*2/22:  Truck leaves Boulder with AMS and rest of kit
 
*2/22:  Truck leaves Boulder with AMS and rest of kit
*2/29:  Truck arrives in Palmdale, Mike flies out
+
*2/29:  Truck arrives in Palmdale,  
 +
*3/4: AMS onto plane
 +
*3/12: Power Check
 +
*3/17: Safety Brief
 +
*3/18-20: Test Flights
 +
*4/1: Transit to AK
  
*3/2:    Ed travels to Palmdale (+Jose?)
+
Personnel schedule on group calendar
*<b>3/4:     AMS goes onto the plane</b>
+
http://www.google.com/calendar/render
*3/7: Integration should be finished 
 
*<b>3/12:    Power check</b> - Mike will attend
 
*<b>3/17:    Safety Brief</b> - Mike, Jose
 
*<b>3/18-3/21:    Test Flights</b> - Mike, Jose
 
*3/22: Mike + Jose travel back to Boulder
 
*<b>3/23-3/29:    No access</b>
 
*<b>3/30-3/31:    Packing plane</b> - Mike flies out to Palmdale 3/30
 
*1/4:    DC-8 transit to AK - Mike
 
 
 
 
 
Unfortunately the power check is right between our integration date and the test flights, so Mike will either 1) stay on after integ, 2) stay from power check to test flights, or 3) fly out for the day.
 
  
 
== Fairbanks Phase ==
 
== Fairbanks Phase ==

Revision as of 11:03, 13 February 2008

The purpose of this page is to serve as a repository of schedules and information for the participation of the Jimenez group in the ARCTAS campaign.

Schedules should be kept in most detail here, as the group calendar is often too crowded.

Integration Phase

(inclusive dates):

  • 2/22: Truck leaves Boulder with AMS and rest of kit
  • 2/29: Truck arrives in Palmdale,
  • 3/4: AMS onto plane
  • 3/12: Power Check
  • 3/17: Safety Brief
  • 3/18-20: Test Flights
  • 4/1: Transit to AK

Personnel schedule on group calendar http://www.google.com/calendar/render

Fairbanks Phase

Timeline

  • 4/1 Jose travels to AK
  • 4/4 Anticipated first science flight
  • 4/7 Ed flies to AK in dual role
  • 4/11 Jose travels back to CO
  • 4/12 Last Thule deployment arrives back in Fairbanks, Joel travels to AK
  • 4/23 DC-8 transit to Palmdale - Mike. Joel travels back to CO
  • 4/24 Mike travels back to CO

Hotel for J-Group

  • Company: Sophie's Station
  • Phone: 1-800-528-4916
  • Dates: April 1st - April 21st
  • Name on Reservation: Jose Jimenez & Mike Cubison
  • Confirmation Number: 2733120
  • Total: $75.00/ night to be paid on-site
  • Details: 24 hour cancellation

Transportation for J-Group

  • Company: Avis
  • Phone: 1-800-331-1212
  • Dates: April 1st - April 21st
  • Pickup: at Fairbank Airport
  • Name on Reservation: Jose Jimenez
  • Confirmation Number: 24109077US6
  • Total: $712.98 to be paid on-site (taxes, fees, and unlimited miles included)


Summer Phase

Details to go here.