FLAME-2

From Jimenez Group Wiki
Revision as of 13:37, 30 November 2007 by Mlechner2 (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search


(Last updated by Jose on 13-May-2007)

Objectives

  1. Given the clear distinction between flaming, smoldering burns...
    • Volatility of the two
    • Elemental composition of the two (O/C, inorg/org)
  2. High t-resolution from HIAPER instrument: correlation with other measurements
  3. Comparison of desorber with "regular" AMS (loading, chemistry)
  4. Comparison of two volatility measurements (desorber, denuder)

Instruments

ToFs

  1. HIAPER instrument w/W-ToF (stack burns)
  2. Aerodyne W-ToF
  3. CSU W-ToF

Configuration

  • Aerodyne: Li+
  • CSU: denuder
  • HIAPER: desorber

Power Needed

Power seems to be very tight. We have 3 x 15 A (45 A, 110 A) circuits to share between 3 AMSs and auxiliary pumps & equipment. The power demand for the instruments we plan to bring is 40 A:
  • 3 AMSs (3 x 6 A = 18 A)
  • a sampling pump (4 A)
  • SMPS (4 A)
  • atomizer pump (4A)
  • thermal denuder (4 A)
  • laptops for TD & valve system (2A)
  • DustTrak (0.5 A)
  • 4 personal laptops (4 A)


Schedule

PLEASE add details on your plans / itinerary as soon as known

Period 1: Stack Setup, May 19-20 (Sat-Sun)

Instruments running:

  • HIAPER instrument only (maybe w/ PAM or denuder)

Personnel:

  • JOSE (will arrive 19 in morning)
  • Taehyoung (arriving either 19 or 20 with CSU people)

Period 2: Stack Burns, May 21-25 (Mon-Fri)

Instruments Running:

  • HIAPER instrument only (maybe w/ PAM or denuder)
  • Possibly thermal desorber

Personnel

  • JOEL (will arrive AM May 20, leave evening 25
  • JOSE (19-22 evening)
  • Taehyoung

Period 3: Chamber Setup, May 26-28 (Sat-Mon)

Instruments being set up: all three AMSs

Personnel

  • ACHIM: Arrive afternoon of Sat 26
  • JESSE: Arrive afternoon of Sat 26
  • JENNY (ARI)
  • JOSE: Arrive morning of Sun 27
  • CLAUDIA (CU): Arrive morning of Sun 27
  • Taehyoung

Period 4: Chamber Burns, May 29-June 6 (Tue - Wed)

Instruments running: all three AMSs

Personnel

  • ACHIM - leaves June 8
  • JESSE - leaves June 8
  • JENNY (ARI)
  • JOSE -- till May 31st, and May 3-4 (with family nearby in May 31-June 3 afternoon)
  • CLAUDIA (CU): Running TD -- arrive May 27, leave Jun 3 (evening)
  • ALEX: arrive Jun 2 (eve) till end on June 6 (evening)
  • Taehyoung (CSU)

Logistics

Lodging

  • CU group will stay in dorms when possible
  • ARI group will stay at hotel

Cell Phone Numbers

  • Jose: 303-328-7599
  • Joel: 303-524-2205
  • Jesse: 781-413-4558
  • Taehyoung: 970-556-8876

Rental Car(s)

  • Jose will rent a car for stack and chamber burns periods (insurance is only valid if driven by CU personnel)
  • ARI will rent a car for chamber burns period