== To-do List for ARCTAS ==
 
== To-do List for ARCTAS ==
  
Instrument - High priority
+
<h3>Instrument - High priority</h3>
 
* Install and test XChat in plane laptop and our computers
 
* Install and test XChat in plane laptop and our computers
 
* Check MIRAGE timing parameters, test averaging time and duty cycle
 
* Check MIRAGE timing parameters, test averaging time and duty cycle
Line 81: Line 81:
 
* Ask Thomas about TPS error message: uups... / data crc / rx error: 5)
 
* Ask Thomas about TPS error message: uups... / data crc / rx error: 5)
  
Instrument - medium priority
+
<h3>Instrument - medium priority</h3>
 
* Get an install 2 bike cupholders
 
* Get an install 2 bike cupholders
 
* Get soldering iron with a finer tip
 
* Get soldering iron with a finer tip
Line 87: Line 87:
 
* Backup all plane software on FTP site (including menus and .set files)
 
* Backup all plane software on FTP site (including menus and .set files)
  
Data analysis - high priority
+
<h3>Data analysis - high priority</h3>
 
* Work up and submit F5, F6, F7
 
* Work up and submit F5, F6, F7
 
* Evaluate whether the different slopes with light scattering are due to size distribution changes
 
* Evaluate whether the different slopes with light scattering are due to size distribution changes
Line 95: Line 95:
 
* Compare AMS size distributions with OPC / SMPS, to evaluate size transmission
 
* Compare AMS size distributions with OPC / SMPS, to evaluate size transmission
  
Data analysis - medium priority
+
<h3>Data analysis - medium priority</h3>
 
* Eventually: work up and submit T1 & T2 (intercompare with others before)
 
* Eventually: work up and submit T1 & T2 (intercompare with others before)
 
* Filter levels for Org (maybe also NO3, m/z 16) are variable in timetrace, check whether also in Squirrel and if so why)
 
* Filter levels for Org (maybe also NO3, m/z 16) are variable in timetrace, check whether also in Squirrel and if so why)
Line 102: Line 102:
 
* Use plumes to align our data to others
 
* Use plumes to align our data to others
  
 
+
<h3>Before Summer Campaign</h3>
 
 
Before Summer Campaign
 
 
* Bring 2 sets of 2 MCPs, change them before test flight (2nd set is spare)
 
* Bring 2 sets of 2 MCPs, change them before test flight (2nd set is spare)
 
* Joel: fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him
 
* Joel: fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him
Line 118: Line 116:
 
* See if we can buy/lease a spare TPS from Tofwerk
 
* See if we can buy/lease a spare TPS from Tofwerk
 
* Bring spare laptop with everything installed, test that everything works, keep in plane
 
* Bring spare laptop with everything installed, test that everything works, keep in plane
 +
* Joel: test and enable cell-phone filtering

Revision as of 12:42, 11 April 2008

The purpose of this page is to serve as a repository of schedules and information for the participation of the Jimenez group in the ARCTAS campaign.

Schedules should be kept in most detail here, as the group calendar is often too crowded.

Integration Phase

(inclusive dates):

  • 2/22: Truck leaves Boulder with AMS and rest of kit
  • 2/29: Truck arrives in Palmdale,
  • 3/4: AMS onto plane
  • 3/12: Power Check
  • 3/17: Safety Brief
  • 3/18-20: Test Flights
  • 4/1: Transit to AK

Personnel schedule on group calendar http://www.google.com/calendar/render

Hotel for Palmdale

TBD, Michael L is looking into it

Fairbanks Phase

Timeline

  • 4/1 Jose travels to AK
  • 4/4 Anticipated first science flight
  • 4/7 Ed flies to AK in dual role
  • 4/11 Jose travels back to CO
  • 4/12 Last Thule deployment arrives back in Fairbanks, Joel travels to AK
  • 4/23 DC-8 transit to Palmdale - Mike. Joel travels back to CO
  • 4/24 Mike travels back to CO

Hotel for J-Group

  • Company: Sophie's Station
  • Phone: 1-800-528-4916
  • Dates: April 1st - April 21st
  • Name on Reservation: Jose Jimenez & Mike Cubison
  • Confirmation Number: 2733120
  • Total: $75.00/ night to be paid on-site
  • Details: 24 hour cancellation

Transportation for J-Group

  • Company: Avis
  • Phone: 1-800-331-1212
  • Dates: April 1st - April 21st
  • Pickup: at Fairbank Airport
  • Name on Reservation: Jose Jimenez
  • Confirmation Number: 24109077US6
  • Total: $712.98 to be paid on-site (taxes, fees, and unlimited miles included)


Summer Phase

Details to go here.

To-do List for ARCTAS

Instrument - High priority

  • Install and test XChat in plane laptop and our computers
  • Check MIRAGE timing parameters, test averaging time and duty cycle
  • Computer control of TD valves
    • Test that AMS responds to TD as expected in the ground
  • Install KML for Google Earth
  • Note to do bitwise at end of each flight
  • Check Grimm internal filter, may be clogged
  • Install Office in Laptop to be able to take PPT screenshots
  • Test whether we can increase bypass with needle valve on main line
  • Put source code for this DAQ version in the plane
  • Log TSI flowmeter
  • Replumb the Grimm to sample through a critical orifice (can we afford the pumping?)
    • install TSI flowmeter on this pumping line (filter ahead), log flow
  • Bring and keep blue filter in plane
  • Write labels with usual parameters (VB, pumps, PID of PCI...)
  • Start and shutdown checklists
  • Install additional fan on pump #2?
  • Jose: read again bitwise instructions and poster
  • Keep adding plane data to timetrace
  • Install all plane software on Mike's laptop, so that his personal laptop can serve as backup for plane laptop in case of catastrophic failure
  • Ask Thomas about TPS error message: uups... / data crc / rx error: 5)

Instrument - medium priority

  • Get an install 2 bike cupholders
  • Get soldering iron with a finer tip
  • Connect UPS software for battery indication
  • Backup all plane software on FTP site (including menus and .set files)

Data analysis - high priority

  • Work up and submit F5, F6, F7
  • Evaluate whether the different slopes with light scattering are due to size distribution changes
  • Check DLs for Br, Hg
  • Analyze high Br periods in F6
  • Compare the Grimm OPC with the LARGE OPC and the SP2 OPC for periods of valid Grimm
  • Compare AMS size distributions with OPC / SMPS, to evaluate size transmission

Data analysis - medium priority

  • Eventually: work up and submit T1 & T2 (intercompare with others before)
  • Filter levels for Org (maybe also NO3, m/z 16) are variable in timetrace, check whether also in Squirrel and if so why)
  • Implement the time-dependent CO2 and H2O corrections for the flights
    • We can probably measure frag_org[18] directly in this way
  • Use plumes to align our data to others

Before Summer Campaign

  • Bring 2 sets of 2 MCPs, change them before test flight (2nd set is spare)
  • Joel: fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him
  • Be ready to submit data 48 hrs after each flight (24 better if possible)
  • Fix 12 V power supply in TPS for preamp
  • Install HV supply for hard mirrow, so that we can run W-mode in forest fire plumes
  • Be ready to intercompare the Grimm immediately after a flight
  • Think whether to run at higher MCP and lower emission current for forest fires (less chance of missing threshold, reduce change of saturation in fires)
  • Joel: gaps of 5s in fast timetrace?
  • Joel: problem with making servo position > 70
  • Joel: timetrace of a few HR peaks as in flux mode?
  • Get sufficient spare orifices (300 and 250 nm)
  • See if we can buy/lease a spare TPS from Tofwerk
  • Bring spare laptop with everything installed, test that everything works, keep in plane
  • Joel: test and enable cell-phone filtering