dependent CO2 and H2O corrections for the flights (or decide that they are not needed)
    • We can probably measure frag_org[18] directly in this way
  • Use plumes to align our data to others

Post ARCTAS-2

  • Repeat PCI transmission experiment

For Donna (in approx order of priority)

  • Improve Squirreling of the Fast Mode data (F4 and/or F5)

For future campaigns

  • Timetrace of a few HR peaks as in flux mode?
  • Test and enable cell-phone filtering
  • Put together leak detector with V70, controller, AC MD1, and SRS or Balzers RGA
  • Stuff for Joel
    • Fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him
    • Gaps of 5s in fast timetrace?

Shipping Info for ARCTAS-2

Karen Richards - DC-8 ARCTAS (Attn: AMS / Jimenez)
Mail Stop 2332
NASA Dryden Flight Research Center
Bldg. 4876 Warehouse #6
Lilly Drive
Edwards, CA 93524
Phone: +1-661 212 0155

Logistics for Summer Phase

Accomodations

  • Mike Cubison
    • Accomodations for June 13th thru June 26th
      • Courtyard in Palmdale
      • Confirmation: 80592634
      • Phone: 661.947.4100
      • Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
      • Price $118.00/night
    • Accomodations for June 29th
      • Edmonton International Airport/Leduc Travelodge Suites
      • Confirmation: N469HV
      • Price: $82.00/night
      • Transportation: shuttle to and from airport
    • Bus leaves from airport at 13:30 June 30th for Cold Lake
      • More Details Coming soon
    • Accomodations for June 30th thru July 12th
      • Cold Lake Base
      • Confirmed - Confirmed-no confirmation code
      • $25.00/night
  • Jose Jimenez
    • Accomodations for June 13th thru June 26th
      • Courtyard in Palmdale
      • Confirmation: 80592634
      • Phone: 661.947.4100
      • Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
      • Price: $118.00/night
    • Accomodations June 26th thru July 12th
      • Cold Lake Base
      • Confirmation - Confirmed-no confirmation code
      • $25.00/night
    • Bus leaves from Cold Lake at 6:30 and arrives at Airport at 11:30.
  • Donna Sueper
    • Accomodations June 26th thru July 6th
      • Cold Lake Base
      • Confirmation - Confirmed-no confirmation code

Transportation

  • Mike Cubison and Jose Jimenez
    • Date: June 13 thru June 14th
      • Company: Hertz
      • Location: Palmdale Airport
      • Confirmation Number: E0402631248
      • Price: 34.49 (10% disc. for CU)
      • Details: Have flight number so will make sure that they stay open until arrival
    • Date: June 14th
      • Company: Enterprise
      • Location: 445 W. Palmdale Blvd./Palmdale, CA/93551
      • Phone: 661.274.2585
      • Confirmation: Jose Jimenez
      • Details: Open from 9:00am until noon on Sat. the 14th. There is a Hertz rental car right next to enterprise. When the Hertz car is checked out the day before let them know you will be returning it at a different location. Otherwise you can call Enterprise for pickup at the number above.


Integration Phase

(inclusive dates):

  • 2/22: Truck leaves Boulder with AMS and rest of kit
  • 2/29: Truck arrives in Palmdale,
  • 3/4: AMS onto plane
  • 3/12: Power Check
  • 3/17: Safety Brief
  • 3/18-20: Test Flights
  • 4/1: Transit to AK


Fairbanks Phase

Timeline

  • 4/1 Jose travels to AK
  • 4/4 Anticipated first science flight
  • 4/21 DC-8 transit to Palmdale - Mike.
  • 4/24 Mike travels back to CO

Hotel for J-Group

  • Company: Sophie's Station
  • Phone: 1-800-528-4916
  • Dates: April 1st - April 21st
  • Name on Reservation: Jose Jimenez & Mike Cubison
  • Confirmation Number: 2733120
  • Total: $75.00/ night to be paid on-site
  • Details: 24 hour cancellation