Difference between revisions of "CalNex-LA"

From Jimenez Group Wiki
Jump to: navigation, search
(Planned Instrumentation)
(Dates and Location)
Line 7: Line 7:
 
== Dates and Location ==
 
== Dates and Location ==
  
The tentative dates for the CalNex-LA site are 5 weeks of measurements (not including setup time) within May 10-June 28, 2010. The exact dates should become clear in early Fall 2009.
+
The tentative dates for the CalNex-LA site are:
 +
 
 +
* Setup and start of measurements: week of May 24-30
 +
* Official measurement period: May 31-June 27
 +
* Tear Down: June 28-30
 +
 
 +
These dates may be move up by a week to maximize overlap with other platforms, especially the NOAA P3.
  
 
Tentatively the site is planned to be located at the [http://www.arb.ca.gov/qaweb/site.php?s_arb_code=70087 Los Angeles North Main St.] site, which has been used for air quality monitoring in LA for a long time. It is just 2 miles N of downtown LA, in a building of the LA Division of Water and Power. [http://maps.google.com/maps?q=1630+North+Main+Street,+Los+Angeles+CA+90012 This is a link to a map of the site in Google Maps]
 
Tentatively the site is planned to be located at the [http://www.arb.ca.gov/qaweb/site.php?s_arb_code=70087 Los Angeles North Main St.] site, which has been used for air quality monitoring in LA for a long time. It is just 2 miles N of downtown LA, in a building of the LA Division of Water and Power. [http://maps.google.com/maps?q=1630+North+Main+Street,+Los+Angeles+CA+90012 This is a link to a map of the site in Google Maps]

Revision as of 23:39, 10 October 2009

This page is a repository of information and links for preparing and executing the field experiment at the Los Angeles CalNex Supersite (*) as part of the CalNex-2010 field campaign. The focus of the campaign is to study nightime chemistry (led by Jochen Stutz of UCLA) and formation of secondary organic aerosol (led by Joost de Gouw of NOAA and Jose-Luis Jimenez of CU-Boulder). Prospective investigators who are interested in participating in this study should contact these PIs.

(*) Not to be confused with the Southern CA EPA Supersite which is headed by Costas Sioutas and located elsewhere.

There is no specific call for proposals for CalNex-LA. NOAA investigators will be funded by internal NOAA funds, while university investigators need to find relevant funding. CARB and NOAA are funding a limited number of external investigators.

Dates and Location

The tentative dates for the CalNex-LA site are:

  • Setup and start of measurements: week of May 24-30
  • Official measurement period: May 31-June 27
  • Tear Down: June 28-30

These dates may be move up by a week to maximize overlap with other platforms, especially the NOAA P3.

Tentatively the site is planned to be located at the Los Angeles North Main St. site, which has been used for air quality monitoring in LA for a long time. It is just 2 miles N of downtown LA, in a building of the LA Division of Water and Power. This is a link to a map of the site in Google Maps

Planned Instrumentation

This information is now kept as a Google Spreadsheet due to easier formatting and modification. It can be viewed in two ways:

  • As a non-editable web page by anyone here
  • As an editable Google Spreadsheet here (email Jose if you want to be able to edit directly)

Reference Information