Difference between revisions of "ARCTAS"
From Jimenez Group Wiki
Line 101: | Line 101: | ||
<h3>Instrument - Critical pre-CARB at Palmdale</h3> | <h3>Instrument - Critical pre-CARB at Palmdale</h3> | ||
* Install MCP | * Install MCP | ||
− | * Check PCI orifice for clogging | + | * Check PCI orifice for clogging- if not, trouble-shoot F11 problem |
* Install MD1 or likewise | * Install MD1 or likewise | ||
** Increase bypass flow on inlet line (now limited to ~2.5 lpm) | ** Increase bypass flow on inlet line (now limited to ~2.5 lpm) | ||
Line 108: | Line 108: | ||
** install TSI flowmeter on this pumping line (filter ahead), log flow | ** install TSI flowmeter on this pumping line (filter ahead), log flow | ||
* Install new Omega PID controller | * Install new Omega PID controller | ||
+ | * Customs list | ||
− | <h3>Instrument - If enough time at | + | <h3>Instrument - If enough time at PMD, approx priority order</h3> |
* Measure IE/AB over a full day (transient effects) | * Measure IE/AB over a full day (transient effects) | ||
− | + | * Install HV supply for hard mirror, so that we can run W-mode in forest fire plumes | |
− | * Install HV supply for hard | ||
* (Waiting for Thomas about TPS error message: uups... / data crc / rx error: 5) | * (Waiting for Thomas about TPS error message: uups... / data crc / rx error: 5) | ||
* Get soldering iron with a finer tip | * Get soldering iron with a finer tip | ||
* Connect UPS software for battery indication | * Connect UPS software for battery indication | ||
* Make sure we have a spare battery for thermocouple in plane | * Make sure we have a spare battery for thermocouple in plane | ||
+ | * Fix 12 V power supply in TPS for preamp | ||
* Get an install 2 bike cupholders | * Get an install 2 bike cupholders | ||
Line 125: | Line 126: | ||
** Fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him | ** Fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him | ||
** Gaps of 5s in fast timetrace? | ** Gaps of 5s in fast timetrace? | ||
− | |||
− | |||
− | |||
* Have MichaelL ship He lecture bottle just before CARB | * Have MichaelL ship He lecture bottle just before CARB | ||
* Investigate how we can refill the lecture bottle (ask Eric Apel) | * Investigate how we can refill the lecture bottle (ask Eric Apel) | ||
− | * | + | |
+ | <h3>For future campaigns</h3> | ||
+ | * Timetrace of a few HR peaks as in flux mode? | ||
+ | * Test and enable cell-phone filtering | ||
* Put together leak detector with V70, controller, AC MD1, and SRS or Balzers RGA | * Put together leak detector with V70, controller, AC MD1, and SRS or Balzers RGA | ||
− | |||
− | |||
Revision as of 12:41, 11 June 2008
The purpose of this page is to serve as a repository of schedules and information for the participation of the Jimenez group in the ARCTAS campaign.
Personnel schedule on group calendar http://www.google.com/calendar/render.
Information on Phase I (past) is below for reference.
Contents
- 1 Summer Phase
- 2 To-do List for ARCTAS
- 2.1 Immediate logistics/parts
- 2.2 Data Analysis before summer (in approx order of priority)
- 2.3 Data analysis before summer, pending enough time
- 2.4 Post ARCTAS-2
- 2.5 For Donna (in approx order of priority)
- 2.6 For Mike on non-immediate timescale, but before summer
- 2.7 Instrument - Critical pre-CARB at Palmdale
- 2.8 Instrument - If enough time at PMD, approx priority order
- 2.9 Before Summer Campaign
- 2.10 For future campaigns
- 3 Integration Phase
- 4 Fairbanks Phase
Summer Phase
Accomodations
- Mike Cubison
- Accomodations for June 13th thru June 26th
- Courtyard in Palmdale
- Confirmation: 80592634
- Phone: 661.947.4100
- Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
- Price $118.00/night
- Accomodations for June 29th
- Edmonton International Airport/Leduc Travelodge Suites
- Confirmation: N469HV
- Price: $82.00/night
- Transportation: shuttle to and from airport
- Bus leaves from airport at 13:30 June 30th for Cold Lake
- More Details Coming soon
- Accomodations for June 30th thru July 12th
- Cold Lake Base
- Confirmed - Confirmed-no confirmation code
- $25.00/night
- Accomodations for June 13th thru June 26th
- Jose Jimenez
- Accomodations for June 13th thru June 26th
- Courtyard in Palmdale
- Confirmation: 80592634
- Phone: 661.947.4100
- Address: 530 West Rancho Vista Blvd. Palmdale, CA 93551
- Price: $118.00/night
- Accomodations June 26th thru July 12th
- Cold Lake Base
- Confirmation - Confirmed-no confirmation code
- $25.00/night
- Bus leaves from Cold Lake at 6:30 and arrives at Airport at 11:30.
- Accomodations for June 13th thru June 26th
- Donna Sueper
- Accomodations June 26th thru July 6th
- Cold Lake Base
- Confirmation - Confirmed-no confirmation code
- Accomodations June 26th thru July 6th
Transportation
- Mike Cubison and Jose Jimenez
- Date: June 13 thru June 14th
- Company: Hertz
- Location: Palmdale Airport
- Confirmation Number: E0402631248
- Price: 34.49 (10% disc. for CU)
- Details: Have flight number so will make sure that they stay open until arrival
- Date: June 14th
- Company: Enterprise
- Location: 445 W. Palmdale Blvd./Palmdale, CA/93551
- Phone: 661.274.2585
- Confirmation: Jose Jimenez
- Details: Open from 9:00am until noon on Sat. the 14th. There is a Hertz rental car right next to enterprise. When the Hertz car is checked out the day before let them know you will be returning it at a different location. Otherwise you can call Enterprise for pickup at the number above.
- Date: June 13 thru June 14th
To-do List for ARCTAS
Immediate logistics/parts
- Make basic loss calculations (inc res time) on inlet
- (New vac pump?)
- test new pump in lab with needle valve for max obtainable flow
- Check we have enough MCPs (2 sets)
- Find 3rd TSI flowmeter
Data Analysis before summer (in approx order of priority)
- Process fast data and resubmit with those
- Re-generate slides from mid-campaign prez with new data
- Generate PToF data:
- Compare to Grimm, LARGE OPC+SMPS, SP2 OPC (>250nm) to evaluate size transmission
- Evaluate whether the different slopes with light scattering are due to size distribution changes (F8)
Data analysis before summer, pending enough time
- Evaluate the O/C data from Allison
- Why are filter levels for Org (maybe also NO3, m/z 16) variable (TO/landing)?
- is it mz29 or 44? Quantify in TT and squirrel
- Implement the time-dependent CO2 and H2O corrections for the flights (or decide that they are not needed)
- We can probably measure frag_org[18] directly in this way
- Use plumes to align our data to others
Post ARCTAS-2
- Repeat PCI transmission experiment
For Donna (in approx order of priority)
- Improve Squirreling of the Fast Mode data (F4 and/or F5)
For Mike on non-immediate timescale, but before summer
- Backup all plane software (incl LabVIEW,TD) on FTP site (including menus and .set files)
- Replot timetrace of all flights on "standard format", give copy to Jose for reference)
- Install all plane software on Mike's old laptop, so that his personal laptop can serve as backup for plane laptop in case of catastrophic failure, and test that it works
- Start, mid-flight, and shutdown checklists
- Get BWP off c-ToF or JJ and test it (out of vac) to verify correct software operation
Instrument - Critical pre-CARB at Palmdale
- Install MCP
- Check PCI orifice for clogging- if not, trouble-shoot F11 problem
- Install MD1 or likewise
- Increase bypass flow on inlet line (now limited to ~2.5 lpm)
- Change our inlet line to 3/8" to allow more flow if possible
- If we can afford the pumping, replumb the Grimm to sample through a critical orifice
- install TSI flowmeter on this pumping line (filter ahead), log flow
- Install new Omega PID controller
- Customs list
Instrument - If enough time at PMD, approx priority order
- Measure IE/AB over a full day (transient effects)
- Install HV supply for hard mirror, so that we can run W-mode in forest fire plumes
- (Waiting for Thomas about TPS error message: uups... / data crc / rx error: 5)
- Get soldering iron with a finer tip
- Connect UPS software for battery indication
- Make sure we have a spare battery for thermocouple in plane
- Fix 12 V power supply in TPS for preamp
- Get an install 2 bike cupholders
Before Summer Campaign
- Be ready to submit data 48 hrs after each flight (24 better if possible)
- Think whether to run at higher MCP and lower emission current for forest fires (less chance of missing threshold, reduce change of saturation in fires)
- Stuff for Joel
- Fix timetrace for Fast mode (SO4 goes down, others go up) -- already told him
- Gaps of 5s in fast timetrace?
- Have MichaelL ship He lecture bottle just before CARB
- Investigate how we can refill the lecture bottle (ask Eric Apel)
For future campaigns
- Timetrace of a few HR peaks as in flux mode?
- Test and enable cell-phone filtering
- Put together leak detector with V70, controller, AC MD1, and SRS or Balzers RGA
Integration Phase
(inclusive dates):
- 2/22: Truck leaves Boulder with AMS and rest of kit
- 2/29: Truck arrives in Palmdale,
- 3/4: AMS onto plane
- 3/12: Power Check
- 3/17: Safety Brief
- 3/18-20: Test Flights
- 4/1: Transit to AK
Fairbanks Phase
Timeline
- 4/1 Jose travels to AK
- 4/4 Anticipated first science flight
- 4/21 DC-8 transit to Palmdale - Mike.
- 4/24 Mike travels back to CO
Hotel for J-Group
- Company: Sophie's Station
- Phone: 1-800-528-4916
- Dates: April 1st - April 21st
- Name on Reservation: Jose Jimenez & Mike Cubison
- Confirmation Number: 2733120
- Total: $75.00/ night to be paid on-site
- Details: 24 hour cancellation