Difference between revisions of "ARCTAS"

From Jimenez Group Wiki
Jump to: navigation, search
(To-do List for ARCTAS)
 
(24 intermediate revisions by 3 users not shown)
Line 4: Line 4:
 
http://www.google.com/calendar/render.  
 
http://www.google.com/calendar/render.  
  
Information on Phase I (past) is below for reference.
+
Information on Phase I (past) is below for reference. Jose moved the logistical info below the to-do list on 14-June-08.
  
 +
== To-do List for ARCTAS-2 ==
  
 +
<h3>Instrument - Priority 1 during CARB at Palmdale</h3>
  
== Summer Phase ==
+
* Prepare PCI software for PID controller
 +
* Flight 12 submission
 +
 
 +
* Fri 20-Jun 2008
 +
** Check beam position and width in pre-flight if no problems
 +
 
 +
* Discuss size cut of inlets with Jack Dibb and Rodney
 +
 
 +
* Mike's task list
 +
** Customs list
 +
** Replot timetrace of all flights on "standard format", give copy to Jose for reference)
 +
** Install all plane software on Mike's old laptop, so that his personal laptop can serve as backup for plane laptop in case of catastrophic failure, and test that it works
 +
** Start, mid-flight, and shutdown checklists
 +
** Keep measuring IE/AB over a full day (transient effects)
 +
** Make basic loss calculations (inc res time) on inlet
 +
 
 +
* Stuff we are waiting on
 +
** (Waiting for parts): Install new Omega PID controller for PCI
 +
** (Waiting for ML): Order and ship spare batteries for thermocouple in plane
 +
** (Waiting for parts): Connect exhaust of MD1 when connectors arrive from ML
 +
** (Waiting for Thomas about TPS error message: uups... / data crc / rx error: 5)
 +
** (Waiting for parts from EMCO, and also response from Bill Brooks): Connect multiplier HV supply to hard mirror, so that we can run W-mode in forest fire plumes
 +
 
 +
<h3>Second Priority</h3>
 +
* Think whether to run at higher MCP and lower emission current for forest fires (less chance of missing threshold, reduce change of saturation in fires)
 +
* Investigate how we can refill the lecture bottle (ask Eric Apel)
 +
* Connect UPS software for battery indication
 +
* Fix 12 V power supply in TPS for preamp
 +
* Get an install 2 bike cupholders
 +
 
 +
<h3>Data Analysis to-do (in approx order of priority)</h3>
 +
* Process fast data and resubmit with those
 +
* Re-generate slides from mid-campaign prez with new data
 +
* Generate PToF data:
 +
** Compare to Grimm, LARGE OPC+SMPS, SP2 OPC (>250nm) to evaluate size transmission
 +
** Evaluate whether the different slopes with light scattering are due to size distribution changes (F8)
 +
* Evaluate the O/C data from Allison
 +
* Why are filter levels for Org (maybe also NO3, m/z 16) variable (TO/landing)?
 +
** is it mz29 or 44? Quantify in TT and squirrel
 +
* Implement the time-dependent CO2 and H2O corrections for the flights (or decide that they are not needed)
 +
** We can probably measure frag_org[18] directly in this way
 +
* Use plumes to align our data to others
 +
 
 +
<h3>Post ARCTAS-2</h3>
 +
* Repeat PCI transmission experiment
 +
 
 +
<h3>For Donna (in approx order of priority)</h3>
 +
* Improve Squirreling of the Fast Mode data (F4 and/or F5)
 +
 
 +
<h3>For future campaigns</h3>
 +
* Timetrace of a few HR peaks as in flux mode?
 +
* Test and enable cell-phone filtering
 +
* Put together leak detector with V70, controller, AC MD1, and SRS or Balzers RGA
 +
* Stuff for Joel
 +
** Fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him
 +
** Gaps of 5s in fast timetrace?
 +
 
 +
<h3>Shipping Info for ARCTAS-2</h3>
 +
 
 +
Karen Richards - DC-8 ARCTAS (Attn: AMS / Jimenez)
 +
<br>Mail Stop 2332
 +
<br>NASA Dryden Flight Research Center
 +
<br>Bldg. 4876 Warehouse #6
 +
<br>Lilly Drive
 +
<br>Edwards, CA 93524
 +
<br>Phone: +1-661 212 0155
 +
 
 +
== Logistics for Summer Phase ==
  
 
<h3>Accomodations</h3>
 
<h3>Accomodations</h3>
Line 17: Line 86:
 
***Phone: 661.947.4100
 
***Phone: 661.947.4100
 
***Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
 
***Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
 +
***Price $118.00/night
 
**Accomodations for June 29th
 
**Accomodations for June 29th
 
***Edmonton International Airport/Leduc Travelodge Suites
 
***Edmonton International Airport/Leduc Travelodge Suites
 
***Confirmation: N469HV
 
***Confirmation: N469HV
***Price: $82.00
+
***Price: $82.00/night
 
***Transportation: shuttle to and from airport
 
***Transportation: shuttle to and from airport
 
**Bus leaves from airport at 13:30 June 30th for Cold Lake
 
**Bus leaves from airport at 13:30 June 30th for Cold Lake
Line 26: Line 96:
 
**Accomodations for June 30th thru July 12th
 
**Accomodations for June 30th thru July 12th
 
***Cold Lake Base
 
***Cold Lake Base
***More Details Coming soon<br>
+
***Confirmed - Confirmed-no confirmation code
 +
***$25.00/night
 
*Jose Jimenez
 
*Jose Jimenez
 
**Accomodations for June 13th thru June 26th
 
**Accomodations for June 13th thru June 26th
Line 33: Line 104:
 
***Phone: 661.947.4100
 
***Phone: 661.947.4100
 
***Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
 
***Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
 +
***Price: $118.00/night
 
**Accomodations June 26th thru July 12th
 
**Accomodations June 26th thru July 12th
 
***Cold Lake Base
 
***Cold Lake Base
***More Details Coming soon
+
***Confirmation - Confirmed-no confirmation code
 +
***$25.00/night
 
**Bus leaves from Cold Lake at 6:30 and arrives at Airport at 11:30.
 
**Bus leaves from Cold Lake at 6:30 and arrives at Airport at 11:30.
***More Details Coming soon<br>
 
 
*Donna Sueper
 
*Donna Sueper
 
**Accomodations June 26th thru July 6th
 
**Accomodations June 26th thru July 6th
 
***Cold Lake Base
 
***Cold Lake Base
***More Details Coming soon
+
***Confirmation - Confirmed-no confirmation code
 
 
 
 
== To-do List for ARCTAS ==
 
 
 
<h3>Immediate logistics/parts</h3>
 
* Make basic loss calculations on inlet
 
* (Buy new MD1)
 
** test new pump in lab with needle valve for max obtainable flow
 
* Check we have enough MCPs (2 sets)
 
* Find 3rd TSI flowmeter
 
* 300um orifice lead time (ML)
 
 
 
<h3>Data Analysis before summer (in approx order of priority)</h3>
 
* Polish and send slides - b4 May 12th
 
* Process fast data (Donna?) and resubmit with those
 
* Generate PToF data:
 
** Compare to Grimm, LARGE OPC+SMPS, SP2 OPC (>250nm) to evaluate size transmission
 
** Evaluate whether the different slopes with light scattering are due to size distribution changes (F8)
 
 
 
<h3>Data analysis before summer, pending enough time</h3>
 
* Evaluate the O/C data from Allison
 
* Why are filter levels for Org (maybe also NO3, m/z 16) variable (TO/landing)?
 
** is it mz29 or 44? Quantify in TT and squirrel
 
* Implement the time-dependent CO2 and H2O corrections for the flights (or decide that they are not needed)
 
** We can probably measure frag_org[18] directly in this way
 
* Use plumes to align our data to others
 
 
 
<h3>Post ARCTAS-2</h3>
 
* Repeat PCI transmission experiment
 
 
 
<h3>For Donna (in approx order of priority)</h3>
 
* Improve Squirreling of the Fast Mode data (F4 and/or F5)
 
 
 
<h3>For Mike on non-immediate timescale, but before summer</h3>
 
* Backup all plane software (incl LabVIEW,TD) on FTP site (including menus and .set files)
 
* (Document inlet geometry and lengths), calculate residence time
 
* Replot timetrace of all flights on "standard format", give copy to Jose for reference)
 
* Install all plane software on Mike's laptop, so that his personal laptop can serve as backup for plane laptop in case of catastrophic failure, and test that it works
 
* Start, mid-flight, and shutdown checklists
 
* Check existing Igor code for offloading Grimm data (to intercompare the Grimm immediately after a flight)
 
* Get BWP off c-ToF or JJ and test it (out of vac) to verify correct software operation
 
 
 
<h3>Instrument - Critical pre-CARB at Palmdale</h3>
 
* Install MCP
 
* Install MD1
 
** Increase bypass flow on inlet line (now limited to ~2.5 lpm)
 
** Change our inlet line to 3/8" to allow more flow if possible
 
** If we can afford the pumping, replumb the Grimm to sample through a critical orifice
 
** install TSI flowmeter on this pumping line (filter ahead), log flow
 
* Install new Omega PID controller
 
 
 
<h3>Instrument - If enough time at Palmdale</h3>
 
* Measure IE/AB over a full day (transient effects)
 
* Fix 12 V power supply in TPS for preamp
 
* Install HV supply for hard mirrow, so that we can run W-mode in forest fire plumes
 
* (Waiting for Thomas about TPS error message: uups... / data crc / rx error: 5)
 
* Get soldering iron with a finer tip
 
* Connect UPS software for battery indication
 
* Make sure we have a spare battery for thermocouple in plane
 
* Get an install 2 bike cupholders
 
 
 
<h3>Before Summer Campaign</h3>
 
* Be ready to submit data 48 hrs after each flight (24 better if possible)
 
* Think whether to run at higher MCP and lower emission current for forest fires (less chance of missing threshold, reduce change of saturation in fires)
 
* Stuff for Joel
 
** Fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him
 
** Gaps of 5s in fast timetrace?
 
** Timetrace of a few HR peaks as in flux mode?
 
** Test and enable cell-phone filtering
 
* See if we can buy/lease a spare TPS from Tofwerk
 
* Bring spare laptop with everything installed, test that everything works, keep in plane
 
* Have MichaelL ship He lecture bottle just before CARB
 
* Investigate how we can refill the lecture bottle (ask Eric Apel)
 
* Ask John whether AC-powered MD1 could run AMS (as backup?)
 
* Put together leak detector with V70, controller, AC MD1, and SRS or Balzers RGA
 
* Get more white HEPA filters
 
 
 
  
 +
<h3>Transportation</h3>
 +
*Mike Cubison and Jose Jimenez
 +
**Date: June 13 thru June 14th
 +
***Company: Hertz
 +
***Location: Palmdale Airport
 +
***Confirmation Number: E0402631248
 +
***Price: 34.49 (10% disc. for CU)
 +
***Details: Have flight number so will make sure that they stay open until arrival
 +
**Date: June 14th
 +
***Company: Enterprise
 +
***Location: 445 W. Palmdale Blvd./Palmdale, CA/93551
 +
***Phone: 661.274.2585
 +
***Confirmation: Jose Jimenez
 +
***Details:  Open from 9:00am until noon on Sat. the 14th.  There is a Hertz rental car right next to enterprise.  When the Hertz car is checked out the day before let them know you will be returning it at a different location.  Otherwise you can call Enterprise for pickup at the number above.
  
  

Latest revision as of 17:29, 19 June 2008

The purpose of this page is to serve as a repository of schedules and information for the participation of the Jimenez group in the ARCTAS campaign.

Personnel schedule on group calendar http://www.google.com/calendar/render.

Information on Phase I (past) is below for reference. Jose moved the logistical info below the to-do list on 14-June-08.

To-do List for ARCTAS-2

Instrument - Priority 1 during CARB at Palmdale

  • Prepare PCI software for PID controller
  • Flight 12 submission
  • Fri 20-Jun 2008
    • Check beam position and width in pre-flight if no problems
  • Discuss size cut of inlets with Jack Dibb and Rodney
  • Mike's task list
    • Customs list
    • Replot timetrace of all flights on "standard format", give copy to Jose for reference)
    • Install all plane software on Mike's old laptop, so that his personal laptop can serve as backup for plane laptop in case of catastrophic failure, and test that it works
    • Start, mid-flight, and shutdown checklists
    • Keep measuring IE/AB over a full day (transient effects)
    • Make basic loss calculations (inc res time) on inlet
  • Stuff we are waiting on
    • (Waiting for parts): Install new Omega PID controller for PCI
    • (Waiting for ML): Order and ship spare batteries for thermocouple in plane
    • (Waiting for parts): Connect exhaust of MD1 when connectors arrive from ML
    • (Waiting for Thomas about TPS error message: uups... / data crc / rx error: 5)
    • (Waiting for parts from EMCO, and also response from Bill Brooks): Connect multiplier HV supply to hard mirror, so that we can run W-mode in forest fire plumes

Second Priority

  • Think whether to run at higher MCP and lower emission current for forest fires (less chance of missing threshold, reduce change of saturation in fires)
  • Investigate how we can refill the lecture bottle (ask Eric Apel)
  • Connect UPS software for battery indication
  • Fix 12 V power supply in TPS for preamp
  • Get an install 2 bike cupholders

Data Analysis to-do (in approx order of priority)

  • Process fast data and resubmit with those
  • Re-generate slides from mid-campaign prez with new data
  • Generate PToF data:
    • Compare to Grimm, LARGE OPC+SMPS, SP2 OPC (>250nm) to evaluate size transmission
    • Evaluate whether the different slopes with light scattering are due to size distribution changes (F8)
  • Evaluate the O/C data from Allison
  • Why are filter levels for Org (maybe also NO3, m/z 16) variable (TO/landing)?
    • is it mz29 or 44? Quantify in TT and squirrel
  • Implement the time-dependent CO2 and H2O corrections for the flights (or decide that they are not needed)
    • We can probably measure frag_org[18] directly in this way
  • Use plumes to align our data to others

Post ARCTAS-2

  • Repeat PCI transmission experiment

For Donna (in approx order of priority)

  • Improve Squirreling of the Fast Mode data (F4 and/or F5)

For future campaigns

  • Timetrace of a few HR peaks as in flux mode?
  • Test and enable cell-phone filtering
  • Put together leak detector with V70, controller, AC MD1, and SRS or Balzers RGA
  • Stuff for Joel
    • Fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him
    • Gaps of 5s in fast timetrace?

Shipping Info for ARCTAS-2

Karen Richards - DC-8 ARCTAS (Attn: AMS / Jimenez)
Mail Stop 2332
NASA Dryden Flight Research Center
Bldg. 4876 Warehouse #6
Lilly Drive
Edwards, CA 93524
Phone: +1-661 212 0155

Logistics for Summer Phase

Accomodations

  • Mike Cubison
    • Accomodations for June 13th thru June 26th
      • Courtyard in Palmdale
      • Confirmation: 80592634
      • Phone: 661.947.4100
      • Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
      • Price $118.00/night
    • Accomodations for June 29th
      • Edmonton International Airport/Leduc Travelodge Suites
      • Confirmation: N469HV
      • Price: $82.00/night
      • Transportation: shuttle to and from airport
    • Bus leaves from airport at 13:30 June 30th for Cold Lake
      • More Details Coming soon
    • Accomodations for June 30th thru July 12th
      • Cold Lake Base
      • Confirmed - Confirmed-no confirmation code
      • $25.00/night
  • Jose Jimenez
    • Accomodations for June 13th thru June 26th
      • Courtyard in Palmdale
      • Confirmation: 80592634
      • Phone: 661.947.4100
      • Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
      • Price: $118.00/night
    • Accomodations June 26th thru July 12th
      • Cold Lake Base
      • Confirmation - Confirmed-no confirmation code
      • $25.00/night
    • Bus leaves from Cold Lake at 6:30 and arrives at Airport at 11:30.
  • Donna Sueper
    • Accomodations June 26th thru July 6th
      • Cold Lake Base
      • Confirmation - Confirmed-no confirmation code

Transportation

  • Mike Cubison and Jose Jimenez
    • Date: June 13 thru June 14th
      • Company: Hertz
      • Location: Palmdale Airport
      • Confirmation Number: E0402631248
      • Price: 34.49 (10% disc. for CU)
      • Details: Have flight number so will make sure that they stay open until arrival
    • Date: June 14th
      • Company: Enterprise
      • Location: 445 W. Palmdale Blvd./Palmdale, CA/93551
      • Phone: 661.274.2585
      • Confirmation: Jose Jimenez
      • Details: Open from 9:00am until noon on Sat. the 14th. There is a Hertz rental car right next to enterprise. When the Hertz car is checked out the day before let them know you will be returning it at a different location. Otherwise you can call Enterprise for pickup at the number above.


Integration Phase

(inclusive dates):

  • 2/22: Truck leaves Boulder with AMS and rest of kit
  • 2/29: Truck arrives in Palmdale,
  • 3/4: AMS onto plane
  • 3/12: Power Check
  • 3/17: Safety Brief
  • 3/18-20: Test Flights
  • 4/1: Transit to AK


Fairbanks Phase

Timeline

  • 4/1 Jose travels to AK
  • 4/4 Anticipated first science flight
  • 4/21 DC-8 transit to Palmdale - Mike.
  • 4/24 Mike travels back to CO

Hotel for J-Group

  • Company: Sophie's Station
  • Phone: 1-800-528-4916
  • Dates: April 1st - April 21st
  • Name on Reservation: Jose Jimenez & Mike Cubison
  • Confirmation Number: 2733120
  • Total: $75.00/ night to be paid on-site
  • Details: 24 hour cancellation